Lundin Mining Fourth Quarter and Full Year 2011 Results

Production Results Financials

Corporate Office UK Office 

150 King Street West, Suite 1500  70 Oathall Road, Haywards Heath P.O. Box 38  West Sussex, RH16 3EN Toronto, ON M5H 1J9  United Kingdom Phone: +1 416 342 5560  Phone: +44 (0) 1444 411 900 Fax:     +1 416 348 0303  Fax:     +44 (0) 1444 456 901

NEWS RELEASE LUNDIN MINING FOURTH QUARTER AND FULL YEAR 2011 RESULTS  

Toronto,  February  22,  2012  (TSX:  LUN;  OMX:  LUMI)  Lundin  Mining  Corporation  (“Lundin  Mining”  or  the “Company”) today reported net earnings of $183.8 million ($0.32 per share) for the fiscal year ended December 31, 2011 and $42.5 million for the fourth quarter of 2011 ($0.07 per share).

Paul  Conibear,  President  and  CEO  commented,  “We  ended  the  year  with  a  strong  quarter  of  production, achieving  record  tonnages  of  ore  mined  and  milled  at  both  our  Neves‐Corvo  and  Zinkgruvan  mines.    These production  records  occurred  in  parallel  to  achieving  the  best  annual  safety  record  in  the  Company's  history, attesting to improvements made in operations company wide.

The  successful  start  up  of  the  expanded  zinc  plant  at  Neves‐Corvo  in  mid‐2011  has  positioned  the  mine  to become  a  significant  by‐product  producer  of  zinc.  In  parallel  we  advanced  other  internal  growth  studies  to develop strategies to access deeper Lombador mineralization and the exploitation of Semblana. We also have committed  to  our  largest  exploration  program  ever  for  2012  to  extract  value  from  the  multiple  new  high potential exploration targets in and around Neves‐Corvo.

Internally  we have staffed up in our corporate development, technical and  project execution capabilities and have begun to evaluate new growth opportunities.

Tenke finished the year with strong production results and we are very excited about construction progress being made on the Phase II expansion. The significant contribution this outstanding copper operation makes to the Company  is  becoming  quite  evident  and  several  catalysts  for  increasing  asset  value  in  the  year  ahead  are expected as expanded production milestones are achieved.

As  the  year  progressed  the  Company  achieved  improved  operating  cashflow,  and  we  ended  the  year  with  a healthy balance sheet and a strong net cash position."

Summary financial results for the quarter and year are as follows:  

US $ millions (except per share amounts)  Three Months Ended December 311 Year Ended December 311

2011201020112010
Sales Operating earnings2 Net earnings Basic & diluted earnings per share Cash provided by operations Net cash position at December 31242.1309.3 192.3 146.1 0.25 67.9 159.2783.8849.2 461.7 306.3 0.53 276.1 159.2
129.3373.8
42.5183.8
0.070.32
120.3308.7
236.1236.1

1 The prior year comparative figures have been restated in accordance with the transition to IFRS.

2 Operating earnings is a non‐IFRS measure defined as sales, less operating costs (excluding depreciation) and general and administrative costs.

Highlights

A  strong  fourth  quarter  of  production  generated  higher  than  guided  copper  production  while  zinc  and  lead production ended the year essentially in line with expectations.

  • At Neves‐Corvo, ore mined and milled reached record levels. For five consecutive years, Neves‐Corvo has exceeded the previous year's volume of copper ore mined.
  • Zinkgruvan also reached new record levels of ore mined and milled and it ended the year with its best quarter of zinc and copper production.
  • At Aguablanca, significant progress has been made in re‐establishing the pit ramp ahead of restart of nickel/copper mining operations scheduled for the second half 2012.
  • Mining of remnant high grade ore and associated profits from Galmoy continued throughout the year and this provided a better than expected contribution to the Company's cash position.
  • Regarding safety performance, in 2011, Total Recordable Incident Frequency was the lowest in the Company’s history at 1.61. A similar reduction was achieved in the frequency of Lost Time Incidents for the year.
  • The  Company  also  achieved  successful  environmental  performance  with  no  significant  incidents during the year.

Total production, compared to the latest guidance and prior years, was as follows: 

Years ended December 31

201120112010 2009 2008 Actual Actual Actual
ActualGuidance
Copper (tonnes) Zinc (tonnes) Lead (tonnes) Nickel (tonnes)75,87771,50080,035 93,451 97,944 90,129 101,401 151,157 39,568 43,852 44,799 6,296 8,029 8,136
111,445111,500
41,13042,000
nilnil
Copper (tonnes) Tenke attributable (24.75%)31,52330,40029,767 17,325 ‐
  • Operating earnings1 decreased by $87.9 million from $461.7 million in 2010 to $373.8 million in 2011 and sales  decreased  from  $849.2  million  in  2010  to  $783.8  million  in  2011.    Both  the  decreases  in  sales  and operating  earnings1  were  largely  attributable  to  the  suspension  of  operations  at  Aguablanca  which  had  a negative impact of $60.8 million on comparative operating earnings and $131.7 million on sales.
  • Excluding Aguablanca, operating earnings for the year were $390.5 million, only $27.1 million lower than the $417.6 million attributable to 2010. Favourable price and price adjustments ($40.8 million) and higher sales volume ($18.8 million) were more than offset by the effect of higher costs of $61.3 million.  In addition, the € and SEK both strengthened against the US dollar in 2011 compared to 2010, resulting in a further increase in operating costs of $25.4 million.
  • Sales, excluding Aguablanca, increased by $66.3 million from $719.4 million in 2010 to $785.7 million in 2011. Higher metal prices ($40.8 million) and an increase in sales volume ($25.5 million), particularly at Galmoy, contributed to the overall increase.

Average 2011 metal prices for copper and lead were higher by 17% and 12%, respectively, while the average price for zinc remained relatively unchanged compared to 2010.

1 Operating earnings is a non-IFRS measure defined as sales, less operating costs (excluding depreciation) and general and administrative costs.

  • Operating costs (excluding depreciation) increased by $14.7 million year on year; excluding Aguablanca, the increase was $85.5 million and is primarily attributable to:

‐ Neves‐Corvo  ($53.4  million):  higher  production  cost  in  2011  associated  with  the  mining  of  lower grade ore and the increased use of contractors, partially offset by a one‐time prior period royalty charge in 2010 of $8.1 million;

‐ Zinkgruvan ($25.4 million): higher unit costs and the strengthening of the SEK against the US dollar; and ‐ Galmoy ($6.7 million): more than doubling of ore mined and metal produced.

  • General and administrative expenses increased by $7.8 million.  Corporate development costs of $6.8 million were  incurred  in  2011  associated  with  the  planned  merger  with  Inmet  Mining  Corporation  (“Inmet”), responding  to  Equinox  Mineral  Limited’s  (“Equinox”)  unsolicited  take‐over  bid  and  the  Company’s subsequent strategic review.
  • Net earnings of $183.8 million ($0.32 per share) were $122.5 million less than the $306.3 million ($0.53 per share)  reported  in  2010.    In  addition  to  lower  operating  earnings1  of  $87.9  million,  the  decrease  in  net earnings was related to:

‐ higher depreciation ($31.9 million) as a result of increase in ore mined, commissioning of the new zinc expansion at Neves‐Corvo and the new copper mill at Zinkgruvan;

‐ lower net finance income ($49.2 million) due to higher revaluation gain on marketable securities of $39.9 million and gain on derivatives contracts of $10.2 million recorded in 2010; and ‐ goodwill impairment of $35.7 million related to Aguablanca; partially offset by ‐ increase in equity earnings from investment in Tenke Fungurume ($18.8 million), and lower income taxes.

  • Cash  flow  from  operations  for  the  year  was  $308.7  million  compared  to  $276.1  million  for  2010.    The decrease  in  operating  earnings1  of  $87.9  million  is  offset  by  the  net  increase  in  non‐cash  working  capital change of $89.1 million.  Also, included in 2010 is the cash outflow of $30.6 million that the Company paid to settle its derivative contracts.
  • An impairment analysis on the Aguablanca operation concluded that the recoverable value of the mine’s net assets were lower than their carrying value.  Accordingly, a $35.7 million impairment loss was measured and was allocated to goodwill during the fourth quarter of 2011.
  • In  August,  a  new  mine  contractor  was  mobilized  at  Aguablanca  to  commence  pit  push‐backs  and reinstatement  of  the  pit  haul  ramp.  The  restart  of  Aguablanca  concentrate  production  is  expected  in  the second half of 2012.  An underground mining study was also initiated intended to define potential high grade underground feed to supplement open pit production.
  • The Neves‐Corvo Zinc Expansion project was completed in July 2011 on budget and on schedule. Given the continued high price ratio of copper to zinc, this new circuit was converted to processing copper ore until the end of the year for better margins.
  • In  September  2011,  the  Company  released  the  results  of  a  Feasibility  Study  on  the  Lombador  Phase  I development demonstrating that the exploitation of the upper portions of the Lombador zinc/copper ore bodies could extend the mine life to at least 2026 and create a platform for further extensions. The optimal development  plan  for  Lombador  is  being  further  examined  in  conjunction  with  assessing  exploitation concepts for the Semblana copper discovery.

1 Operating earnings is a non-IFRS measure defined as sales, less operating costs (excluding depreciation) and general and administrative costs.

Initial results of the Future Underground Materials Handling Study indicated two preferred options to pursue the  exploitation  of  the  deeper  portions  of  the  Lombador  copper/zinc  resource  and  the  Semblana  copper deposit (see news release dated January 23, 2012 entitled “Lundin Mining Reports on Neves‐Corvo Future  Underground  Materials  Handling  Study”).  Additional  review  is  underway,  taking  into  account  ongoing exploration results, to further assess the two options.

Tenke Fungurume 

  • Another  milestone  at  Tenke  Fungurume  was  achieved  through  the  formal  announcement  of  the advancement of the $850 million Phase II Expansion which will bring total production capability to 195,000 tonnes per annum ("tpa") of copper cathode with associated cobalt. The expansion includes the completion of  mill  upgrades,  acquisition  of  additional  mining  equipment  and  construction  of  a  new  tankhouse. Construction on this major expansion was well advanced by 2011 year end and is tracking on schedule and on budget, targeting completion in first quarter 2013.
  • Milling facilities at the Tenke Fungurume mine continued to perform well with throughput averaging 11,100 metric tons of ore per day in 2011.
  • For the year ended December 31, 2011, Tenke produced 127,367 tonnes of copper and sold 128,284 tonnes at an average realized price of $3.74 per pound. During the year, 11,182 tonnes of cobalt in hydroxide was produced and 11,515 tonnes were sold at an average realized price of $9.99 per pound.
  • Attributable operating cash flow at Tenke Fungurume for 2011 was $149.4 million.
  • During the third quarter of 2011, the Excess Overrun Cost facility (“EOC facility”), related to the Company’s proportionate share of the Phase I development at Tenke, was fully repaid enabling the Company's share of ongoing surplus cash from operations to be utilized to fund the Phase II Expansion.

Attributable net cash flow from Tenke, including repayments of the EOC facility, was as follows: 

(US$ millions)Three months ended Dec 31 2011 2010Year ended Dec 31 2011 2010
Cash advances to Tenke Distributions from Tenke Repayments on EOC facility(34.5) (7.6) ‐ ‐ ‐ 40.4(64.5) (30.5) 7.8 ‐ 108.4 118.7
Attributable net cash (outflow) inflow(34.5) 32.851.7 88.2

Financial Position and Financing 

  • Net cash1 at December 31, 2011 was $236.1 million compared to a net cash1 position $159.2 million at the end of 2010.
  • The $76.9 million increase in net cash during the year was primarily attributable to cash flow from operations ($308.7 million), including $54.8 million generated from working capital offset by:  investment in  mineral property, plant and equipment ($179.1 million), investment in Tenke Fungurume expansion and sustaining capital works ($64.5 million) and net repayment of debt ($10.5 million). Cash on hand at December 31, 2011 was $265.4 million.

1 Net cash/debt is a non-IFRS measure defined as available unrestricted cash less long-term debt and finance leases.

Outlook 

2012 Production and Cost Guidance  

  • 2012  production  targets  and  a  three  year  production  look  ahead  for  wholly‐owned  operations  remains unchanged from the guidance provided on December 12, 2011 (see news release entitled “Lundin Mining  Provides Operating Outlook for 2012‐2014”). 2012 guidance is as follows:

                          2012 Guidance 

(contained tonnes)  Tonnes  C1 Cost  1,2,

Neves‐CorvoCu52,500 – 57,0001.80
Zn30,000 – 40,000

Zinkgruvan  Zn     75,000 – 81,000        0.25   Pb     34,000 – 39,000  Cu       2,000 – 3,000 

Galmoy3Zn4,000 – 4,500
(in ore)Pb500 – 1,000

Aguablanca  Ni     500 – 1,000  Cu       500 – 1,000 

Total: Wholly‐owned operationsCu55,000 – 61,000
Zn109,000 – 125,500
Pb34,500 – 40,000
Ni500 ‐ 1,000

Tenke: 24.0% attributable share  4  Cu  31,560  1.13 

1 Cash costs remain dependent upon exchange rates (€/USD: 1.35, USD/SEK: 6.50) and metal prices (Cu: $3.50, Zn: $0.95).

2 Cash cost is a non‐IFRS measure reflecting the sum of direct costs less by‐product credits.

3 Production tonnage is based on a 50% attributable‐share to Lundin Mining.

4 Freeport‐McMoRan Copper & Gold Inc. (“Freeport”)has provided 2012 sales guidance which is assumed to approximate Tenke’s production. Lundin Mining anticipates production from Tenke’s attributable share will be reduced to 24.0% from 24.75% after obtaining approval of the modifications to  the bylaws.

  • Neves‐Corvo: Copper production is expected to be reduced from previous years as remaining reserves are lower grade stockworks which provide for less predictable ore characteristics, lower recoveries and higher costs. Zinc production is expected to be at least 30,000 tonnes.
  • Zinkgruvan: Zinc, lead and copper production are expected to see modest increases compared to 2011 with further upside potential depending on plant de‐bottlenecking initiatives.
  • Aguablanca: Production is expected to resume in the second half of 2012.  Reserves represent approximately five years of production, averaging 7,500 tonnes of nickel and 6,500 tonnes of copper per annum.
  • Galmoy:  High  grade  mining  is  expected  to  conclude  in  the  first  half  of  2012,  with  sales  continuing  to  be recognized into early 2013 as stockpiled ore is milled at a third party processing facility.
  • Tenke:  Freeport,  the  mine’s  operator,  expects  sales  of  copper  to  increase  to  131,500  tonnes  with  sales volumes of cobalt comparable to 2011. The Phase II expansion project to 195,000 tpa of copper cathode (production on a 100% basis) is expected to be completed in first quarter 2013.

2012 Capital Expenditure Guidance 

Capital expenditures for 2012 are now expected to be $370 million. This represents a $40 million reduction from our  previously  released  estimate  of  December  12,  2011.  The  change  is  a  result  of  updated  figures  for  new investment in Tenke, and our guidance now includes:

  • Sustaining capital in European operations:  $95 million (2011 ‐ $127 million).  The decrease is related to slightly lower sustaining capital expenditures at Neves‐Corvo for the year ahead.
  • New investment capex in European operations: $65 million (2011 ‐ $52 million), consisting of:

‐ Lombador Phase I ($40 million) including underground development, final SAG mill delivery payments and other critical path items.

‐ Neves‐Corvo dam ($13 million) related to tailings and water storage capacity increases.

‐ Other  plant  improvements  and  debottlenecking  initiatives  ($12  million)  at  both  Neves‐Corvo  and Zinkgruvan.

  • New investment in Tenke: Freeport expects the Phase II expansion at Tenke will be completed by the first quarter of 2013. Lundin Mining's share of expansion funding and sustaining capital funding may be up to $210 million for 2012. As guided by Freeport, total capital expenditure for the Phase II Expansion is expected to be $850 million.  If metal prices remain strong, the capital spend is expected to be cash neutral to the Company, as Tenke's operating cash flows should be sufficient to meet this capital funding requirement.

Exploration Investment 

Exploration  expenditures  are  expected  to  increase  from  $42.6  million  in  2011  to  $50  million  in  2012. Approximately $34 million of this will be spent at Neves‐Corvo, where a 90,000 metre surface drilling program is planned for 2012 which will continue to test resource expansion targets at Semblana in addition to drill‐testing the multiple high priority targets recently identified within the Neves‐Corvo near mine area. In addition, the 2012 exploration  program  is  expected  to  test  several  greenfield  targets  in  the  Iberian  region,  as  well  as  continued resource definition drilling at the Company’s Clare and Lakelands exploration projects in Ireland.

Selected Quarterly and Annual Financial Information  Years ended December 31 

(USD millions, except per share amounts)2011201020095
Sales783.8849.2746.0
Operating costs(382.0)(367.3)(347.2)
General and administrative(28.0)(20.2)(25.6)
Operating earnings1373.8461.7373.2
Depreciation, depletion and amortization(153.8)(121.9)(170.0)
General exploration and project investigation(42.6)(23.6)(22.6)
Income from equity investment in Tenke94.775.90.3
Finance (costs) income, net(13.1)36.1(74.3)
Other income (expenses), net11.5(2.0)11.2
Impairment charges(35.7)‐(53.0)

Earnings from continuing operations 

before income taxes234.8426.264.8
Income tax (expense) recovery(51.0)(119.9)3.3
Earnings from continuing operations183.8306.368.1
Gain from discontinued operations‐‐5.6
Net earnings183.8306.373.7
Shareholders’ equity3,297.93,153.62,915.2
Cash flow from operations308.7276.1137.4
Capital expenditures (incl. Tenke)253.1160.3185.0
Total assets3,864.33,826.33,740.1
Net cash (debt)2236.1159.2(49.3)

Key Financial Data: 

Shareholders’ equity per share3  5.66 5.43  5.03 Basic and diluted earnings per share   0.32 0.53  0.13 Basic and diluted earnings per  share

from continuing operations0.320.530.12
Dividends‐‐‐
Equity ratio485%82%78%

Shares outstanding: 

Basic weighted average582,074,865579,924,538550,000,833
Diluted weighted average582,964,608580,539,367550,045,231
End of period582,475,287580,575,355579,592,464
($ millions, except per share data)Q4‐11Q3‐11Q2‐11Q1‐11Q4‐10Q3‐10Q2‐10Q1‐10
Sales242.1146.2184.0211.5309.3215.1183.1141.7
Operating earnings1129.348.782.2113.6192.3121.582.165.8
Net earnings42.512.457.771.2146.166.042.351.9
Earnings per share6, basic and diluted0.070.020.100.120.250.110.070.09
Cash flow from operations120.3(40.6)96.8132.267.951.170.886.3
Capital expenditure (incl. Tenke)90.758.857.745.942.940.239.138.1
Net cash2236.1208.7308.2262.0159.2125.7107.810.2

The 2011 annual consolidated financial statements and management's discussion and analysis are available on SEDAR (www.sedar.com) and the Company's website (www.lundinmining.com).

1 Operating earnings is a non-IFRS measure defined as sales, less operating costs (excluding depreciation) and general and administration costs.

2 Net cash is a non-IFRS measure defined as available unrestricted cash less long-term debt and finance leases.

3 Shareholders’ equity per share is a non-IFRS measure defined as shareholders’ equity divided by total number of shares outstanding at end of period. 4 Equity ratio is a non-IFRS measure defined as shareholders’ equity divided by total assets at the end of period.

5 Conversion to IFRS on January 1, 2011 requires the completion of IFRS compliant financial statements on a comparative basis with 2010. Financial results prior to 2010 remain unchanged and are reported in accordance with Canadian GAAP.

6 Earnings per share is determined for each quarter. As a result of using different weighted average number of shares outstanding, the sum of the quarterly amounts may differ from the year-to-date amount.

About Lundin Mining 

Lundin Mining Corporation is a diversified base metals mining company with operations in Portugal, Sweden, Spain  and  Ireland,  producing  copper,  zinc,  lead  and  nickel.  In  addition,  Lundin  Mining  holds  a  development project pipeline which includes expansion projects at its Neves‐Corvo mine, along with an equity stake in the world‐class  Tenke  Fungurume  copper/cobalt  mine  in  the  Democratic  Republic  of  Congo,  which  is  undergoing expansion to 195,000 tpa copper cathode production.

On Behalf of the Board,

Paul Conibear President and CEO

For further information, please contact:

Sophia Shane, Investor Relations North America:  +1‐604‐689‐7842 John Miniotis, Senior Business Analyst:  +1‐416‐342‐5565 Robert Eriksson, Investor Relations Sweden:  +46 8 545 015 50

Forward Looking Statements 

Certain of the statements made and information contained herein is “forward‐looking information” within the meaning of the Ontario  Securities Act. Forward‐looking statements are subject to a variety of risks and uncertainties which could cause actual events or results  to differ from those reflected in the forward‐looking statements, including, without limitation, risks and uncertainties relating to foreign  currency fluctuations; risks inherent in mining including environmental hazards, industrial accidents, unusual or unexpected geological  formations,  ground control problems and flooding; risks associated with the estimation of mineral resources  and reserves and the  geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be  consistent with the Company’s expectations; the potential for and effects of labour disputes or other unanticipated difficulties with or  shortages  of  labour  or  interruptions  in  production;  actual  ore  mined  varying  from  estimates  of  grade,  tonnage,  dilution  and  metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected  costs and expenses; commodity price fluctuations; uncertain political and economic environments; changes in laws or policies, foreign  taxation, delays or the inability to obtain necessary governmental permits; receipt of final detailed documentation on by‐law changes  resulting from the contract review process and resolution of administrative disputes in the DRC; and other risks and uncertainties,  including those described under Risk Factors Relating to the Company’s Business in the Company’s Annual Information Form and in  each  management’s  discussion  and  analysis.  Forward‐looking  information  is,  in  addition,  based  on  various  assumptions  including,  without limitation, the expectations and beliefs of management, the assumed long‐term price of copper, zinc, lead and nickel; that the  Company can access financing, appropriate equipment and sufficient labour and that the political environment where the Company  operates  will  continue  to  support  the  development  and  operation  of  mining  projects.  Should  one  or  more  of  these  risks  and  uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in  forward‐looking statements. Accordingly, readers are advised not to place undue reliance on forward‐looking statements.