Interra Copper Announces Positive Geophysical Results on the Rip Copper Project
CSE: IMCX WWW.INTERRACOPPERCORP.COM
INTERRA COPPER ANNOUNCES POSITIVE GEOPHYSICAL RESULTS
ON THE RIP COPPER PROJECT
July 31, 2024, VANCOUVER, British Columbia – Interra Copper Corp. (CSE: IMCX; OTCQB: IMIMF; FRA:
3MX) (“Interra” or the “Company”) is pleased to announce the results of its recently completed
geophysical surveys at the Rip Copper Project (the “Project” or “Rip”) in the Stikine region of British
Columbia. The Rip Project is situated approximately 33 km northeast of Imperial Metals’ past
producing Huckleberry copper-molybdenum (“Cu-Mo”) mine and Surge Copper’s advanced stage
Ox/Seal/Berg projects. Imperial Metals Corporation is exploring Huckleberry and its surrounding
claims for additional Cu-Mo resources.
Recently completed geophysical surveys at Rip, airborne magnetics and 3D IP, carried out by Precision
Geosurveys and Dias Geophysical, respectively, suggest potential for two porphyry Cu-Mo mineralized
centres (Fig. 1). The northernmost centre coincides with outcropping porphyry Cu-Mo mineralization,
and comprises a coincident magnetic/resistivity high, surrounded by a large “doughnut” shaped
chargeability high (> 35 mV/V) with a diameter of approximately 1 km. A second potential porphyry
Cu-Mo centre is situated approximately 1.1 km to the south, comprising a similar magnetic high
surrounded by a “doughnut” shaped chargeability high (> 35 mV/V). This southern potential porphyry
center is entirely covered by overburden with a diameter of approximately 850 meters.
CEO Brian Thurston commented, “With this new geophysical data, we have resolved two classic
porphyry copper-gold deposit style bullseye targets. In well-established porphyry districts like this
one, it is unusual to have untested classic porphyry targets but at Rip one of the targets is entirely
untested by diamond drilling, and the other target was only tested with a single diamond drill hole,
which was aimed away from the centre of the bullseye, but nevertheless hit encouraging
mineralization. In light of this new data, we feel enthused by the untested potential of this property
and are excited to embark on a thoroughly justified drill campaign.”
The Rip project is interpreted as a highly underexplored porphyry Cu-Mo system that is predominantly
covered by overburden. A small outcrop area within the northern interpreted porphyry Cu-Mo
mineralized centre contains variably altered porphyritic intrusions which cut strongly hornfelsed
Hazelton Group volcano-sedimentary rocks. Porphyritic intrusions and hornfelsed country rock are
both host to porphyry style stockwork, including magnetite-chalcopyrite and quartz-chalcopyrite-
molybdenite veins. Historical exploration targeting a large IP anomaly on the project included shallow
percussion drilling of this chargeability anomaly by Kennco and intersected porphyry copper style
alteration and anomalous Cu-Mo mineralization over a broad area. A single diamond drill hole was
collared approximately 200 m north of the discovery outcrop and intersected anomalous Cu (0.07%)
and Mo (0.005%) over 74m in strongly quartz-sericite-pyrite altered volcanic rocks cut by late feldspar
porphyry and mineralized quartz diorite dykes; the bottom 64m consists of intrusive clast -rich
polymictic breccia cut by abundant pyrite, gypsum and quartz veins with local secondary biotite.
Quartz-sericite-pyrite, intermediate argillic and propylitic alteration predominate in the holes,
suggesting that the Kennco holes only tested the upper levels of a shallowly eroded porphyry Cu-Mo
system.
In late 2023, the Company announced its option agreement with ArcWest Exploration Inc. (“ArcWest”)
to acquire an 80% interest in the Rip Cu-Mo project. Interra can earn the first tier of its interest in the
project by completing staged exploration work totalling C$2.0 million and direct payment of
C$100,000 and annual share payments over 4 years until end of 2027. Interra is currently fully funded
for, and anticipates it will likely exceed, its 2024 and 2025 obligations for the earn-in of C$300,000 and
C$500,000 in expenditures respectively. With the recent completion of the geophysical surveys
helping to define drill targets, the Company is now focused on its first phase drill program of
approximately 2000 meters. The drilling is anticipated to begin in September of 2024 and is planned
to test both highly prospective geophysical targets.
Figure 1: RIP Chargeability and Magnetic Survey Results
Rip chargeability
850m elevaon
Rip magnecs
Reduced to the pole
Outcrop
mV/V
Brian G. Thurston, P.Geo., the Company’s President and CEO and a qualified person as defined by
National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved
the technical information in this news release.
About Interra Copper Corp.
Interra Copper Corp. is focused on building shareholder value through the exploration and
development of its two early-stage copper exploration assets located in British Columbia, Canada.
The Thane Project located in the Quesnel Terrane of Northern BC spans over 20,658 ha with 6 high-
priority targets identified demonstrating significant copper and precious metal mineralization. The
Company has an earn-in option up to 80% and joint-venture agreement on the Rip Project located in
Stikine Terrane in a prolific belt of Late Cretaceous (bulkley plutonic suite), known for copper -
molybdenum deposits.
Interra Copper’s leadership team is comprised of senior mining industry executives who have a wealth
of technical and capital markets experience and a strong track record of discovering, financing,
developing, and operating mining projects on a global scal e. Interra Copper is committed to
sustainable and responsible business activities in line with industry best practices, supportive of all
stakeholders, including the local communities in which we operate. The Company's common shares
are principally listed on the Canadian Stock Exchange under the symbol "IMCX". For more information
on Interra Copper, please visit our website at www.interracoppercorp.com.
On behalf of the Board of Interra Copper Corp.
Brian Thurston, P.Geo.
Chief Executive Officer and Director
Tel: 778-949-1829
For further information contact:
Katherine Pryde
Investor Relations
Forward Looking Information
This news release contains certain “forward-looking information” and “forward-looking statements”
(collectively “forward-looking statements”) within the meaning of applicable securities legislation.
Forward-looking statements are frequently, but not always, identified by words such as “expects”,
“anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible”, and similar expressions, or
statements that events, conditions, or results “will”, “may”, “could”, or” should” occur or be achieved.
All statements, other than statements of historical fact, included herein, without limitation, relating to
the expected use of proceeds from the Private Placement, are forward-looking statements. There can
be no assurance that such statements will prove to be accurate, and actual results and future events
could differ materially from those anticipated in such statements. Forward-looking statements reflect
the beliefs, opinions and projections on the date the statements are made and are based upon a
number of assumptions and estimates that, while considered reasonable by Interra, are inherently
subject to significant business, economic, competitive, politica l and social uncertainties and
contingencies. Many factors, both known and unknown, could cause actual results, performance or
achievements to be materially different from the results, performance or achievements that are or
may be expressed or implied by such forward-looking statements and the parties have made
assumptions and estimates based on or related to many of these factors. Such factors include, without
limitation, risks associated with possible accidents and other risks associated with mineral exploration
operations, the risk that the Company will encounter unanticipated geological factors, risks associated
with the interpretation of exploration results, the possibility that the Company may not be able to
secure permitting and other governmental cl earances necessary to carry out the Company's
exploration plans, the risk that the Company will not be able to raise sufficient funds to carry out its
business plans, and the risk of political uncertainties and regulatory or legal changes that might
interfere with the Company's business and prospects. Readers should not place undue reliance on
the forward-looking statements and information contained in this news release concerning these
items. Interra does not assume any obligation to update the forward-looking statements of beliefs,
opinions, projections, or other factors, should they change, except as required by applicable securities
laws.
The Canadian Securities Exchange has not reviewed, approved or disapproved the contents of this
press release, and does not accept responsibility for the adequacy or accuracy of this release.