Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

IVS.V ·

Inventus Provides Operational Update as Trench 1 Bulk Sample Processing Underway and Drilling Continues at the Pardo “River of GOLD” Project

Exploration Programs Metallurgy & Processing

1

NEWS RELEASE

January 27, 2026 TSX-V Trading Symbol: IVS

INVENTUS PROVIDES OPERATIONAL UPDATE AS TRENCH 1 BULK SAMPLE

PROCESSING UNDERWAY AND DRILLING CONTINUES AT THE PARDO “RIVER OF

GOLD” PROJECT

TORONTO, ONTARIO (January 27, 2026) – Inventus Mining Corp. (TSXV: IVS) (“Inventus” or

the “Company”) is pleased announce that processing of the Trench 1 bulk sample is underway at

its 100%-owned Pardo “River of Gold” Project, located 65 km northeast of Sudbury, Ontario.

Highlights

• Trench 1 bulk sample processing is currently underway at McEwen Inc.’s Stock Mill

• An additional seven (7) drill holes have been completed subsequent to the Company’s

January 22, 2026 news release, for a total of 47 drill holes with assay results pending

• Trench 1 North bulk sample advancing, with waste successfully blasted and removed

and extract of the gold mineralization expected to commence shortly

• Bulk sampling and drilling continue to advance in parallel, supporting grade validation,

metallurgical performance, and near-surface continuity

Bulk Sampling Update

The Company confirms that processing of 5,000 tonnes of the 10,128-tonne Trench 1 bulk

sample is currently underway at McEwen Inc.’s Stock Mill. This material was extracted under

the Company’s 50,000 -tonne bulk sample permit, of which only 10,000 tonnes have been

processed to date, and represents a key milestone intended to de-risk development assumptions,

support grade validation and metallurgical performance, and generate operational cash flow.

In addition, the 10,000-tonne Trench 1 North bulk sample is advancing on time and within

budget with waste material now blasted and removed, fully exposing the gold mineralization for

extraction and processing . Drilling and blasting of the mineralized material is expected to

commence shortly, after which material will be crushed on site, and transported for processing.

Drilling Update

Phase 2 drilling at Pardo continues to expand and define the flat-lying gold mineralization. Since

the Company’s January 22, 2026 news release, an additional seven (7) drill holes have been

completed, further testing continuity in preparation for an initial resource estimate on the property.

Drilling continues to follow a staged approach, beginning with wider -spaced step-out drilling to

confirm mineralization, followed by infill drilling for grade estimation and grade-control drilling in

2

advance of future extraction. Assay results from 47 recently completed drill holes are pending

and will be reported once received.

Wesley Whymark, President and Head of Exploration, comments: “With Trench 1 processing

now underway and Trench 1 North advanced to the extraction phase, we are executing our bulk

sampling strategy on time and in budget. At the same time, continued drilling is strengthening our

understanding of grade continuity and will support an initial resource estimate for the property .

These activities collectively represent an important step in advancing Pardo toward potential

development and production.”

For further information visit www.inventusmining.com, or contact:

Mr. Wesley Whymark

President, Head of Exploration and Director

Inventus Mining Corp.

E-mail: [email protected]

Phone: 705-822-3005

Mr. Ed Baer

Investor Relations

Inventus Mining

Phone: 416-804-0512

Social Media Accounts

X

LinkedIn

YouTube

About Inventus Mining Corp.

Inventus is a mineral exploration and development company focused on the world -class mining

district of Sudbury, Ontario . We have a 100% interest in our principal assets, the Pardo

Paleoplacer Gold Project and the Sudbury 2.0 Critical Mineral Project , located northeast of

Sudbury. The Pardo Gold Project is the first important paleoplacer gold discovery in North

America. Inventus has approximately 207.9 million common shares outstanding.

Qualified Person

The Qualified Person responsible for the technical content of this news release is Inventus’

President and Head of Exploration, Wesley Whymark, P.Geo., who has reviewed and approved

the technical disclosure in this news release on behalf of the Company.

Forward-Looking Statements

This News Release includes certain "forward -looking statements" which are not comprised of historical

facts. Forward-looking statements include estimates and statements that describe the Company’s future

plans, objectives or goals, including words to the effect that the Company or management expects a stated

condition or result to occur. Forward -looking statements may be identified by such terms as “believes”,

3

“anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “if”, “yet”, “potential”, “undetermined”,

“objective”, or “plan”. Since forward -looking statements are based on assumptions and address future

events and conditions, by their very nature they involve inherent risks and uncertainties. Although these

statements are based on information currently available to the Company, the Company provides no

assurance that actual results will meet management’s expectations. Risks, uncertainties and other facto rs

involved with forward-looking information could cause actual events, results, performance, prospects and

opportunities to differ materially from those expressed or implied by such forward -looking information.

Forward-looking information in this news release includes, but is not limited to, the Company’s objectives,

goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral

resources, exploration and mine development plan s, timing of the commencement of operations and

estimates of market conditions. Factors that could cause actual results to differ materially from such

forward-looking information include, but are not limited to the failure to identify mineral resources, failure to

convert estimated mineral resources to reserves, the inability to complete a feasibility study which

recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining

or failures to obtain required governmental, environmental or other project approvals, political risks, inability

to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the

availability and costs of financing needed in the future, changes in eq uity markets, inflation, changes in

exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and

operating costs varying significantly from estimates and the other risks involved in the mineral exploration

and development industry, and those risks set out in the Company’s public documents filed on SEDAR +.

Although the Company believes that the assumptions and factors used in preparing the forward -looking

information in this news release are reasonable, undue reliance should not be placed on such information,

which only applies as of the date of this news release, and no assurance can be given that such events will

occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update

or revise any forward -looking information, whether as a result of new information, future events or

otherwise, other than as required by law.

Neither TSX venture exchange nor its regulation services provider (as that term is defined in the policies

of the TSX venture exchange) accepts responsibility for the adequacy or accuracy of this release.