Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

LTHM.CN ·

Idaho Champion Commences Field Work Program at Past Producing Champagne Project

Exploration Programs

Idaho Champion Commences Field Work Program

at Past Producing Champagne Project

• Target identification for upcoming drill program

• Mapping and sampling the many historical pits across the 10 sq.

miles of prospective exploration ground

Toronto, ON – June 9, 2020 - Idaho Champion Gold Mines Canada Inc. (CSE:

ITKO) (“Champion” or the "Company"), announces that the 2020 field work

program (the “Program”) has commenced on the approximately ten (10) sq. miles

of prospective exploration ground in Butte County, Idaho.

The Program, which will act as a precurser to a planned drill program in the

upcoming months, will include:

• Mapping and sampling the many historical prospect pits and past

producing Bema Gold Corporation’s open pit (See Figure 1)

• Additional mapping will be completed to identify alteration zones and

location of the structure and faults within the 10 sq. miles that make up the

property area

• Identifying the historic drilling and trenching locations of the previously

announced historical data (See press releases from May 11, 14, 21 and 26,

2020)

• High definition airborn photography to assist with mapping and target

selection

• Geophysical lines will be located, mapped and sampled for a proposed IP

survey

“Our goal for this Program is to better understand the mineralization in the many

historical pits on the property. We will also look to gain better knowledge about

the regional geology, alteration and structure,” stated Jonathan Buick, President

and CEO “Idaho Champion is confident that the field program will increase our

geologic knowledge at Champagne and better prepare us for the upcoming drill

program.”

Figure 1: Champagne Project Property Boundaries

Rock samples collected will be described and prepared for shipment to an assay

lab yet to be determined. QA/QC protocols will be followed in handling the

samples.

Qualified Person

The technical information in this press release has been reviewed and approved

by Peter Karelse P.Geo., a consultant to the Company, who is a Qualified Person

as defined by NI 43-101. Mr. Karelse has more than 30 years of experience in

exploration and development.

Figure 2: Champagne Project Location Map

About Champagne Project

The Champagne mine was operated by Bema as a heap leach operation on a high

sulfidation gold system that occurs in volcanic rocks. Bema drilled 72 shallow

reverse circulation holes in addition to previous operators drilling and trenching. The

property had no deep drilling or modern exploration since the mine’s closure in early

1992.

The historic Champagne deposit contains epigenetic style gold and silver

mineralization that occurs in strongly altered Tertiary volcanic tuffs and flows of

acid to intermediate composition at Lava Creek. Argillic and sericite alteration is

widespread at the historic Champagne deposit. Silica flooding, alunite and barite

are closely associated with the gold and silver mineralized zone.

Champagne has a near surface cap of gold-silver mineralization emplaced by deep-

seated, structurally controlled shears that acted as conduits for precious metal rich

hydrothermal fluids. High grade zones in the historic Champagne deposit appear to

be related to such feeder shear zones. Drilling in the future to test for polymetallic,

base-precious metal deposits at depth will clarify these relationships.

ABOUT IDAHO CHAMPION

Champion is a discovery-focused gold exploration company that is committed to

advancing its 100% owned highly prospective mineral properties located in Idaho,

United States. The Company’s shares trade on the CSE under the trading symbol

“ITKO”. Champion is vested in Idaho with the Baner Project in Idaho County, the

Champagne Project located in Butte County near Arco, and four cobalt properties

in Lemhi County in the Idaho Cobalt Belt. Idaho Champion strives to be a

responsible environmental steward, stakeholder and a contributing citizen to the

local communities where it operates. Champion takes its social license seriously

and employs local community members to service its operations.

ON BEHALF OF THE BOARD,

“Jonathan Buick”

Jonathan Buick, President and CEO

For further information, please visit the Company’s SEDAR profile at

www.sedar.com or the Company’s corporate website at www.idahochamp.com.

For further information please contact:

Nicholas Konkin, Marketing and Communications

Phone: (416) 477 7771 ext. 205

Email: [email protected]

Cautionary Statements

Neither the Canadian Securities Exchange nor its regulation services provider has

reviewed or accepted responsibility for the adequacy or accuracy of this press release

This press release may include forward-looking information within the meaning of

Canadian securities legislation, concerning the business of the Company. Forward -

looking information is based on certain key expectations and assumptions made by the

management of the Company. Although the Company believes that the expectations and

assumptions on which such forward-looking information is based on are reasonable,

undue reliance should not be placed on the forward-looking information because the

Company can give no assurance that they will prove to be correct. Forward-looking

statements contained in this press release are made as of the date of this press release.

The Company disclaims any intent or obligation to update publicly any forward-looking

information, whether as a result of new information, future events or results or otherwise,

other than as required by applicable securities laws.