Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

TCEC.CN ·

Terra Clean Energy Corp. Plans Summer Drill Program at South Falcon East

Mergers & Acquisitions Exploration Programs

Terra Clean Energy Corp. Plans Summer Drill Program at South

Falcon East

Vancouver B.C., April 28, 2025 – TERRA CLEAN ENERGY CORP. (“Terra” or the “Company”) (CSE:

TCEC, OTCQB: TCEFF, FSE: 9O0, is pleased to announce an upcoming summer drill program at the

South Falcon East Uranium Project (the “ Property”) which hosts the Fraser Lakes B Ura nium

Deposit.

The Property lies 18 km outside the edge of the Athabasca Basin, approximately 50 km east of

the Key Lake uranium mill and former mine (Figure 1). T he Company entered into an option

agreement with Sky harbour Resources Ltd . (“ Skyharbour”) in October of 2022 whereby the

company can earn up to a 75% interest in the Property.

The Company is planning an extensive drill program for the summer of 202 5, consisting of

approximately 2,500 meters of drilling. The purpose is to test an area highlighted in the Winter

2025 program where it is interpreted that a north -northwest trending brittle structure, a north

dipping structure with strong clay alteration, and mineralized pegmatites with hydrothermal

hematite alteration hosted in graphitic pelitic gneiss all intersect. This puts many of the indicators

identified as being key components for higher grade uranium mineralization all in the same

location.

It is generally accepted that for higher grade uranium deposits in the Athabasca Basin you require

several key indicators:

• Graphitic metasediments,

• Brittle reactivated basement structures,

• Reducing fluid (indicated by clay alteration),

• Oxidizing fluid (indicated by hematite alteration, transports uranium),

All these features have now been identified in the Fraser Lakes B deposit area . Where they are

projected to intercept is considered a top priority target area for the discovery of a higher-grade

unconformity related basement hosted uranium deposit and additional mineralized pegmatites.

“The Athabasca Basin is one of the world’s foremost Uranium Basins accounting for some 20% of

world uranium production. It has been well explored and understood for many years attracting

billions of dollars of investment. For these reasons and the fact that o ur VP Exploration has

worked extensively in the Basin and is excited about our findings that it is an immediate priority

to follow up the very encouraging winter results this summer “said Greg Cameron CEO. ‘Finding

an unconformity basin hosted deposit like Eagle Point or Rough Rider would be company

changing” added Greg Cameron.

The upcoming program will be a helicopter supported drill program encompassing seven to ten

diamond drill holes targeting an area approximately 120 to 150 m north of drill holes SF0063,

SF0065, SF0066 and SF0067 which were completed during the winter program (Figure 2). The

results of these drill holes were reported in press releases dated March 10, 2025 and April 1,

2025. The summer field program is anticipated to commence mid-June and run for

approximately 4-5 weeks. The campaign will be executed by Terralogic Exploration Inc. under

the supervision of Terra Logic staff and C. Trevor Perkins, Vice President, Expl oration for Terra

Clean Energy. Operations will be based out of a local contracting camp with helicopter support

for the daily drilling operations. The expected budget for this program is anticipated to be $ 2.0

million.

”The results from the winter drilling program are very encouraging,” commented Trevor Perkins,

Vice President of Exploration for Terra Clean Energy Corp. “ We are excited to get back in there

and test where th e clay alteration intersects the mineralized zone and graphitic sediment

package. This an exciting target as this can bring together many of the key features associated

with the known basement hosted unconformity deposits in the basin”, continued Mr. Perkins.

Samples of the mineralized intervals from the winter program are outstanding. They have been

submitted for analysis at the Geoanalytical Laboratory at the Saskatchewan Research Council in

Saskatoon, Saskatchewan. Results are expected in mid to late May.

Figure 1: South Falcon East Uranium Project Location – Eastern Athabasca Basin, Saskatchewan,

Canada

Figure 2: 2025 – Planned summer drilling area and c ompleted winter drill holes at South Falcon

East Uranium Project

About Terra Clean Energy Corp.

Terra Clean Energy (formerly Tisdale Clean Energy Corp) is a Canadian-based uranium exploration

and development company. The Company is currently developing the South Falcon East uranium

project, which holds a 6.96M pound inferred uranium resource within the Fraser Lakes B Uranium

Deposit, located in the Athabasca Basin region, Saskatchewan, Canada.

ON BEHALF OF THE BOARD OF TERRA CLEAN ENERGY CORP.

“Greg Cameron”

Greg Cameron, CEO

Qualified Person

The technical information in this news release has been prepared in accordance with the

Canadian regulatory requirements set out in National Instrument 43 -101, reviewed and

approved on behalf of the company by C. Trevor Perkins, P.Geo., the Company’s Vice President,

Exploration, and a Qualified Person as defined by National Instrument 43-101.

*The historical resource is described in the Technical Report on the South Falcon East Property,

filed on sedarplus.ca on February 9, 2023. The Company is not treating the resource as current

and has not completed sufficient work to classify the resource a s a current mineral resource.

While the Company is not treating the historical resource as current, it does believe the work

conducted is reliable and the information may be of assistance to readers.

Forward-Looking Information

This news release contains forward-looking information which is not comprised of historical facts.

Forward-looking information is characterized by words such as “plan”, “expect”, “project”,

“intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain

events or conditions “may” or “will” occur. Forward -looking informa tion involves risks,

uncertainties and other factors that could cause actual events, results, and opportunities to differ

materially from those expressed or implied by such forward -looking information, including

statements regarding the potential development of mineral resources and mineral reserves which

may or may not occur. Factors that could cause actual results to differ materially from such

forward-looking information include, but are not limited to, changes in the state of equity and

debt markets, fl uctuations in commodity prices, delays in obtaining required regulatory or

governmental approvals, and general economic and political conditions. Forward-looking

information in this news release is based on the opinions and assumptions of management

considered reasonable as of the date hereof, including that all necessary approvals, including

governmental and regulatory approvals will be received as and when expected. Although the

Company believes that the assumptions and factors used in preparing the forwa rd-looking

information in this news release are reasonable, undue reliance should not be placed on such

information. The Company disclaims any intention or obligation to update or revise any forward-

looking information, whether because of new information, future events or otherwise, other than

as required by applicable laws. For more information on the risks, uncertainties and assumptions

that could cause our actual results to differ from current expectations, please refer to the

Company’s public filings available under the Company’s profile at www.sedarplus.ca.

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of

the CSE) accepts responsibility for the adequacy or accuracy of this release.

For further information please contact:

Greg Cameron, CEO

[email protected]

Terra Clean Energy Corp

Suite 303, 750 West Pender Street

Vancouver, BC V6C 2T7

www.tcec.energy