Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

BFG.CN ·

Bam Bam Signs Contract with Core Driller for Springtime Drilling at Majuba Hill Copper-Gold Porphyry, Nevada

Exploration Programs

1

*Press Release March 17, 2022

Bam Bam Signs Contract with Core Driller

for Springtime Drilling at Majuba Hill

Copper-Gold Porphyry, Nevada

VANCOUVER, BC — March 17, 2022 — Bam Bam Resources Corp. (CSE: BBR / OTC:

NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) is pleased to have signed a core

drilling contract with Falcon Drilling, Inc. for the Majuba Hill Project in Pershing

County Nevada. Falcon drilled at Majuba in 2020 and 2021. Drilling is planned to

begin in mid-April.

Approximately 4,000 meters (13,000 ft) is planned to drill deeper holes below the

copper enriched Known Copper Oxide Zone and to extend the granodiorite footprint

discovered in the Copper-Gold Target area.

2

David Greenway, President and CEO, commented: “This is a key development phase

for Majuba Hill. I expect these deeper holes to expand the copper mineralization

footprint and signify that Majuba can be a very significant source for world copper

demands.”

Project Infrastructure and Development

Copper mineralization at Majuba is centered within a large contiguous land position.

Bam Bam has 100% control of the emerging Majuba Hill Copper District by private

surface and mineral ownership, patented mining claims, and Federal Lode Mining

claims. The property is in Nevada, a Tier 1 mining district that is the most mining

friendly place in North America and has well developed transportation, power, and

workforce infrastructure.

Majuba is easily reache d by 23 miles of well -maintained roads leading from U.S.

Interstate 80. The existing highways are sufficient for transportation of exploration-

size heavy equipment. The Company has engaged EM Strategies -A Westland

Resources Inc. Company provide long -range environmental planning services.

Development logistics can use the 4 lane Interstate 80 highway, Union Pacific railroad

tracks and power, natural gas, and fiber optic transmission lines in the rail – highway

corridor.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has a QA/QC program using best industry practices in place at the

Majuba Hill Project. The samples are transported from the BBR secure warehouse or

directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada.

ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or

Vancouver, B.C. Soil and rock chip samples are transported by the company directly

to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other

elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an

AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are

determined by ALS method ME -ICP61 which is a four acid digestion and ICP -AES

assay. Approximately 5% of the submitted samples are drill duplicates and copper-

gold-porphyry commercial standard reference material pulps.

Qualified Person

The scientific and technical information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137 , a non- independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

3

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the

identification, review and acquisition of latter stage copper and copper/ silver/gold

assets. This is in direct response to the growing worldwide demand and lack of supply

for precious metals fueled by the Green New Deal in the US and most other developed

nations with similar programs aimed at addressing climate change. Such programs

are heavily reliant on silver, gold and especially copper to produce Electric Vehicles

and other renewable power sources, as well as building infrastructure to provide clean

and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156

miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions where government regulations are supportive of mining

operations.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the

Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes

the expectations expressed in such forward-l ooking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam

Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources

Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs,

estimates or opinions, or other factors, should change.