Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

URE.TO ·

Ur‐Energy Announces New Gold Project and Initial Sample Results

Mergers & Acquisitions Exploration Programs Sampling & Geoscience Results

10758 W. Centennial Rd. Suite 200 Littleton, CO 80127 Phone: 720.981.4588 Fax: 720.981.5643 www.ur-energy.com

News Release

Ur‐Energy Announces New Gold Project and Initial Sample Results  

Littleton, Colorado (PR Newswire – January 29, 2018) Ur‐Energy Inc. (NYSE American:URG, TSX:URE)  (the “Company” or “Ur‐Energy”) is pleased to announce its acquisition of a promising gold exploration project in west‐central Nevada. To date, we have staked 102 federal lode mining claims for a property position of approximately 2,100 acres. The Excel Project is located within the Excelsior Mountains, in proximity to the Camp Douglas and Candelaria Mining Districts.

The  Company  became  aware  of  the  mineral  potential  of  this  project  area  from  exploration  data contained within the large geologic database acquired as a part of its 2013 purchase of Pathfinder Mines Corporation.  Compiled  over  several  decades  of  exploration  work  by  major  mining  companies,  the database contains valuable information on hundreds of mineral deposits and historical exploration and development  programs  in  more  than  20  states  in  the  U.S.  We  continue  to  prioritize  the  review  and analysis  of  the  materials  in  this  database,  as  it  provides  abundant  opportunity  to  identify  other exploration projects like the Excel Project for acquisition or to monetize through sales of the data.

In this instance, our review revealed a 1991 exploration program in the area of the Excel Project had encountered  high‐grade  gold  and  silver  assays  from  trenching  activities  within  Permian‐age metasediments.  Company  geologists  conducted  geologic  literature  research  and  field  examinations, resulting in the initiation of land acquisition activities in March 2017. Once a land position was obtained, rock sampling and geochemical soil sampling programs were conducted.

Approximately 60% of the Excel Project is covered with valley fill material (alluvial fans) shed from the surrounding Excelsior Mountains. In most of the project area not covered by valley fill, there is sufficient exposure of bedrock to perform surface rock sampling. We collected select rock samples adjacent to the areas of earlier trenching activities; additionally, samples were collected from many historic prospect pits located along apparent fault structures and in areas of iron‐oxidized (sulfide‐rich) metasediments. The area of rock sampling covered approximately 640 acres (one square mile).

Thirty‐five  select  rock  samples  were  collected  and  sent  to  an  accredited  lab,  ALS  Minerals  of  Reno, Nevada, for multi‐element analyses. Twelve of these samples (34%) had gold assays of greater than two grams per tonne (g/mt) (a common cut‐off grade for open pit gold mines is less than 1 g/mt) and were considered  to  represent  mineralized  bedrock.  Several  of  these  samples  had  much  higher‐grade  gold assays – the highest being 160 g/mt (5.14 ounces per ton (opt)). All mineralized samples were collected from brecciated and silicified metasediments.

The mineralized samples also exhibited consistently high assays for silver, with the highest value of 1090 g/mt  (34.9  opt).  Average  silver  (Ag)  assays  were  greater  than  gold  (Au)  assays  with  a  Ag:Au  ratio  of approximately 12:1. In addition, most of these samples contained high base metal values for copper, lead and zinc. The following table provides the values for the eight highest gold and silver assays, as well as assays for the associated base metals of copper (Cu), lead (Pb) and zinc (Zn):

Sample No.AuAgCuPbZn
EX‐1713.1 g/mt (0.42 opt)142 g/mt (4.5 opt)0.66%2.46%0.21%
EX‐1814.3 g/mt (0.46 opt)639 g/mt (20.4 opt)3.12%>20%5.20%
EX‐203.98 g/mt (0.13 opt)1090 g/mt (34.9 opt)1.66%>20%1.42%
EX‐29160 g/mt (5.14 opt)53.8 g/mt (1.7 opt)‐0.23%‐
EX‐3122.9 g/mt (0.73 opt)142 g/mt (4.5 opt)1.37%0.77%‐
EX‐3264.5 g/mt (2.06 opt)2.9 g/mt (0.1 opt)‐‐‐
EX‐3313.8 g/mt (0.44 opt)109 g/mt (3.5 opt)3.51%0.47%‐
EX‐3431.9 g/mt (1.02 opt)286 g/mt (9.2 opt)5.10%0.57%‐

Additionally,  geochemical  sampling  of  a  consistent  sandy  clay  loam  horizon  was  conducted.  Samples were collected along twenty profiles, designed to investigate mapped structures (faults) underlying the valley  fill.  Multi‐element  analyses  were  conducted  on  all  assay  results  to  determine  background  and anomalous  values  for  metals  and  other  elements  of  interest.  Results  of  this  program  are  extremely encouraging, with gold values in the soils found to be continuously anomalous overlying more than 7,000 feet of a major mapped structure. Such an anomaly may indicate the presence of a mineralized zone associated  with  the  structure.  The  geochemical  signature  of  this  structure  was  further  enhanced  by continuously  anomalous  values  for  silver,  copper  and  lead  found  in  the  same  zone  as  the  high  gold values. This soil geochemistry program has been very successful in developing high‐quality targets for the next phases of exploration on the Excel Project.

Because  of  the  high‐grade  gold  and  silver  assays  contained  in  the  initial  rock  samples  the  Company continues  to  investigate  the  relationship  between  this  mineralization  and  the  complex  structural  and geologic setting of the area. As part of this investigation, Ur‐Energy completed the latest rock sampling program in early January 2018. Results of this work are pending.

Chairman and CEO of Ur‐Energy, Jeff Klenda, said, “Ur‐Energy remains, first and foremost, a low‐cost uranium producer, with its focus on its flagship Lost Creek Property, and the advancement of Shirley Basin toward full permitting and licensure. The opportunities presented by the Excel Project, however, were  too  attractive  not  to  pursue.  We  are  currently  considering  all  prospects  to  advance  this  new exploration  project,  and  to  obtain  value  for  our  shareholders,  whether  drilling  the  project  ourselves, identifying a viable venture partner, or through a sale process.”

Mr.  James  Bonner,  Ur‐Energy  Vice  President  Geology,  Certified  Professional  Geologist  (CPG‐11608),  American  Institute  of  Professional  Geologists,  and  a  Qualified  Person  as  defined  by  NI  43‐101,  has  reviewed and approved the technical disclosure contained in this news release. Mr. Bonner has verified  the sampling, analytical and test data disclosed here. 

About Ur‐Energy 

Ur‐Energy  is  a  uranium  mining  company  operating  the  Lost  Creek  in‐situ  recovery  uranium  facility  in south‐central Wyoming. We have produced, packaged and shipped more than two million pounds from Lost Creek since the commencement of operations. Applications are under review by various agencies to incorporate  our  LC  East  project  area  into  the  Lost  Creek  permits,  and  we  have  begun  to  submit applications for permits and licenses to operate at our Shirley Basin Project. Ur‐Energy is engaged in uranium mining, recovery and processing activities, including the acquisition, exploration, development and operation of uranium mineral properties in the United States. Shares of Ur‐Energy trade on the NYSE American  under  the  symbol  “URG”  and  on  the  Toronto  Stock  Exchange  under  the  symbol  “URE.” Ur‐Energy’s  corporate  office  is  in  Littleton,  Colorado;  its  registered  office  is  in  Ottawa,  Ontario.  Ur‐ Energy’s website is www.ur‐energy.com.

FOR FURTHER INFORMATION, PLEASE CONTACT 

Jeffrey Klenda, Chair and CEO +1 720‐981‐4588 Jeff.Klenda@ur‐energy.com

Cautionary Note Regarding Forward‐Looking Information 

This release may contain “forward‐looking statements” within the meaning of applicable securities laws regarding  events  or  conditions  that  may  occur  in  the  future  (e.g.,  whether  additional  assays  and exploration results will continue to return high values; whether initial analyses and interpretations of the project area will be established and confirmed through future work; whether continued review of the historical  geologic  database  will  continue  to  provide  opportunities  to  monetize  the  asset;  what alternatives for further exploration and development of the project may be adopted by the Company and  whether  value  will  be  obtained)  and  are  based  on  current  expectations  that,  while  considered reasonable by management at this time, inherently involve a number of significant business, economic and competitive risks, uncertainties and contingencies. Factors that could cause actual results to differ materially  from  any  forward‐looking  statements  include,  but  are  not  limited  to,  fluctuations  in commodity  prices;  capital  and  other  costs  varying  significantly  from  estimates;  failure  to  establish estimated  resources  and  reserves;  delays  in  obtaining  or  failures  to  obtain  required  governmental, environmental or other project approvals; inflation; delays in development and other factors described in the public filings made by the Company at www.sedar.com and www.sec.gov. Readers should not place undue reliance on forward‐looking statements. The forward‐looking statements contained herein are based on the beliefs, expectations and opinions of management as of the date hereof and Ur‐Energy disclaims any intent or obligation to update them or revise them to reflect any change in circumstances or in management’s beliefs, expectations or opinions that occur in the future.