Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

IE.TO ·

Ivanhoe Electric’s TyphoonTM Technology Quickly Proves its Power with Discovery in Saudi Arabia Drilling Intersected Copper Mineralization in Three Holes to a Depth Beyond 700 Meters and Remains Open The Joint Venture Has Three TyphoonTM Units Active in Saudi

Drill Results Mergers & Acquisitions Partnerships & JV

1

January 13, 2025

Ivanhoe Electric’s TyphoonTM Technology Quickly Proves its Power

with Discovery in Saudi Arabia

Drilling Intersected Copper Mineralization in Three Holes to a Depth

Beyond 700 Meters and Remains Open

The Joint Venture Has Three TyphoonTM Units Active in Saudi

Arabia

RIYADH, SAUDI ARABIA – Ivanhoe Electric Inc. (“Ivanhoe Electric”) (NYSE American:

IE; TSX: IE) Executive Chairman Robert Friedland and President and Chief Executive

Officer Taylor Melvin are pleased to provide initial drill results from the Company’s

50/50-owned joint venture with Saudi Arabian Mining Company Ma’aden (“Ma’aden”)

(Saudi Stock Exchange Tadawul: 1211). The Joint Venture’s initial drill program focused

on the Umm Ad Dabah prospect, near Ma’aden’s existing Al Amar gold-copper-zinc

mine. The Joint Venture is using Ivanhoe Electric’s advanced TyphoonTM geophysical

surveying systems and Computational Geosciences Inc.’s (“CGI”) industry-leading

inversion software to guide exploration activities.

Mr. Friedland commented: “The rapid drill results achieved by our Joint Venture with

Ma’aden illustrate the powerful capabilities of Ivanhoe Electric’s technology-driven

exploration platform. The power and accuracy of our TyphoonTM geophysical surveying

technology and Computational Geosciences’ software and algorithms enabled us to

discover quickly a new copper zone near the Al Amar district. Imagine what would

happen if we took the power of our technologies to explore all of Saudi Arabia for

copper, gold, nickel, lithium and other metals.”

Mr. Melvin commented: “Our Joint Venture has the right people and technologies to

explore rapidly and accurately for new sources of copper, gold, and other minerals at

depths exceeding one kilometer. We are excited by the initial results at Umm Ad

Dabah.”

Ma’aden CEO Bob Wilt commented: “Ivanhoe Electric’s TyphoonTM technology has been

a significant asset to our exploration program and these initial surveys and drill results

2

demonstrate that these cutting-edge technologies are the right tools to unlock the vast

mineral potential of the Kingdom.”

TyphoonTM and CGI technologies allow for successful, rapid, large-scale and

deep-penetrating geophysical surveys

The Joint Venture’s first TyphoonTM survey covered 76 square kilometers near

Ma’aden’s Al Amar gold-copper-zinc mine. It was completed in March 2024. Subsequent

TyphoonTM surveys have covered an additional 162 square kilometers of the Al Amar

exploration licenses.

Ivanhoe Electric’s 94%-owned subsidiary, Computational Geosciences Inc., is

headquartered in Vancouver, Canada, near the University of British Columbia. CGI

offers world class geophysical data processing capabilities to model a broad range of

surveys in three dimensions. The world-leading performance of its superior algorithms

is driven by adaptive meshes and the ability to identify relevant structures in high

resolution to support geological interpretation and drill hole targeting. Through

advanced research and development, CGI uses machine-learning methods to develop

innovative quality assurance and quality control tools that have been fully integrated

with the TyphoonTM system.

These tools have revolutionized workflow efficiency, enabling CGI to complete tasks

that previously took weeks in just minutes. Importantly, CGI is now able to deliver

complex three-dimensional inversion results within 24 hours of receiving terabytes of

raw data from TyphoonTM geophysical surveys.

The image below highlights the first three areas quickly identified for drilling by the

Joint Venture team, using TyphoonTM and CGI. The Joint Venture team will be seeking

similar and larger anomalies as exploration activities expand across the 48,500 square

kilometers of prospective land included in the Joint Venture.

3

Figure 1. Plan view map of the Umm Ash Shalahib license area, showing TyphoonTM

chargeability anomalies at Umm Ad Dabah, Area B, and Area C.

4

Copper mineralization intersected at Umm Ad Dabah associated with significant

TyphoonTM anomaly

The Umm Ad Dabah prospect is located 6 kilometers to the northeast of Ma’aden’s Al

Amar Mine. The prospect was identified during the initial 76 square kilometer

TyphoonTM survey. CGI rapidly processed and inverted the TyphoonTM geophysical data,

identifying two significant chargeability anomalies that span approximately 4.5

kilometers in length. The southern anomaly, beginning around 200 meters below the

surface and extending beyond 1,000 meters in depth, has a strike length of 1.8

kilometers (Figure 2).

Figure 2. Cross-section through Umm Ad Dabah, looking west, showing the southern

TyphoonTM chargeability anomaly, the location of Joint Venture drill hole collars, their

traces, and total sulfide minerals abundance.

Exploration drilling commenced in August 2024, with a total of 5,490 meters drilled

across eight completed holes (Figure 2). Three of the drill holes intersected copper

mineralization in the southern anomaly, including:

• Hole UAD-005: 13.1 meters @ 1.31% copper and 4.5 grams per tonne of silver

from 717.9 meters

5

• Hole UAD-006: 5.9 meters @ 0.79% copper and 1.9 grams per tonne of silver from

374.5 meters

Mineralization is present as semi-massive to massive accumulations of precious metal-

bearing iron and copper sulfides hosted in altered volcanic and volcaniclastic rocks.

Drilling to date has defined a mineralized system extending over 250 meters in strike

length and 400 meters down dip.

Photo 1. Drill core from discovery hole UAD-005 at Umm Ad Dabah from 725.7 to 729.1

meters showing semi-massive to massive brassy pyrite (an iron sulfide mineral) and

brassy-yellow chalcopyrite (a copper sulfide mineral that is approximately 35% copper

by weight) detected by TyphoonTM.

2025 exploration activities will focus on Al Amar district, Wadi Bidah, and Bir

Umq license areas

Drilling will continue in the Al Amar Belt to explore for additional accumulations of

massive sulfide mineralization, guided by results from an ongoing TyphoonTM survey

and receipt of outstanding assays. Drilling has now moved to Areas B and C south of

the Al Amar Mine (Figure 1).

There are three TyphoonTM systems operating in Saudi Arabia. Two units in the Al Amar

Belt, and the third unit at the Gehab prospect in the Wadi Bidah Belt.

6

Figure 3. Plan view map of southwest Saudi Arabia, showing the Umm Ash

Shalahib, Al Amar, Wadi Bidah, and Bir Umq license areas.

7

Highlighted new drill intercepts from Umm Ad Dabah at the Umm Ash Shalahib

exploration license.

DRILL HOLE LOCATION FROM

(m)

TO

(m)

INTERVAL

LENGTH

(m)

COPPER

(%)

SILVER

(g/t)

UAD-005 Umm Ad

Dabah 699.0 704.0 5.0 0.67 3.4

AND 717.9 731.0 13.1 1.31 4.5

UAD-006 Umm Ad

Dabah 344.6 347 2.4 0.51 1.0

AND 351.0 353.2 2.2 0.41 0.8

AND 374.5 380.4 5.9 0.79 1.9

* Reported intervals are calculated at a cut-off grade of 0.3% copper.

*True width is approximately 50% of interval length.

*Some rounding errors may occur.

8

Photo 2. TyphoonTM deployed on the Umm Ash Shalahib exploration license.