Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

REDC.CN ·

Red Canyon Commences Kendal Ridge Targeted Drill Program

Exploration Programs

Suite 1210 – 1130 West Pender Street

Vancouver, British Columbia, V6E 4A4 Canada

T +1 (604) 681-9100

[email protected]

Red Canyon Commences Kendal Ridge Targeted Drill Program

Vancouver, British Columbia, September 16, 202 5: Red Canyon Resources Ltd. (“Red

Canyon” or the “Company”) (CSE: R EDC | OTCQB: REDRF) is pleased to announce it has

commenced diamond drilling on its 100% owned Kendal copper project in west-central British

Columbia. The Company is f ocused on value-driven exploration to make new discoveries of

copper and copper-gold resources in established mineral belts in North America.

Company Highlights:

• The planned program consists of up to 8 drill holes totalling approximately 2,500 m. Drilling

will target the Kendal Ridge area, an interpreted copper porphyry centre within the 4 km

by 3 km Kendal hydrothermal system.

• The inaugural drilling at Kendal in 2024, identified a large-scale hydrothermal system with

massive fluid flow and low-grade copper and molybdenum (moly) mineralization

throughout all drill holes. These drill holes are interpreted to be drilled on the fringes of a

copper centre at Kendal.

• In 2025, the Compan y conducted e xpanded l ithogeochemical studies , detailed vein

density mapping and a MobileMT geophysic al survey that have identified the Kendal

Ridge area as the most advanced and highest priority target.

• Red Canyon and third-party geological consultants model the Kendal Ridge area within a

broad zone of potassic alteration, suggesting that the core areas of copper mineralization

could be in proximity of surface. The drill program will test a combination of the highest

copper and moly surface mineralization, highest vein density areas, and both complex

magnetics and conductive and resistive zones identified by the recent MobileMT survey

at Kendal (see news release dated August 20, 2025).

• The Company controls a portfolio of seven 100%-owned1, internally generated copper and

copper – gold projects in British Columbia and the Western United States.

Wendell Zerb, the Chairman and CEO of the Company, states: "The Kendal project represents a

large-scale hydrothermal system with potentially multiple copper porphyry centres. Our expanded

work program has greatly enhanced our conviction of the significant scale of the Kendal system

which now spans over 4 km by 3 km. Within this large system, Kendal Ridge is our most advanced

target and the 2025 drill program will focus on this exciting, near surface , interpreted copper

porphyry centre. Furthermore, Kendal is in close proximity to an active labour force, port,

road/highway, and hydroelectrical grid infrastructure, all of which could vastly improve project

economics should our exploration efforts prove successful.”

Kendal Project

Kendal comprises eight 100%-owned mineral claims tota lling 3,582 hectares located in west -

central British Columbia approximately 25 km northeast of the city of Terrace, a regional

infrastructure hub with a well -serviced airport. Infrastructure is excellent with four intersecting

highways, hydroelectric power, rail corridors and port facilities approximately 120 km to the west

at Prince Rupert. The main project area has direct access via logging roads , 8 km east from

Highway 16. The project area lies within the traditional territory of the Kitselas First Nation.

2

Figure 1: Kendal project location and infrastructure map with Red Canyon claims.

Kendal Project Drill Plan

Red Canyon has commenced a diamond drill program consisting of up to 8 drill holes totalling

approximately 2,500 m. Drilling will target the Kendal Ridge area, an interpreted copper porphyry

centre within the large-scale Kendal hydrothermal system.

3

Figure 2: Kendal Project topographic orthophoto looking south, with outline of interpreted alteration and

anomalous geochemical footprint (yellow line).

The planned program will be conducted from a minimum of three drill locations at Kendal Ridge,

all road/trail accessible from established logging road access on the west and south side of Kendal

Creek. Collar locations are designed to optimize drill testing the Kendal Ridge area, which spans

an area of about 850 m by 800 m (Figures 2, 3). The drill program will test a combination of the

highest copper and moly surface rock geochemistry values, highest vein density areas,

thorium/potassium (Th/K) ratio lows, and both complex magnetics and conductive and resistive

zones identified by the recent MobileMT survey conducted at Kendal (Figures 2, 4, 5 ). The

Company anticipates the program to run into late October.

4

Figure 3: Aerial photo of Kendal Ridge area looking WSW. Photo relative location on Figure 2.

Figure 4: Resistivity slice at 250 masl. Kendal project interpreted footprint of Kendal hydrothermal system

defined by an extensive zone of relative conductivity (MobileMT resistivity low).

5

Figure 5: MobileMT Inversion modeled resistivity cross section 1220 looking northeast.

The 2024 diamond drilling program at Kendal encountered an extensive mineralized alteration

footprint indicating a porphyry system with a massive amount of associated hydrothermal fluid

flow. This large alteration footprint and corresponding multiple generations of hydrothermal veins

provides confidence regarding the scale of the hydrothermal system. New results from the

MobileMT survey further establish this confidence and the potential for Kendal to host multiple

higher-grade mineralized centres.

The widespread presence of mineralized, porphyry-style B veins provides strong evidence that

areas of the Kendal system are eroded to the level of the primary potassic alteration zone of the

porphyry system. Much of the observed alteration identified at Kendal is dominantly sericite-

chlorite (SC), which overprints earlier potassic alteration. Recent field work has identified B veins

in the Kendal Ridge area which further extends the known potassic alteration to the west-

southwest over a minimum strike length of 1.5 km. Thus, Kendal is defined by a large zone of

potassic alteration with SC overprinting, with previous drilling only testing a small portion of the

potassic footprint. Furthermore, vectoring to higher grade centres within the potassic alteration

zone is likely to be lateral versus to depth from areas previously drill tested.

On August 26, 2025, the Company announced a non-brokered private placement of Charity Flow-

Through Common Shares to raise gross proceeds of up to C$2,200,000 , which included

participation by a multi -national mining company (see News Release dated August 26, 2025 ).

This financing remains on track and is anticipated to close on September 18, 2025.

6

About Red Canyon Resources

Red Canyon Resources Ltd. (CSE: REDC | OTCQB: REDRF) is a geoscience-driven, discovery-

focused mineral exploration company focused on exploring North America’s top copper

jurisdictions. The Company’s core goal is to make impactful copper discoveries to benefit all

stakeholders. Red Canyon has a portfolio of 100% owned 1 copper and copper -gold porphyry

exploration projects. The Company’s technical team consists of experienced geoscientists with

diverse capital market, small cap and major mining company backgrounds, and a track record of

success.

For more information, please visit the Company's website at www.redcanyonresources.com.

Red Canyon is part of the NewQuest Capital Group which is a discovery-driven investment group

that builds value through the incubation and financing of mineral projects and companies. Further

information about NewQuest can be found on the company website at www.nqcapitalgroup.com.

1’ Red Canyon has two projects subject to option earn in agreements whereby the Company can earn into

100% of the project.

On Behalf of the Board of Directors

Wendell Zerb, P. Geol

Chairman and Chief Executive Officer

+1 (604) 681-9100

[email protected]

For further information, please contact:

Brennan Zerb

Investor Relations Manager

+1 (778) 867-5016

[email protected]

The Canadian Securities Exchange does not accept responsibility for the adequacy or accuracy

of this press release.

Qualified Person:

The technical information contained in this update has been reviewed and approved by Wendell

Zerb, P. Geol, a “Qualified Person” (“QP”) as defined in National Instrument 43-101 – Standards

of Disclosure for Mineral Projects. Mr. Zerb is not independent by reason of being the Chairman,

President and CEO of the Company.

Forward-Looking Statements:

This news release includes certain forward -looking statements and forward -looking information

(collectively, “forward-looking statements”) within the meaning of applicable Canadian securities legislation.

All statements, other than statements of historical fact, included herein including, without limitation,

statements regarding future capital expenditures, exploration activities and the specifications, targets,

results, analyses, interpretations, benefits, costs and timing of them, and the anticipated busi ness plans

and timing of future activities of the Company, are forward -looking statements. Although the Company

believes that such statements are reasonable, it can give no assurance that such expectations will prove

to be correct. Often, but not always, f orward looking information can be identified by words such as “pro

forma”, “plans”, “expects”, “may”, “should”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”,

“anticipates”, “believes”, “potential” or variations of such words including negativ e variations thereof, and

7

phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken

or achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements of the Company to differ materially from

any future results, performance or achievements expressed or implied by the forward -looking statements.

Such risks and other factors include, among others, risks related to the anticipated business plans and

timing of future activities of the Company, including the Company’s exploration plans and the proposed

expenditures for exploration work thereon, the ability of the Company to obtain sufficient financing to fund

its business activities and plans, the ability of the Company to obtain the required permits, changes in laws,

regulations and policies affecting mining operations, the Company’s limited operating history, currency

fluctuations, title disputes or claims, environmental issues and liabilities, as well as those factors discussed

under the heading “Risk Factors” in the Company’s prospectus dated October 12, 2023 and other filings of

the Company with the Canadian Securities Authorities, copies of which can be found under the Company’s

profile on the SEDAR+ website at www.sedarplus.ca.

Readers are cautioned not to place undue reliance on forward -looking statements. The Company

undertakes no obligation to update any of the forward-looking statements, except as otherwise required by

law.