Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

GSRI.CN ·

Golden Shield Resources Drills 1.45 g/t Au over 20 m Including 2.37 g/t Au over 6 m at Marudi Mountain; Provides Drilling Update at Mazoa Hill Deposit

Drill Results Exploration Programs

Golden Shield Resources Drills 1.45 g/t Au

over 20 m Including 2.37 g/t Au over 6 m at

Marudi Mountain; Provides Drilling Update at

Mazoa Hill Deposit

Key Highlights:

1.45 g/t Au over

20 m

at Pancake Creek is the best intersection drilled by

Golden Shield's

RC

drilling campaign to date.

Diamond-drilling at Pancake Creek has been initiated, initial hole completed, second hole

underway.

Initial hole at Mazoa Hill abandoned at 417 metres due to excessive deviation, redrill hole

targeting depth extension to commence following drilling at Pancake Creek.

Samples from

417-meter diamond drill-hole at Mazoa Hill

have been submitted for assay,

results are pending.

VANCOUVER, BC

,

Feb. 1, 2024

/CNW/ -

Golden Shield Resources Inc.

(CSE: GSRI) (OTCQB:

GSRFF) (FRA: 4LE0) (the "

Company

" or "

Golden Shield

") is pleased to announce additional

results from its reverse circulation ("

RC

") drill campaign at the Marudi Mountain Property (

"

Marudi

"). The Company has now received all results from the RC drilling campaign and will use

these to inform targeting in the ongoing diamond drilling program. The Company is also pleased to

provide an update on the ongoing deep drillhole that is actively being drilled at the Mazoa Hill deposit

("

Mazoa Hill

").

Leo Hathaway

, Executive Chairman of

Golden Shield

, commented "The RC results have

defined exciting targets for diamond drill follow up. While drilling at Mazoa Hill deviated more

than expected, it passed through the upper part of the Mazoa Hill deposit and in a direction

not previously drilled, and will be very useful in corroborating previous drill results. We are

excited to be diamond drilling and we continue to learn more with every hole."

Figure 1. Property overview showing exploration targets (CNW Group/Golden Shield Resources)

Table 1. Current Status of Individual Exploration (CNW Group/Golden Shield Resources)

Figure 3. Target Areas for 2024 Diamond Drilling (CNW Group/Golden Shield Resources)

Pancake Creek

The Company has now received results for all of the 2,040 metres in 47 RC drill holes at Pancake

Creek. Preliminary results suggest high-grade gold mineralization from surface (See Table 2), in two

corridors that trend in a northwest-southwest direction. Most notably, drilling intersected 20 metres

at 1.45 g/t Au in hole PC-23-109, to the west of the main drilling trend. The high-grade gold results

are constrained to the mineralized Ferruginous Quartzie ("

FQ

") unit. At this time, the extent, width,

and depth of the two emergent zones at Pancake Creek have not been fully constrained due to the

shallow nature of shallow the RC drilling. However, the

20 m

intersection of mineralized FQ

encountered in hole PC-23-109 represents a new discovery of FQ at Marudi that is being followed

up with drill testing. Currently, one diamond drill hole, PAN24-41 has been completed to 102 metres

in the area and a second drill hole, PAN24-42, is being collared (see Figure 2)

Figure 2. RC Drilling Results from the Pancake Creek Prospect (CNW Group/Golden Shield

Resources)

The results found at the bottom of hole PC-23-108 and throughout hole PC-23-109 define a zone of

near-surface high-grade gold. Diamond drilling will focus on expanding this to depth and laterally.

These results in the western section of Pancake Creek, represent the longest continuous intercept of

gold mineralization encountered in

Golden Shield's

RC drilling campaign. The anomalous areas in the

western part of Pancake (Figure 2) will also be diamond drill tested.

Table 2. Final RC drilling intercepts from 2023 RC drill campaign at the Pancake Creek

Prospect

Drillhole

Depth of hole

(m)

Azimuth

(degrees)

Dip

(degrees)

From

To

*Interval

Au (g/t)

LC-23-RC076

54

35

55

No Significant Intercepts

LC-23-RC077

55

215

55

No Significant Intercepts

LC-23-RC078

50

215

55

No Significant Intercepts

LC-23-RC079

45

215

55

No Significant Intercepts

LC-23-RC080

55

215

55

No Significant Intercepts

LC-23-RC081

46

125

55

No Significant Intercepts

LC-23-RC082

52

215

55

No Significant Intercepts

LC-23-RC083

55

215

55

25

27

2

1.3

LC-23-RC084

54

215

55

No Significant Intercepts

LC-23-RC085

51

35

55

19

21

2

1.6

LC-23-RC086

70

285

50

No Significant Intercepts

LC-23-RC087

60

215

55

No Significant Intercepts

LC-23-RC088

30

215

55

No Significant Intercepts

LC-23-RC089

55

215

55

11

13

2

2.74

LC-23-RC090

55

215

55

No Significant Intercepts

LC-23-RC091

33

35

55

No Significant Intercepts

LC-23-RC092

54

215

55

No Significant Intercepts

LC-23-RC093

54

35

55

No Significant Intercepts

LC-23-RC094

61

90

55

No Significant Intercepts

LC-23-RC095

55

215

55

No Significant Intercepts

LC-23-RC096

32

215

55

No Significant Intercepts

LC-23-RC097

51

215

55

No Significant Intercepts

LC-23-RC098

46

215

55

No Significant Intercepts

LC-23-RC099

29

90

55

No Significant Intercepts

LC-23-RC100

60

217

55

No Significant Intercepts

LC-23-RC101

40

215

68

36

40

4

1.52

LC-23-RC102

60

217

55

28

32

4

4.73

Incl.

28

30

2

12.1

LC-23-RC103

57

217

55

No Significant Intercepts

LC-23-RC104

45

217

60

No Significant Intercepts

LC-23-RC105

46

217

55

No Significant Intercepts

LC-23-RC106

50

217

55

No Significant Intercepts

LC-23-RC107

9

217

55

No Significant Intercepts

PC-23-RC108

38

180

55

No Significant Intercepts

PC-23-RC109

34

180

55

10

30

20

1.45

Incl.

10

14

4

2.48

Incl.

23

29

6

2.37

PC-23-RC110

22

180

60

5

17

12

2.2

Incl.

5

9

4

2.84

Incl.

12

16

4

2.9

PC-23-RC111

25

180

55

No Significant Intercepts

PC-23-RC112

34

180

60

18

23

5

1.21

PC-23-RC113

32

180

60

RESULTS PENDING

PC-23-RC114

29

180

60

RESULTS PENDING

Marudi Drilling Update

Drilling at the Mazoa Hill Deposit (

see

January 24

th

news release

) commenced on

January 13, 2024

.

Unfortunately, the initial hole deviated laterally to the east well beyond the planed limits and passed

through the FQ contact into volcanic wallrock at 367 metres and was terminated at 417 metres (see

Figures 4 and 5). Despite not achieving its target, this hole passed through areas of sparse drilling in

the upper part of the Mazoa Hill deposit and will provide useful geological information on structure

and mineralisation controls. A new hole is being planned that incorporates a larger degree of

planned deviation and this will be drilled following completion of the Pancake Creek program.

Figure 4. Plan Map Showing relative location of MH24-40 at Mazoa Hill (CNW Group/Golden Shield

Resources)

Diamond drill targeting is ongoing, with preliminary diamond drill holes being planned for Marudi

North, and Pancake Creek. Marudi North has seen limited historical diamond drilling but displays

high-grade gold intercepts that occur in the same mineralized FQ unit that hosts mineralization

across the property. The historic intercepts at Marudi North will be followed up to confirm the

existence historical mineralization and confirm the extent of the favourable FQ unit. Pancake Creek

has not seen any historical diamond drilling. The prospect has only become a recent focus of the

Company after its discovery from preliminary fieldwork, trenching, and the RC-drilling reported in this

news release. Both Marudi North, and Pancake Creek occur within

500 m

of each other, and the

Company believes they have the potential to connect.

Figure 5. Drill section looking north. Hole MH24-40 is oriented towards viewer. (CNW Group/Golden

Shield Resources)

Quality Assurance

All

Golden Shield

sample assay results have been independently monitored through a quality control

/ quality assurance ("QA/QC") protocol which includes the insertion of blind standards, blanks as well

as pulp and reject duplicate samples. Logging and sampling are completed at Golden Shield's core

handling facility located at the Marudi property. Drill core is diamond sawn on site and half drill-core

samples are securely transported to Actlabs Guyana Inc ("Actlabs") sample preparation and

analysis facility in

Georgetown

,

Guyana

. Samples are crushed and

pulverised and a 50-gram charge is analysed by Fire Assay with gravimetric finish.

Golden Shield

is

not aware of any drilling, sampling, recovery, or other factors that could materially affect the

accuracy or reliability of the data referred to herein. ACTLABS Laboratories is independent of

Golden Shield

.

Qualified Persons

Leo Hathaway

, P. Geo, Executive Chair of

Golden Shield

, and a Qualified Person as defined by

National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, verified, and

approved the scientific and technical information in this news release and has verified the data

underlying that scientific and technical information.

About

Golden Shield

Golden Shield Resources was founded by experienced professionals who are convinced that there

are many more gold mines yet to be found in

Guyana

. The company is well-financed and has three

wholly controlled gold projects: Marudi Mountain, Arakaka and Fish Creek.

Golden Shield

continues

to evaluate other gold opportunities in

Guyana

.

Connect with

Golden Shield

Email

|

Website

|

Facebook

|

LinkedIn

|

X/Twitter

|

YouTube

|

To register for investor updates please visit

https://goldenshield.ca

This news release includes certain "Forward

Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward

looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward

looking statements or information. These

forward

looking statements or information relate to, among other things: the exploration and

development of the Company's mineral projects; and release of exploration results.

Forward

looking statements and forward

looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of

Golden Shield

, future growth

potential for

Golden Shield

and its business, and future exploration plans are based on

management's reasonable assumptions, estimates, expectations, analyses and opinions, which

are based on management's experience and perception of trends, current conditions and expected

developments, and other factors that management believes are relevant and reasonable in the

circumstances, but which may prove to be incorrect. Assumptions have been made regarding,

among other things, the price of gold and other metals; no escalation in the severity of the COVID-

19 pandemic; costs of exploration and development; the estimated costs of development of

exploration projects;

Golden Shield's

ability to operate in a safe and effective manner and its ability

to obtain financing on reasonable terms.

These statements reflect

Golden Shield's

respective current views with respect to future events and

are necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance, or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward

looking

statements or forward-looking information and

Golden Shield

has made assumptions and

estimates based on or related to many of these factors. Such factors include, without limitation: the

Company's dependence on one mineral project; precious metals price volatility; risks associated

with the conduct of the Company's mineral exploration activities in

Guyana

; regulatory, consent or

permitting delays; risks relating to reliance on the Company's management team and outside

contractors; risks regarding mineral resources and reserves; the Company's inability to obtain

insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations;

risks regarding the failure to generate sufficient cash flow from operations; risks relating to project

financing and equity issuances; risks and unknowns inherent in all mining projects, including the

inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of

such projects; contests over title to properties, particularly title to undeveloped properties; laws and

regulations governing the environment, health and safety; the ability of the communities in which

the Company operates to manage and cope with the implications of COVID-19; the economic and

financial implications of COVID-19 to the Company; operating or technical difficulties in connection

with mining or development activities; employee relations, labour unrest or unavailability; the

Company's interactions with surrounding communities and artisanal miners; the Company's ability

to successfully integrate acquired assets; the speculative nature of exploration and development,

including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts

of interest among certain directors and officers; lack of liquidity for shareholders of the Company;

litigation risk; and the factors identified in the Company's public disclosure documents available on

www.sedar.com

. Readers are cautioned against attributing undue certainty to forward

looking

statements or forward-looking information. Although the Company has attempted to identify

important factors that could cause actual results to differ materially, there may be other factors that

cause results not to be anticipated, estimated or intended. The Company does not intend, and does

not assume any obligation, to update these forward

looking statements or forward-looking

information to reflect changes in assumptions or changes in circumstances or any other events

affecting such statements or information, other than as required by applicable law.

SOURCE

Golden Shield Resources

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/February2024/01/c9390.html

%SEDAR: 00048135E

For further information:

Investor Relations, Email: [email protected], Telephone: +1 604 252

2672

CO: Golden Shield Resources

CNW 06:00e 01-FEB-24