Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

HHE.CN ·

Black Tusk Resources Inc. Completes Diamond Drilling ON the Mckenzie East GOLD Project, Val-D’Or, Quebec

Exploration Programs

BLACK TUSK RESOURCES INC.

500- 666 Burrard Street

Vancouver, BC, V6C 3P6

www.blacktuskresources.com

BLACK TUSK RESOURCES INC. COMPLETES DIAMOND DRILLING

on the

McKENZIE EAST GOLD PROJECT, VAL-D’OR, QUEBEC

April 2 2, 2021, Vancouver, B .C.– Black Tusk Resources Inc. (“Black Tusk” or the “Company) (C: TUSK ,

Frankfurt: 0NB, OTC: BTKRF ) is pleased to announce the results from the first four drill holes on the

McKenzie East gold property located north of Val d’Or, Quebec. Results include 1.185 grams per tonne

gold (gpt Au) over 1 metre from hole MKE-21-01.

The drill hole that showed the most promise during the drilling campaign was hole MKE -21-03. Geologic

observations of that drill hole indicated a section of core that contained a visible gold grain of

approximate 1mm by 2mm size, as well as veining, alterations and associated sulphide minerals over a

wider interval . The sample interval that included the section with the visible gold was analyzed by

metallic assay, as well as the adjoining samples. The results of that analysis are summarized below.

Results of Metallics Assay

Au Total Au coarse Au fine

Hole id Sample id From (m) To (m) Interval width** (m) gpt gpt gpt

MKE21-03 B0116055 87.3 88.3 1 0.35 2.6 0.3

MKE21-03 B0116056* 88.3 89.3 1 0.61 8.01 0.3

MKE21-03 B0116057 89.3 90 0.7 0.13 0.06 0.14

*Section containing visible gold

** True width not known

The section containing the visible gold returned a weighted average 0.61 gpt Au. However, the coarse

fraction contained 8.01 grams per tonne indicating that coarse gold was a significant part of the overall

content.

Black Tusk continued to test the geophys ical features tested by hole MKE21 -03 with holes MKE21 -04

and MKE21 -08. Hole MKE21 -04 did not return significant gold results. Results are pending for the

remaining holes.

Gold values returned from the first three holes of drilling include the following:

Summary of gold results holes 1 to 3 (not including metallic assays shown above)

Hole_id Sample_id From (m) To (m) Width* (m) Litho Augpt

MKE-21-01 A0369897 217 218 1 Quartz vein 1.185

MKE-21-01 A0369902 280.1 281.1 1 Quartz vein 0.215

MKE-21-01 A0369905 308 308.5 0.5 Quartz vein 0.279

MKE-21-02 A0369937 125 126 1 3% magnetite 0.201

MKE-21-03 B0116007 29 30 1 1% magnetite 0.183

MKE-21-03 B0116012 34 35 1 bleach altered 0.295

Hole_id Sample_id From (m) To (m) Width* (m) Litho Augpt

MKE-21-03 B0116065 96 97 1 Quartz vein with py 0.188

MKE-21-03 B0116075 105 106 1 Quartz vein with py 0.211

MKE-21-04 No significant Results

*True width not known

The company completed eight diamond drill holes during the winter 2021 campaign, totalling 2,584

metres, as summarized below.

McKenzie East Project drill hole summary

hole_id utmE utmN Azimuth Dip Depth(m)

MKE21-01 312600 5357250 20 -60 402

MKE21-02 312600 5356950 200 -60 312

MKE21-03 312687 5356655 31 -60 337

MKE21-04 312651 5356723F 30 -60 300

MKE21-05 312000 5357100 160 -60 300

MKE21-06 312400 5357500 180 -60 348

MKE21-07 312200 5357550 10 -60 300

MKE21-08 312809 5356754 30 -50 285

Drill core was logged and sampled at the Black Tusk secure facility located near the property. Samples

were taken directly to ALS Lab located in Val d’Or , an accredited laboratory. Samples were continuously

under custody of the Black Tusk team members until delivered to the lab. Black Tusk undertakes QA/QC

procedures including insertion of blanks and standards at regular intervals into the sample stream.

At the lab, the samples underwent ALS analysis ME -ICP41 for 35 elements by Aqua Regia ICP -AES, and

AU-ICP21 for gold by Fire Assay with AES finish. For the observed coarse gold samples, the samples were

processed by Au-SCR21 coarse screening and Fire Assay with AA finish.

The results to date indicate that gold is present within the veins and alterations observed in drill core

from the McKenzie East project. The results for the remaining four drill holes are expected in the coming

weeks. The Black Tusk team will undertake in -depth interpretation once all results from core sampling

have been received and tabulated.

The Black Tusk - McKenzie East program is supervised by VD Géo Service based in Val d ’Or, including

Black Tusk company director Dr. Mathieu Piché, OGQ.

Cautionary Statement

This press release contains forward -looking statements based on assumptions as of that date. These

statements reflect management’s current estimates, beliefs, intentions and expectations; they are not

guarantees of future performance. The Company cautions that all forward -looking statements are

inherently uncertain and that actual performanc e may be affected by a number of material factors,

many of which are beyond the Company’s control. Such factors include, among other things: risks and

uncertainties relating to exploration and development; the ability of the Company to obtain additional

financing; the Company’s limited operating history; the need to comply with environmental and

governmental regulations; fluctuations in the prices of commodities; operating hazards and risks;

competition and other risks and uncertainties, including those des cribed in the Company’s Prospectus

dated September 8, 2017 available on www.sedar.com. Accordingly, actual and future events,

conditions, and results may differ materially from the estimates, beliefs, intentions, and expectations

expressed or implied in t he forward-looking information. Except as required under applicable securities

legislation, the Company undertakes no obligation to publicly update or revise forward -looking

information.

On behalf of the Board of Directors

Richard Penn

CEO

(778) 384-8923