Friday, October 16, 2026
MiningNewsTerminal
Friday, October 16, 2026 Admin

HCH.V ·

Hot Chili Quarterly Report - Period Ending 31 December 2025 PERTH, Australia ,

Financials

PERTH, Australia, Jan. 30, 2026 /CNW/ -

Highlights La Verde Diamond Drilling Rapidly Expands Gold-Rich Major Copper Discovery

Drillhole results released during the quarter confirmed significant expansion of La Verde's high-grade core: DKD032 recorded 529 m grading 0.41% Cu and 0.21 g/t Au from 41m to end of hole, including 148 m grading 0.60% Cu and 0.30 g/t Au from 70 m depth DKD034 recorded 426 m grading 0.37% Cu and 0.08 g/t Au from 194 m depth, including 107 m grading 0.46 % Cu, 0.10 g/t Au from 426 m depth and including 52 m grading 0.50% Cu, 0.08 g/t Au from 566 m depth DKD033, a diamond twin, recorded 495 m grading 0.38% Cu and 0.10 g/t Au from 3 m depth, including 123 m grading 0.50% Cu and 0.13 g/t Au from 289 m depth DKP005D, diamond tail recorded 47 m grading 0.57% Cu and 0.12 g/t Au from 247.5 m depth (original end of hole), including 28 m grading 0.49% Cu and 0.15 g/t Au from 316 m depth Diamond drill results expand an emerging, bulk-tonnage, high-grade core at the La Verde copper-gold (Cu-Au) porphyry discovery and confirm the convergence of the higher-grade mineralisation at depth.

A total of 3,347 m was drilled across nine diamond drillholes during the quarter, with assays pending for six diamond drillholes, including results for drillholes targeting the up-dip potential of the high-grade core.

Higher-grade Copper-Gold Starter Pit for Costa Fuego Materialising

Multiple wide, near-surface Cu-Au intercepts from La Verde highlight the opportunity to incorporate a high-grade starter pit to Costa Fuego, located only 30km south of the planned central processing hub at Productora.

Impact modelling by Hot Chili indicates the potential to add significant additional open pit material to the front end of Costa Fuego's 20-year mine schedule, delivering mine life growth and materially enhancing the financial metrics of Hot Chili's March 2025 PFS.

Regulatory approval1 was received in October, and drill pad clearing commenced in December, to expand drill coverage across La Verde and initiate first-pass drilling, to test adjacent look-alike targets with the potential for a district-scale copper porphyry cluster.

Strategic Partnering Process Advancing

Additional parties have entered the Company's asset-level, strategic partnering processes in relation to the Costa Fuego and Huasco Water Projects (together, the Projects). with several advancing through due diligence, including site visits. The Company has received further non-binding, indicative, incomplete and conditional proposals in relation to potential transactions for the Projects. The Company remains actively engaged in assessing these proposals.

EIA and Development Studies Advancing A$4.6M Cash and A$2.8M in Returns Expected (VAT and JV recoup)

$1.8M in VAT and JV recoup received in January 2026.

______________________________ 1 Regulatory approval refers to a Sectoral Permit, which is the appropriate regulatory authorisation for a project of this scale. A full DIA (Environmental Impact Declaration) would be processed in a next drilling stage following current regulations. Hot Chili remains fully committed to transparency and environmental responsibility in every stage of the project.

Diamond Drilling across La Verde expands the gold-rich major copper discovery in coastal Chile (CNW Group/Hot Chili Limited)

Cautionary Statement – JORC Code (2012)

The Costa Fuego Copper-Gold Project is currently at the Pre-Feasibility Study ("PFS") stage. The production targets and forecast financial information contained in this report are based on technical and economic assessments that are preliminary in nature. While the PFS incorporates Indicated and Inferred Mineral Resources, there is a lower level of geological confidence associated with Inferred Mineral Resources, and no certainty that further exploration or development will result in the conversion of Inferred Mineral Resources to Indicated or Measured categories.

The PFS is not a definitive study and is based on a number of assumptions, including commodity prices, capital and operating costs, metallurgical recoveries, permitting, and other factors, which are subject to change. The outcomes of the PFS should not be used as the basis for a final investment decision. Further work, including additional drilling, metallurgical testing, and detailed engineering, is required before the Company can make a decision to proceed to development.

Of the Mineral Resources scheduled for extraction in the PFS production plan, more than 99% are classified as Indicated, with the remaining <1% as Inferred. The Company has concluded that it has reasonable grounds for disclosing a production target which includes a small amount of Inferred Mineral Resources, as permitted under the JORC Code. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. The viability of the development scenario envisaged in the PFS does not depend on the inclusion of Inferred Mineral Resources. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Measured or Indicated Mineral Resource with continued drilling.

The Mineral Resources underpinning the production target in the PFS have been prepared by a Competent Person in accordance with the requirements of the JORC 2012. For full details on the Mineral Resource estimate, please refer to the ASX announcement of 27 March 2025.

To achieve the outcomes indicated in the PFS, including reaching Definitive Feasibility Study ("DFS"), mine construction and production stages, funding in the order of US$1.27 Billion will be required, including preproduction and working capital and assumed financing charges. Investors should note that that there is no certainty that Hot Chili will be able to raise that amount of funding when needed. One of the key assumptions is that the funding for the Project will be available when required and on acceptable terms. It is also possible that such funding may only be available on terms that may be dilutive to, or otherwise affect the value of, Hot Chili's existing shares. It is also possible that Hot Chili could pursue other value realisation strategies such as debt financing, a sale or partial sale of its interest in the Costa Fuego Copper Project and/or Huasco Water, sale of further royalties and/or streaming rights, sale of non-committed offtake rights, and sale of non-core assets.

The Company cautions that there is no certainty that the results or estimates contained in the PFS will be realised.

This Report contains forward-looking statements. Hot Chili has concluded that it has a reasonable basis for providing these forward-looking statements and believes it has a reasonable basis to expect it will be able to fund development of the Costa Fuego Copper Project. However, a number of factors could cause actual results or expectations to differ materially from the results expressed or implied in the forward-looking statements. Given the uncertainties involved, investors should not make any investment decisions based solely of the results of the PFS.

SUMMARY OF OPERATIONAL ACTIVITIES Rapid Growth of High-Grade Core Continues at La Verde

Diamond drilling (DD) continued during the quarter at La Verde with nine drillholes completed – six from surface and three diamond tails - before the Christmas break on 21 Dec 2025. Phase two drilling aimed to significantly grow the initial porphyry discovery, using DD to verify, extend and expand the mineralisation footprint identified by reverse circulation (RC) drillholes, many of which ended in mineralisation.

Results from the first four diamond drillholes had a significant impact on expansion of the porphyry footprint. Particularly at depth where higher-grade centres converge, with the depth extent now reaching 600m from surface (Figure 1 and 2), as well as identifying a high gold to copper ratio in the north-eastern high-grade core.

The first diamond drillhole, DKD032, located in the north-eastern higher-grade centre, recorded:

529 m grading 0.41% Cu and 0.21 g/t Au from 41m to end of hole including 148 m grading 0.60% Cu and 0.30 g/t Au from 70 m depth

and including 66 m grading 0.45% Cu and 0.31 g/t Au from 295 m depth

Twin drillhole DKD032 significantly extended the discovery drill result from DKP002, which previously recorded 308 m grading 0.5% Cu and 0.3g/t Au from 46m depth to end of hole. Mineralisation extended both laterally and vertically, with end of hole recording 14 m grading 0.35% Cu and 0.12 g/t Au.

The other drilling result released was from DKP005D, a 200 m diamond tail extension, recorded an additional:

47 m grading 0.57% Cu and 0.12 g/t Au from 247.5 m depth (original end of hole), and 28 m grading 0.49% Cu and 0.15 g/t Au from 316 m depth

DKP005D is located in the central higher-grade mineralisation centre, the tail extension of RC drillhole DKP005, and resulted in extension of the eastern flank of the discovery by approximately 60 m. Including the new diamond tail extension, DKP005 now records 317 m grading 0.38% Cu and 0.1 g/t Au from 32 m to 349 m depth including the nonmineralised dyke (previously DKP005 recorded 200 m grading 0.4% Cu and 0.1 g/t Au from 48 m to end-of-hole).

Diamond drillhole DKD033 (twin drillhole to DKP030) was the third result released (Figure 3) and extended the original RC drillhole, recording:

495 m grading 0.38% Cu and 0.10 g/t Au from 3 m depth

including 37 m grading 0.51% Cu and 0.13g/t Au from 202 m and including 123 m grading 0.50% Cu and 0.13g/t Au from 289 m

This represents a 102 m downhole extension to the original intercept, which recorded 393 m grading 0.4% Cu and 0.1 g/t Au from 4 m depth. Mineralisation was also recorded to end-of-hole, with the last 22 m recording 0.18% Cu and 0.04 g/t Au from 521 m depth.

The fourth result, diamond drillhole DKD034, also located in the central high-grade centre (Figure 3), returned an intersection of:

426 m grading 0.37% Cu and 0.08g/t Au from 194 m depth including 107 m grading 0.46% Cu and 0.10g/t Au from 426 m and including 52 m grading 0.50% Cu and 0.08g/t Au from 566 m Drillhole DKD034 also ended in mineralisation, returning 35 m grading 0.27% Cu and 0.06 g/t Au from 679 m.

The Company is reviewing these results and will consider potential re-entry of DKD033 and DKD034 in the future.

In addition, relogging and interpretation of multiple intrusive phases, derived from the diamond drilling campaign, have optimized drill target design and supported the development of an early 4D litho–structural model.

Higher-grade Copper-Gold Starter Pit for Costa Fuego Materialising

Diamond drillholes completed from surface, aiming to test the potential for the higher-grade gold-rich copper mineralisation intersected by DKD032 to extend up to near surface, were also completed during the quarter (DKD035 and DKD036). Results are expected soon and the location of both drillholes in the northeastern high-grade centre, could have a material impact on the La Verde deposit.

Diamond drilling has been instrumental in development of an early "4D litho-structural model" with the interpretation of multiple intrusive phases optimising drill target design. Hot Chili geologists are applying the same targeting strategies that proved successful at the Company's nearby Cortadera Cu-Au porphyry Resource and anticipate these methods will continue to drive growth at La Verde.

Impact modelling by Hot Chili indicates the potential to add significant additional open pit material to the front end of Costa Fuego's 20-year mine schedule, delivering mine life growth and materially enhancing the financial metrics of Hot Chili's March 2025 PFS.

Costa Fuego is significantly leveraged to both copper and gold price, both of which are materially higher than assumptions used in the Company's PFS. Long-term consensus prices for both commodities sit at US$4.51/lb Cu and US$3,137/oz Au1, 5% and 38% higher, respectively. The addition of La Verde adds further leverage and scale.

Clearing of drill pad locations commenced at La Verde in December, in preparation for the expanded exploration drill program, which received regulatory approval in October.

Costa Fuego Project Optimisation Continues

Value Engineering development studies continued during the quarter, advancing several workstreams with global consulting company Ausenco, with focus on optimisation of the Company's PFS, prior to inclusion in a planned Feasibility Study (FS).

The Company's Environmental Impact Assessment (EIA) also continued to advance during the quarter, on track for submission at the end of 2026.

Figure 1. Plan view map of the La Verde porphyry system showing approved extensional collar locations (red points), planned (white traces) and completed DD drilling (black) compared with +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants. Conceptual open pit shells displayed for $US3.50/lb Cu (blue) and $US6.00/lb Cu (green) displayed as dashed lines. See announcement dated 20 January 2026 for JORC Table 1 additional technical information. (CNW Group/Hot Chili Limited)

____________________________________ 1 See Page 23 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Figure 2. NNW facing longitudinal section of the La Verde porphyry system showing +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants following Phase One drilling (top) and with the addition of the first four Phase two drillholes [DKD032, DKD033, DKD034, DKP005D] (bottom). (CNW Group/Hot Chili Limited)

Figure 3. North facing cross section (± 40m clipping) of the La Verde porphyry system showing +0.2% copper (yellow), +0.3% copper (red), +0.4% copper (magenta) mineralisation interpolants before (top) and after (bottom) returned diamond assay results from DKD033 and DKD034. Returned Cu grades shown on hole traces. Conceptual open pit shells1 displayed for $US3.50/lb Cu (blue) and $US6.00/lb Cu (green) displayed as dashed lines and are based on Phase one drilling only. (CNW Group/Hot Chili Limited)

1 See Page 22 of this announcement for detail on the US$3.50 Cu and US$6.00 Cu conceptual open pit shells (Exploration Targets). Any potential tonnage and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Table 1. Drill Holes Completed for La Verde in Quarter 4, 2025

ProspectHole IDNorthEastRLDepthAzimuthDipResults
La VerdeDKP03267859753248391192570270-60Significant result returned Q4 2025
DKP005D6785789324564112444191-60Significant result returned Q4 2025
DKD03367857753247851132543274-60Significant result returned Q1 2026
DKD0346785837324433109671499-59Significant result returned Q1 2026
DKP006D67857213247271130384110-60Results Pending
DKP021D6785619324325117883475-60Results Pending
DKD0356786027324596115327980-60Results Pending
DKD03667860293245971153372130-54Results Pending
DKD0376785842324527112232169-63Results Pending
DKD03867860883246851185306149-65Results Pending

Table 2. Significant Drilling Intersections from La Verde in Quarter 4, 2025

Hole IDCoordinatesAzim.DipHole DepthIntersectionIntervalCopperGoldSilverMolybdenum
NorthEastRLFromTo(m)(% Cu)(g/t Au)(ppm Ag)(ppm Mo)
DKP00326,785,967324,8351,202270-60569.941569.9528.90.410.210.8513
And incl702181480.600.300.8413
And incl295361660.450.310.9610
And incl (to EOH)556569.913.90.350.120.7913
DKP0056,785,789324,5641,12490-60441.2323493170.380.100.923
(incl. new DD tail results from DKP005D)Incl68102340.500.161.210
And incl236294580.550.121.139
And incl316344280.490.151.019
And41242190.320.060.492
DKD0336,785,775324,7851132274-6054334984950.380.100.6927
Or Incl35435400.360.090.6630
Incl202239370.510.131.1943
And incl2894121230.500.130.6739
521543220.180.040.3175
DKD0346,785,837324,433109699-59713.91639230.300.061.1120
1946204260.370.080.7132
Incl4265331070.460.100.9723
And Incl566618520.500.080.9950
679713.934.90.270.060.68183

SUMMARY OF CORPORATE ACTIVITIES Strategic Partnering Process Advancing

Following completion of the Pre-feasibility Studies (PFS) for Costa Fuego and Huasco Water, Hot Chili initiated an assetlevel strategic Partnering Process to introduce one or more qualified partners with the financial, technical and operational capability to assist in funding and delivering each project.

The Partnering Process continues to progress. During the quarter, additional parties have entered the Partnering Process, with several advancing through due diligence, including site visits. The Company has received further nonbinding, indicative, incomplete and conditional proposals in relation to potential transactions for the Projects. The Company remains actively engaged in assessing these proposals.

The Partnering Process may result in a range of transactions for the projects. Investors are cautioned that there is no certainty the Partnering Process will result in a transaction or binding agreement.

BMO Capital Markets has been appointed as financial adviser in connection with the Partnering Process.

The Company will continue to update the market in accordance with its continuous disclosure obligations.

Cash Position

As of 31 December 2025, the Company had cash of A$4.6 million and no debt. The Company has approximately A$2.8 million in funds from VAT repayments and joint venture recoup from its partner CMP, with $1.8m of these funds being received in January 2026. The remaining $1m funds are expected to be received over the coming months.

The operating expenditure for quarter ended 31 December 2025 included payments for staff costs of A$0.6 million and administration and corporate costs of A$1.3 million.

The investing expenditure for quarter ended 31 December 2025 included payments for tenements of A$1.1 million relating to option payment for La Verde and payments for exploration and evaluation of A$6.1 million relating to exploration activities across the La Verde copper-gold porphyry discovery, value engineering works and EIA submission activities.

Capital Structure

The following summarises the Company's securities on issue:

177,561,814 ordinary fully paid shares 1,914,000 options at AUD $1.50 expiring 24 July 2026 3,685,079 service and performance rights

Annual General Meeting

On Thursday, 27 November 2025 the Company's AGM was held with all resolutions passed.

Additional ASX Disclosure Information

ASX Listing Rule 5.3.2: There was no substantive mining production and development activities during the quarter.

ASX Listing Rule 5.3.3 - Schedule of Mineral Tenements as of 31 December 2025.

The schedule of Mineral Tenements and changes in interests is appended at the end of this activities report.

ASX Listing Rule 5.3.4: Reporting under a use of funds statement in a Prospectus does not apply to the Company currently.

ASX Listing Rule 5.3.5: Payments to related parties of the Company and their associates during the quarter per Section 6.1 of the Appendix 5B totalled $188,000. This is comprised of directors' salaries and superannuation of $180,000.

Health, Safety, Environment and Quality

Field operations during the quarter included geological reconnaissance activities, diamond drilling, field mapping, and sampling exercises across the Company's Costa Fuego project landholdings, focused on La Verde. Activities on new tenements are run at the Productora or Cortadera operations centers and their safety statistics are included under the figures for all projects.

There were no Lost Time Injuries (LTI) during the quarter.

Hot Chili's sustainability framework ensures an emphasis on business processes that target long-term economic, environmental and social value. The Company is dedicated to continual monitoring and improvement of health, safety and the environmental systems. There is no greater importance than ensuring the safety of our people and their families.

Table 3. HSEQ Quarter 4 2025 Performance and Statistics

DepositProductoraCortaderaAll Projects
TimeframeQ4 2025Cum.² 2019Q4 2025Cum.² 2019Q4 2025Cum.² 2019
LTI events000608
NLTI events0406011
Days lost0001520263
LTIFR index00020017
ISR index0004950543
IFR Index037039039
Thousands of man-hours4.91091.830725.1484
Incidents on materials and assets010001
Environmental incidents000000
Headcount¹13129296448

Notes: HSEQ is the acronym for Health, Safety, Environment and Quality. LTIFR per million-manhours. Safety performance is reported on a monthly basis to the National Mine Safety Authority on a standard E-100 form;

(1) Average monthly headcount (2) Cumulative statistics since April 2019.

Tenement Changes During the Quarter

During the Quarter, Sociedad Minera La Frontera SpA ("La Frontera") has claimed 3 mining exploration concessions ("Pajonales" "Chilis 19" and "Paulina") which are in process to be constituted. In addition, it acquired two mining concessions in judicial auction, which are indicated below: "Marina 1/10" and "Catita V 1/9". In addition, the four Minori concessions were substituted due to irregularities in their registration. Sociedad Minera El Aguila SpA ("El Aguila") has claimed three mining exploration concessions ("Zapallo 1" "Zapallo 2" and "Zapallo 3") which are in process to be constituted.

The Company's existing tenements are detailed in the table below.

Table 4. Current Tenement Holdings in Chile as of 31 December 2025

Cortadera Project Tenements

Cortadera Project
N°License IDHCH % HeldHCH % EarningArea (ha) Agreement Details
1ALCENIA 1/10100% SMEA SpA50
2AMALIA 942 A 1/6100% Frontera SpA53
3ATACAMITA 1/82100% Frontera SpA82
4CORROTEO 1 1/260100% Frontera SpA260
5CORROTEO 5 1/261100% Frontera SpA261
6CORTADERA 1 1/200100% Frontera SpA200
7CORTADERA 1/40100% Frontera SpA374
8CORTADERA 2 1/200100% Frontera SpA200
9CORTADERA 41100% Frontera SpA1
10CORTADERA 42100% Frontera SpA1
11LAS CANAS 1/15100% Frontera SpA146
12LAS CANAS 16100% Frontera SpA1
13LAS CANAS ESTE 2003 1/30100% Frontera SpA300
14MAGDALENITA 1/20100% Frontera SpA100
15PAULINA 10 B 1/16100% Frontera SpA136
16PAULINA 11 B 1/30100% Frontera SpA249
17PAULINA 12 B 1/30100% Frontera SpA294
18PAULINA 13 B 1/30100% Frontera SpA264
19PAULINA 14 B 1/30100% Frontera SpA265
20PAULINA 15 B 1/30100% Frontera SpA200
21PAULINA 22 A 1/30100% Frontera SpA300
22PAULINA 24 1/24100% Frontera SpA183
23PAULINA 25 A 1/19100% Frontera SpA156
24PAULINA 26 A 1/30100% Frontera SpA294
25PAULINA 27A 1/30100% Frontera SpA300
26PURISIMA 1/8 (1/2 Y 5/6)100% Frontera SpA20NSR 1.5%
27CF 1100% Frontera SpA300
28CF 2100% Frontera SpA300
29CF 3100% Frontera SpA300
30CF 4100% Frontera SpA300
31CF 5100% Frontera SpA200
32CF 6100% Frontera SpA200
33CF 7100% Frontera SpA100
34CF 8100% Frontera SpA200
35CF 9100% Frontera SpA100
36CF 10100% Frontera SpA200
37CF 11100% Frontera SpA200
38CHAPULIN COLORADO 1/3100% Frontera SpA3
39CHILIS 1100% Frontera SpA200
40CHILIS 3100% Frontera SpA100
41CHILIS 4100% Frontera SpA200
42CHILIS 5100% Frontera SpA200
43CHILIS 6100% Frontera SpA200
44CHILIS 7100% Frontera SpA200
45CHILIS 8100% Frontera SpA200
46CHILIS 9100% Frontera SpA300
47CHILIS 10 1/38100% Frontera SpA190
48CHILIS 11100% Frontera SpA200
49CHILIS 12 1/60100% Frontera SpA300
50CHILIS 13100% Frontera SpA300
51CHILIS 14100% Frontera SpA300
52CHILIS 15100% Frontera SpA300
53CHILIS 16100% Frontera SpA300
54CHILIS 17100% Frontera SpA300
55CHILIS 18100% Frontera SpA300
56CORTADERA 1100% Frontera SpA200
57CORTADERA 2100% Frontera SpA200
58CORTADERA 3100% Frontera SpA200
59CORTADERA 4100% Frontera SpA200
60CORTADERA 5100% Frontera SpA200
61CORTADERA 6 1/60100% Frontera SpA265
62CORTADERA 7 1/20100% Frontera SpA93
63CRISTINA 1/40100% SMEA SpA40
64DIABLITO 1/5100% SMEA SpA25
65DONA FELIPA 1/10100% Frontera SpA50
66DORO 1100% Frontera SpA200
67DORO 2100% Frontera SpA200
68DORO 3100% Frontera SpA300
69FALLA MAIPO 2 1/10100% Frontera SpA99
70FALLA MAIPO 3 1/8100% Frontera SpA72
71FALLA MAIPO 4 1/26100% Frontera SpA26
72MINORI 1100% SMEA SpA300
73MINORI 2100% SMEA SpA300
74MINORI 3100% SMEA SpA300
75MINORI 4100% SMEA SpA300
76PORFIADA B100% Frontera SpA200
77PORFIADA D100% Frontera SpA300
78PORFIADA G100% Frontera SpA200
79PORFIADA I100% Frontera SpA300
80PORFIADA II100% Frontera SpA300
81PORFIADA III100% Frontera SpA300
82PORFIADA IV100% Frontera SpA300
83PORFIADA V100% Frontera SpA200
84PORFIADA VI100% Frontera SpA100
85PORFIADA X100% Frontera SpA200
86SAN ANTONIO 1100% Frontera SpA200
87SAN ANTONIO 2100% Frontera SpA200
88SAN ANTONIO 3100% Frontera SpA300
89SAN ANTONIO 4100% Frontera SpA300
90SAN ANTONIO 5100% Frontera SpA300
91SOLAR 1100% Frontera SpA300
92SOLAR 2100% Frontera SpA300
93SOLAR 3100% Frontera SpA300
94SOLAR 4100% Frontera SpA300
95SOLAR 5100% Frontera SpA300
96SOLAR 6100% Frontera SpA300
97SOLAR 7100% Frontera SpA300
98SOLAR 8100% Frontera SpA300
99SOLAR 9100% Frontera SpA300
100SOLAR 10100% Frontera SpA300
101SOLEDAD 1100% Frontera SpA300
102SOLEDAD 2100% Frontera SpA300
103SOLEDAD 3100% Frontera SpA300
104SOLEDAD 4100% Frontera SpA300
105MARINA 1/10100% Frontera SpA100
106CATITA V 1/9100% Frontera SpA9
107CHILIS 19100% Frontera SpA300
108PAULINA100% Frontera SpA100
TOTAL23.162

Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited

Productora Project Tenements

Productora Project
N°License IDHCH % HeldHCH % EarningArea Agreement Details (ha)
1ALGA 7 A 1/3280% SMEA SpA89
2ALGA VI 4100% SMEA SpA2
3ALGA VI 5/2480% SMEA SpA66
4ARENA 1 1/680% SMEA SpA40
5ARENA 2 1/1780% SMEA SpA113
6AURO HUASCO 1A 1/880% SMEA SpA35
7CABRITO-CABRITO 1/980% SMEA SpA50
8CACHIYUYITO 1 1/2080% SMEA SpA100
9CACHIYUYITO 2 1/6080% SMEA SpA300
10CACHIYUYITO 3 1/6080% SMEA SpA300
11CARMEN I, 1/5080% SMEA SpA222
12CARMEN II, 1/6080% SMEA SpA274
13CF 12100% Frontera SpA100
14CF 13100% Frontera SpA200
15CF 14100% Frontera SpA300
16CHICA80% SMEA SpA1
17CHOAPA 1/1080% SMEA SpA50
18CUENCA A 1/5180% SMEA SpA255
19CUENCA B 1/2880% SMEA SpA139
20CUENCA C 1/5180% SMEA SpA255
21CUENCA D80% SMEA SpA3
22CUENCA E80% SMEA SpA1
23ELEONOR RIGBY 1/10100% Frontera SpA100
24ELQUI 1/1480% SMEA SpA61
25ESPERANZA 1/580% SMEA SpA11
26FRAN 1 1/6080% SMEA SpA220
27FRAN 12 1/4080% SMEA SpA200
28FRAN 13 1/4080% SMEA SpA200
29FRAN 14 1/4080% SMEA SpA200
30FRAN 15 1/6080% SMEA SpA300
31FRAN 18, 1/6080% SMEA SpA273
32FRAN 2 1/2080% SMEA SpA100
33FRAN 21, 1/4680% SMEA SpA226
34FRAN 3 1/2080% SMEA SpA100
35FRAN 4 1/2080% SMEA SpA100
36FRAN 5 1/2080% SMEA SpA100
37FRAN 6 1/2680% SMEA SpA130
38FRAN 7 1/3780% SMEA SpA176
39FRAN 8 1/3080% SMEA SpA120
40JULI 10, 1/6080% SMEA SpA300
41JULI 11, 1/6080% SMEA SpA300
42JULI 12, 1/4280% SMEA SpA210
43JULI 13, 1/2080% SMEA SpA100
44JULI 14, 1/5080% SMEA SpA250
45JULI 15, 1/5580% SMEA SpA275
46JULI 16 1/6080% SMEA SpA300
47JULI 17 1/2080% SMEA SpA100
48JULI 1980% SMEA SpA300
49JULI 2080% SMEA SpA300
50JULI 21 1/6080% SMEA SpA300
51JULI 2280% SMEA SpA300
52JULI 23 1/6080% SMEA SpA300
53JULI 24 1/6080% SMEA SpA300
54JULI 2580% SMEA SpA300
55JULI 27 B, 1/1080% SMEA SpA48
56JULI 27, 1/3080% SMEA SpA146
57JULI 28, 1/6080% SMEA SpA300
58JULI 9, 1/6080% SMEA SpA300
59JULIETA 10, 1/6080% SMEA SpA300
60JULIETA 1180% SMEA SpA300
61JULIETA 1280% SMEA SpA300
62JULIETA 13 1/6080% SMEA SpA298
63JULIETA 14 1/6080% SMEA SpA269
64JULIETA 15 1/4080% SMEA SpA200
65JULIETA 1680% SMEA SpA200
66JULIETA 1780% SMEA SpA200
67JULIETA 18 1/4080% SMEA SpA200
68JULIETA 580% SMEA SpA200
69JULIETA 680% SMEA SpA200
70JULIETA 780% SMEA SpA100
71JULIETA 880% SMEA SpA100
72JULIETA 980% SMEA SpA100
73JULITA ¼80% SMEA SpA4
74LEONA 2A 1/480% SMEA SpA10
75LIMARI 1/1580% SMEA SpA66
76LOA 1/680% SMEA SpA30
77MAIPO 1/1080% SMEA SpA50
78MONTOSA 1/480% SMEA SpA35NSR 3%
79ORO INDIO 1A 1/2080% SMEA SpA82
80PEGGY SUE 1/10100% Frontera SpA100
81PRODUCTORA 1/1680% SMEA SpA75
82SUERTE 1/7100% SMEA SpA21
83SUERTE II 1/15100% SMEA SpA15
84TOLTEN 1/1480% SMEA SpA70
85URANIO 1/700 %35025-year Lease Agreement US$250,000 per year (average for the 25 year term); plus 2% NSR all but gold; 4% NSR gold; 5% NSR non- metallic
86ZAPA 1 1/1080% SMEA SpA100
87ZAPA 1/680% SMEA SpA6GSR 1%
88ZAPA 3 1/2380% SMEA SpA92
89ZAPA 5A 1/1680% SMEA SpA80
90ZAPA 7 1/2480% SMEA SpA120
91SIERRA SOLIS 1100% SMEA SpA200
92SIERRA SOLIS 2100% SMEA SpA300
93SIERRA SOLIS 3100% SMEA SpA300
94SIERRA SOLIS 4100% SMEA SpA200
95SIERRA SOLIS 5100% SMEA SpA300
96SIERRA SOLIS 6100% SMEA SpA300
97SIERRA SOLIS 7100% SMEA SpA300
98SIERRA SOLIS 8100% SMEA SpA300
99ZAPALLO 1100% SMEA SpA100
100ZAPALLO 2100% SMEA SpA200
101ZAPALLO 3100% SMEA SpA200
TOTAL17.214

Note. SMEA SpA is subsidiary company - 80% owned by Hot Chili Limited, 20% owned by CMP (Compañía Minera del Pacífico) Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Domeyko Project Tenements

Domeyko Project
N°License IDHCH % HeldHCH % EarningArea (ha)Agreement Details
1ANTONIO 1 1/56100% Frontera SpA280
2ANTONIO 1/40100% Frontera SpA200
3ANTONIO 10 1/21100% Frontera SpA63
4ANTONIO 19 1/30100% Frontera SpA128
5ANTONIO 21 1/20100% Frontera SpA60
6ANTONIO 36 1/15100% Frontera SpA74
7ANTONIO 5 1/40100% Frontera SpA200
8ANTONIO 9 1/40100% Frontera SpA193
9CAZURRO 1100% Frontera SpA200
10CAZURRO 2100% Frontera SpA200
11CAZURRO 3100% Frontera SpA300
12CAZURRO 4100% Frontera SpA300
13CAZURRO 5100% Frontera SpA100
14CAZURRO 6100% Frontera SpA200
15CAZURRO 7100% Frontera SpA200
16CAZURRO 8100% Frontera SpA200
17CERRO MOLY 1100% Frontera SpA300
18CERRO MOLY 2100% Frontera SpA300
19CERRO MOLY 3100% Frontera SpA300
20CERRO MOLY 4100% Frontera SpA300
21CAZURRO 3 1/60100% Frontera SpA300
22CAZURRO 4 1/60100% Frontera SpA300
23CAZURRO 7 1/40100% Frontera SpA200
24EMILIO 1 1/8100% Frontera SpA38
25EMILIO 3 1/9100% Frontera SpA45
26INES 1/40100% Frontera SpA200
27LORENA 1/2100% Frontera SpA2
28MERCEDITA 1/7100% Frontera SpA22
29PRIMO 1 1/6100% Frontera SpA36
30SANTIAGUITO 5 1/24100% Frontera SpA114
31DOMINOCEROS 1/20 (1/4)100% Frontera SpA20100% HCH Dominoceros Purchase Option Agreement US$320,000 (already satisfied) US$680,000 (already satisfied) US$1,000,000 payable by October 25th 2026 US$6,890,000 payable by October 25th 2027
32CF SUR 1100% Frontera SpA300
33CF SUR 2100% Frontera SpA300
34CF SUR 3100% Frontera SpA300
35CF SUR 4100% Frontera SpA300
36CF SUR 5100% Frontera SpA200
37CF SUR 6100% Frontera SpA300
38CF SUR 7100% Frontera SpA300
39CF SUR 8100% Frontera SpA300
40CF SUR 9100% Frontera SpA200
41CF SUR 10100% Frontera SpA200
42CF SUR 11100% Frontera SpA300
43CF SUR 12100% Frontera SpA300
44CF SUR 13100% Frontera SpA300
45CF SUR 14100% Frontera SpA300
46CF SUR 15100% Frontera SpA200
47CF SUR 16100% Frontera SpA300
48CF SUR 17100% Frontera SpA300
49CF SUR 18100% Frontera SpA300
50CF SUR 19100% Frontera SpA300
51CF SUR 20100% Frontera SpA300
52CF SUR 21100% Frontera SpA300
53CF SUR 22100% Frontera SpA300
54CF SUR 23100% Frontera SpA200
55CF SUR 24100% Frontera SpA200
56CF SUR 25100% Frontera SpA300
57CF SUR 26100% Frontera SpA300
58CF SUR 27100% Frontera SpA300
59CF SUR 28100% Frontera SpA200
60CF SUR 29100% Frontera SpA300
61CF SUR 30100% Frontera SpA200
62CF SUR 31100% Frontera SpA300
63CF SUR 32100% Frontera SpA300
64CF SUR 33100% Frontera SpA300
65CF SUR 34100% Frontera SpA300
66CF SUR 35100% Frontera SpA300
67CF SUR 36100% Frontera SpA200
68CF SUR 37100% Frontera SpA200
69DOMEYKO I 1/12100% Frontera SpA60
70DOMEYKO II 1/40100% Frontera SpA200
71KRETA ¼100% Frontera SpA16The mining concession is included in SanAntonio Purchase Option Agreement
72MARI 1100% Frontera SpA300
73MARI 1/12100% Frontera SpA64The mining concession is included in San Antonio Purchase Option Agreement
74MARI 6100% Frontera SpA300
75MARI 8100% Frontera SpA300
76PAJONALES100% Frontera SpA300
TOTAL17.015

Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

El Fuego Project Tenements

San Antonio Project
N°License IDHCH % HeldHCH % EarningArea (ha)Agreement Details
1MERCEDES 1/3100% Frontera SpA50
2PORFIADA A 1/33100% Frontera SpA160
3PORFIADA C 1/60100% Frontera SpA300
4PORFIADA E 1/20100% Frontera SpA100
5PORFIADA F 1/50100% Frontera SpA240
6PORFIADA IX 1/60100% Frontera SpA300
7PORFIADA VII 1/60100% Frontera SpA270
8PORFIADA VIII 1/60100% Frontera SpA300
9PRIMA 1100% Frontera SpA1
10PRIMA 2100% Frontera SpA2100% HCH San Antonio Purchase Option Agreement USD 1,400,000 already paid. US$1,000,000 payable February 8th 2026 US$2,000,000 payable by September 30th 2026 to exercise the El Fuego Option. (2 additional and conditional payments of USD 2,000,000, each one, to be paid by December 31, 2030 under certain conditions detailed at title "Tenement Changes During the Quarter" of this quarterly report.)
11ROMERO 1/31100% Frontera SpA31
12SAN ANTONIO 1/5100% Frontera SpA25
13SAN JUAN SUR 1/5100% Frontera SpA10
14SAN JUAN SUR 6/23100% Frontera SpA90
15SANTIAGO Z 1/30100% Frontera SpA300
16SANTIAGO 1/4 Y 20100% Frontera SpA75
17SANTIAGO 15/19100% Frontera SpA25
18SANTIAGO 21/36100% Frontera SpA76
19SANTIAGO 37/43100% Frontera SpA26
20SANTIAGO A, 1/26100% Frontera SpA244
21SANTIAGO B, 1/20100% Frontera SpA200
22SANTIAGO C, 1/30100% Frontera SpA300
23SANTIAGO D, 1/30100% Frontera SpA300
24SANTIAGO E, 1/30100% Frontera SpA300
TOTAL3.725

Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Cordillera Project
N°License IDHCH % HeldHCH % EarningArea (ha) Agreement Details
1ALBORADA III 1/35100% Frontera SpA162100% HCH Purchase Option Agreement USD 100,000 already paid US$100,000 payable by November 14th 2026 US$100,000 payable by November 14th 2027 US$3,700,000 payable by November 14th 2028 NSR 1% for underground mining and 1,5% for open-pit mining
2ALBORADA IV 1/20100% Frontera SpA54
3ALBORADA VII 1/25100% Frontera SpA95
4CAT IX 1/30100% Frontera SpA150
5CATITA IX 1/20100% Frontera SpA100
6CATITA XII 1/13100% Frontera SpA61
7CORDILLERA 1/5100% Frontera SpA20
8HERREROS 1/14100% Frontera SpA28
9MINA HERREROS III 1/6100% Frontera SpA18
10MINA HERREROS IV 1/10100% Frontera SpA23
11PORSIACA 1/20100% Frontera SpA20
12QUEBRADA 1/10100% Frontera SpA28
13VETA 1/17100% Frontera SpA17
TOTAL776

Note. Frontera SpA is a 100% owned subsidiary company of Hot Chili Limited.

Qualifying Statements

The scientific and technical information relating to the Company's Costa Fuego project in this report has been derived from or is based on the Costa Fuego Copper project pre-feasibility study (the "Costa Fuego PFS" or 2025 PFS), which has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and Joint Ore Reserves Committee of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (the "JORC Code") and reviewed and approved by the "Qualified Persons" as defined under NI 43- 101 and "Competent Persons" as defined under the JORC Code, as set out below. The 2025 PFS was compiled by the Qualified Persons and Competent Persons listed below based on information available up to the effective date of the PFS. Additional details of responsibilities are provided at page 48 of presentation "Costa Fuego Preliminary Feasibility Study March 2025" released on March 27, 2025.

Conceptual Open Pit Shells

Conceptual open pit shells represent Exploration Targets as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code). They are based on completed exploration activities reported in the announcement released 19 May 2025 ('Hot Chili Announces Latest Drill Results for La Verde, Doubling Porphyry Discovery Footprint').

The conceptual open pit shells were generated using copper (Cu) prices of US$3.50/lb Cu and US$6.00/lb Cu on a series of nested Cu grade shells. Other input parameters informing the conceptual open-pit shells (pit slope angles, mining cost, processing cost, etc.) were derived from values reported in the March 2025 Costa Fuego Pre-feasibility Study and are considered appropriate for the style of mineralisation encountered at the La Verde Cu-Au porphyry discovery.

Any potential quantity and grade of the Exploration Target shown is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Further exploration activities are detailed in this announcement and include (but may not necessarily be limited to) a program of diamond drillholes aiming to extend the mineralised footprint at La Verde. Drilling commenced on 22 September 2025, with the length of the program dependent on a number of considerations including (but not limited to) the results of the exploration activities and regulatory applications and approvals.

PFS Technical Report

For readers to fully understand the information in this report, they should read the PFS Technical Report available on SEDAR+ (www.sedarplus.ca) and at www.hotchili.net.au in its entirety titled "Costa Fuego Project, Chile, Preliminary Feasibility Study NI 43-101 Technical Report" dated 9 May 2025 with an effective date of 27 March 2025, including all qualifications, assumptions, limitations and exclusions. The PFS Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The technical information in this report is subject to the assumptions and qualifications to be contained in the PFS Technical Report. The PFS Technical Report replaces and supersedes the technical report titled "Costa Fuego Copper Project – NI 43-101 Technical Report Mineral Resource Estimate Update" dated 8 April 2024, with an effective date of 26 February 2024 (the "2024 PEA").

Qualified Persons – NI 43-101

The PFS was compiled by Wood Australia Pty Ltd with contributions from a team of independent "Qualified Persons" within the meaning of NI 43 -101. The scientific and technical information contained in this report pertaining to Costa Fuego has been reviewed and verified by the following independent qualified persons within the meaning of NI 43-101:

Ms Elizabeth Haren (FAUSIMM (CP) & MAIG) of Haren Consulting – Mineral Resource Estimate Mr Dean David (FAUSIMM (CP)) of Wood Pty Ltd – Metallurgy Mr Piers Wendlandt (PE) of Wood Pty Ltd – Market Studies and Contracts, Economic Analysis Mr David Cuello (MAUSIMM) of GMT Servicios de Ingeniería – Geotechnical Mr Jeffrey Stevens (Pr. Eng, MSAIMM) of Wood Pty Ltd – Infrastructure and Capital Cost Mr Luis Bernal (Comisión Minera (PC) Registered Member) of Process Mineral Consulting – Leaching Mr Anton von Wielligh (FAUSIMM) of ABGM Consulting Pty Ltd – Mine Planning and Scheduling Mr Edmundo LaPorte (PE, PEng, CPEng, SME Registered Member) of High River Services - Environmental

The above independent Qualified Persons have verified the information disclosed herein, including the sampling, preparation, security, and analytical procedures underlying such information.

Competent Persons – JORC

The information in this report that relates to Mineral Resources, Exploration Results, and Ore Reserves for the Costa Fuego Project is based on information compiled by:

Ms Elizabeth Haren (FAUSIMM (CP) & MAIG) who is a full-time employee of Haren Consulting – Mineral Resource Estimate Mr Dean David (FAUSIMM (CP)) who is a full-time employee of Wood Pty Ltd – Metallurgy Mr Piers Wendlandt (PE) who is a full-time employee of Wood Pty Ltd – Market Studies and Contracts, Economic Analysis Mr David Cuello (MAUSIMM) who is a full-time employee of GMT Servicios de Ingeniería – Geotechnical Mr Jeffrey Stevens (Pr. Eng, MSAIMM) who is a full-time employee of Wood Pty Ltd – Infrastructure and Capital Cost Mr Luis Bernal (Comisión Minera (PC) Registered Member) who is a full-time employee of Process Mineral Consulting – Leaching Mr Anton von Wielligh (FAUSIMM) who is a full-time employee of ABGM Consulting Pty Ltd – Mine Planning and Scheduling Mr Edmundo LaPorte (PE, PEng, CPEng, SME Registered Member) who is a full-time employee of High River Services – Environmental Mr Christian Easterday (MAIG), who is the Managing Director and is a full-time employee of Hot Chili Limited – Exploration Results

Ms Haren, Mr David, Mr Wendlandt, Mr Cuello, Mr Stevens, Mr Bernal, Mr LaPorte, Mr Easterday, and Mr von Wielligh each have sufficient experience, which is relevant to the style of mineralisation and types of deposits under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the JORC Code and as Qualified Persons under NI43-101.

Disclaimer

This report has been prepared by management of Hot Chili Limited ("Hot Chili" or the "Company") and does not represent