Sunday, October 18, 2026
MiningNewsTerminal
Sunday, October 18, 2026 Admin

GAU.TO ·

Galiano Gold Reports Q3 2023 Operating and Financial Results

Financials

Vancouver, British Columbia, November 14, 2023 – Galiano Gold Inc. (“Galiano” or the “Company”)  (TSX, NYSE American: GAU) is pleased to report its third quarter (“Q3”) operating and financial results for the Company and the Asanko Gold Mine (“AGM”), located in Ghana, West Africa. The AGM is a 50:50 joint venture (“JV”) with Gold Fields Limited (“Gold Fields”) which is managed and operated by Galiano. All financial information contained in this news release is unaudited and reported in United States dollars.

Asanko Gold Mine JV Key Metrics (100% basis): 

  • Safety: One lost‐time injury (“LTI”) and three total recordable injuries (“TRI”) recorded during the quarter,  resulting  in  12‐month  rolling  LTI  and  TRI  frequency  rates  of  0.54  and  1.61  per  million employee hours worked, respectively.
  • Production performance: Gold production of 35,779 ounces during the third quarter. Year‐to‐date gold production of 102,130 ounces. Full year gold production is expected to come in at the top end of guidance of between 120,000 to 130,000 ounces.
  • Milling performance: Achieved milling throughput of 1.6 million tonnes (“Mt”) of ore at a grade of 0.8 grams per tonne (“g/t”) during the quarter. Metallurgical recovery in Q3 2023 was 87%.
  • Cost  performance  and  cash  flow:  Total  cash  costs1  of  $1,056  per  gold  ounce  (“/oz”)  and  all‐in sustaining costs1 (“AISC”) of $1,445/oz for the three months ended September 30, 2023. Full year AISC1 guidance has been revised from between $1,650/oz to $1,750/oz to $1,500/oz to $1,600/oz due to higher gold sales and  timing of sustaining  capital expenditures. Additionally, the  JV  generated positive cash flow from operations of $39.7 million and Free Cash Flow1 of $24.0 million during the quarter.
  • Financial performance: Gold revenue of $67.6 million generated from 35,522 gold ounces sold at an average realized price of $1,902/oz for the quarter. Net income of $21.3 million and Adjusted EBITDA¹ of $25.5 million during the quarter.
  • Restart of mining: Mining operations at the AGM restarted on October 1, 2023. The AGM’s mining contractor has mobilized a fleet of mining equipment and pre‐stripping activities are ongoing. The Abore pit remains on track to deliver higher  grade ore to the  processing plant, than  the current stockpile processing, in Q2 2024.
  • Exploration focus: Initiated drilling programs at Abore to convert inferred mineral resources to the indicated  mineral  resource  category,  at  Midras  South  to  advance  the  deposit  towards  a  maiden mineral reserve estimate, and at Nkran completed a phase 1 mineral resource upgrade and mineral reserve conversion drilling.
  • Robust liquidity: $136.9 million in cash and cash equivalents, $4.4 million in gold sales receivables, $2.0 million in gold on hand and no debt as of September 30, 2023.

1 See “Non‐IFRS Performance Measures”

Galiano Highlights: 

  • Stable balance sheet: Cash and cash equivalents of $56.1 million as at September 30, 2023, while remaining debt‐free.
  • Positive earnings: Net income of $11.4 million or $0.05 per common share during the quarter, which includes the Company’s share of the JV’s net earnings for the quarter.

“The third quarter was another strong financial and operating period for the AGM, which is on track to achieve the upper end of gold production guidance of between 120,000 to 130,000 ounces,” stated Matt Badylak, Galiano’s President and Chief Executive Officer. “The mine continued to generate significant cash flows through stockpile processing, which has further strengthened the AGM’s balance sheet. As planned, mining operations at the AGM have recommenced and Abore is on track to deliver higher grade ore to the processing plant by the second quarter of 2024.

At the corporate level, we closed the quarter with $56 million in cash, no debt, and remain in an enviable position to pursue accretive opportunities for growth. Health and safety continue to remain a top priority throughout the organization as we constantly strive to reinforce our commitment to Zero Harm and implementation of best safety practices at the Asanko Gold Mine.”

Asanko Gold Mine – Summary of quarterly operational and financial highlights (100% basis) 

Asanko Gold Mine (100% basis)Q3 2023Q2 2023Q1 2023Q4 2022Q3 2022
Ore mined (‘000t) Waste mined (‘000t) Total mined (‘000t) Strip ratio (W:O) Average gold grade mined (g/t) Mining cost ($/t mined) Ore transportation from Esaase (‘000 t) Ore transportation cost ($/t trucked) Ore milled (‘000t) Average mill head grade (g/t) Average recovery rate (%) Processing cost ($/t milled) G&A cost ($/t milled) Gold produced (oz)‐‐ ‐ ‐ ‐ ‐ ‐ 729 5.88 1,457 0.8 85 11.01 4.68 33,673‐ ‐ ‐ ‐ ‐ ‐ 1,367 5.51 1,566 0.9 73 9.78 4.09 32,678‐ ‐ ‐ ‐ ‐ ‐ 503 6.19 1,518 0.8 80 10.06 4.20 34,090144 107 251 0.7 1.8 25.27 699 6.55 1,423 1.1 88 10.45 4.89 43,899
‐
‐
‐
‐
‐
695
6.63
1,573
0.8
87
9.69
4.16
35,779
Gold sold (oz) Average realized gold price ($/oz) Total cash costs1 ($/oz) All‐in sustaining costs1 ($/oz) All‐in sustaining margin1 ($/oz) All‐in sustaining margin1 ($m)35,52232,912 1,944 1,127 1,374 570 18.835,174 1,850 1,083 1,268 582 20.534,202 1,686 1,031 1,191 495 16.945,482 1,687 1,001 1,178 509 23.2
1,902
1,056
1,445
457
16.2
Asanko Gold Mine (100% basis)Q3 2023Q2 2023Q1 2023Q4 2022Q3 2022
Revenue ($m) Income from mine operations ($m) Adjusted net income1 ($m)67.864.1 24.4 24.465.2 24.7 20.657.8 19.2 19.676.9 25.7 17.3
23.7
21.3
Cash provided by operating activities ($m)39.718.0 10.118.9 12.011.1 5.526.1 16.3
Free cash flow1 ($m)24.0

Asanko Gold Mine – Financial and operational highlights for the three and nine months ended  September 30, 2023 and 2022 (100% basis) 

(All amounts in 000's of US dollars, unless otherwise stated)Three months ended September 30, Nine months ended September 30, 2023 2022 2023 2022
Asanko Gold Mine (100% basis) Financial results Revenue Income from mine operations Net income Adjusted net income1 Adjusted EBITDA1 Cash and cash equivalents Cash generated from operating activities Free cash flow1 AISC margin1 Key mine performance data Gold produced (ounces) Gold sold (ounces) Average realized gold price ($/oz) Total cash costs ($ per gold ounce sold)1 AISC ($ per gold ounce sold)167,770 23,745 21,284 21,284 25,475 136,860 39,740 24,016 16,234 35,779 35,522 1,902 1,056 1,44576,911 25,690 17,346 17,346 22,269 85,802 26,075 16,277 23,150 43,899 45,482 1,687 1,001 1,178197,029 72,808 66,276 66,276 73,879 136,860 76,662 46,088 55,534 102,130 103,608 1,898 1,088 1,362239,328 52,486 19,511 38,431 56,438 85,802 64,344 38,252 53,726 136,252 133,647 1,787 1,189 1,385
  • The AGM produced 35,779 ounces of gold during Q3 2023, as the processing plant achieved milling throughput of 1.6 Mt of ore at a grade of 0.8 g/t with metallurgical recovery averaging 87%. The composition  of  the  feed  blend  processed  during  Q3  2023  had  a  higher  percentage  of  oxide  ore resulting in the strong recoveries achieved.
  • Sold 35,522 ounces of gold in Q3 2023 at an average realized gold price of $1,902/oz for total revenue of $67.8 million (including $0.2 million of by‐product silver revenue), a decrease of $9.1 million from Q3 2022. The decrease in revenue quarter‐on‐quarter was due to a 22% reduction in sales volumes relative to Q3 2022, partly offset by a 13% increase in realized gold prices.
  • Income from mine operations for Q3 2023 totaled $23.7 million compared to income from mine operations of $25.7 million in Q3 2022. The decrease in income from mine operations was due to a $9.1 million reduction in revenue described above, partly offset by $6.2 million decrease in cost of

sales that resulted from fewer ounces sold as well as processing ore that had no carrying value for accounting purposes.

  • Reported Adjusted EBITDA1 of $25.5 million in Q3 2023 compared to $22.3 million in Q3 2022.  The increase in Adjusted EBITDA1 was largely driven by Q3 2022 including $4.3 million of mining contractor costs.
  • Total cash costs1 in Q3 2023 amounted to $1,056/oz compared to $1,001/oz in Q3 2022. Although gold sales volumes decreased by 22% in Q3 2023, total cash costs per ounce1 in Q3 2023 were only 5%  higher  than  Q3  2022  as  a  result  of  processing  ore  that  had  no  carrying  value  for  accounting purposes.
  • AISC1 for Q3 2023 was $1,445/oz compared to $1,178/oz in the comparative period.  AISC1 was higher in the current quarter predominately due to the increase in total cash costs per ounce1 mentioned above and higher sustaining capital expenditures ($276/oz increase) to support the restart of mining in Q4 2023, construction of water treatment facilities and raising the height of the tailings storage facility.
  • The AGM generated $39.7 million of cash flow from operating activities and free cash flow1 of $24.0 million during Q3 2023. This compares to $26.1 million of cash flow from operating activities and free cash flow1 of $16.3 million during Q3 2022.  The increase in free cash flow1 was primarily due to lower working capital tie‐up, partly offset by higher capital spend to support a restart of mining operations.

Galiano Gold Inc. – Financial highlights for the three and nine months ended September 30, 2023 and  2022 

(All amounts in 000's of US dollars, unless otherwise stated)Three months ended September 30, Nine months ended September 30, 2023 2022 2023 2022
Galiano Gold Inc. Net income Net income per share ‐ basic Adjusted EBITDA1 Cash and cash equivalents11,389 0.05 10,282 56,0791,280 0.01 (2,136) 54,71631,843 0.14 26,656 56,07912,309 0.05 (4,739) 54,716
  • The Company reported net income of $11.4 million in Q3 2023, compared to net income of $1.3 million in Q3 2022. Net income was higher in Q3 2023 due to the Company recording its share of the JV’s net earnings which amounted to $9.6 million.  During Q3 2022, the Company did not recognize its share of the JV’s net earnings as the estimated recoverable amount of the Company’s investment in the JV was nil as at September 30, 2022.
  • Adjusted EBITDA1 for Q3 2023 amounted to $10.3 million, compared to a loss of $2.1 million in Q3 2022. The increase in Adjusted EBITDA1 was due to the increase in net income during Q3 2023 as described above.
  • Cash used in operating activities in Q3 2023 was $0.1 million, compared to cash provided by operating activities of $1.5 million in Q3 2022. The increase in cash used in operating activities from Q3 2022 to Q3 2023 was driven by working capital movements, specifically related to the Company’s service fee receivable from the JV.
  • As  of  September  30,  2023,  the  Company  had  cash  and  cash  equivalents  of  $56.1  million,  while remaining debt‐free.

This news release should be read in conjunction with Galiano’s Management’s Discussion and Analysis  and the Unaudited Condensed Consolidated Interim Financial Statements for the three and nine  months ended September 30, 2023 and 2022, which are available at www.galianogold.com and filed  on SEDAR+.

1 Non‐IFRS Performance Measures

The  Company  has  included  certain  non‐IFRS  performance  measures  in  this  news  release.  These  non‐IFRS performance measures do not have any standardized meaning and therefore may not be comparable to similar measures presented by other issuers. Accordingly, these performance measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Refer to the Non‐IFRS Measures section of Galiano’s Management’s Discussion and Analysis for an explanation of these measures and reconciliations to the Company’s and the JV’s reported financial results in accordance with IFRS.

  • Total Cash Costs per Gold Ounce  Management of the Company uses total cash costs per gold ounce sold to monitor the operating performance of the JV.  Total cash costs include the cost of production, adjusted for share‐based compensation expense, by‐ product revenue and production royalties per ounce of gold sold.
  • All‐in Sustaining Costs per Gold Ounce and All‐in Sustaining Margin  The Company has adopted the reporting of “all‐in sustaining costs per gold ounce” (“AISC”) as per the World Gold Council’s guidance. AISC include total cash costs, corporate overhead expenses, sustaining capital expenditure, sustaining  capitalized  stripping  costs,  reclamation  cost  accretion  and  lease  payments  made  to  and  interest expense on the AGM’s mining and service lease agreements per ounce of gold sold. Excluded from AISC are one‐ time severance charges in line with World Gold Council guidance.  All‐in sustaining margin is calculated by taking the average realized gold price for a period less that period’s AISC.
  • EBITDA and Adjusted EBITDA  EBITDA provides an indication of the Company’s continuing capacity to generate income from operations before taking into account the Company’s financing decisions and costs of amortizing capital assets. Accordingly, EBITDA comprises net income (loss) excluding interest expense, interest income, amortization and depletion, and income taxes. Adjusted EBITDA adjusts EBITDA to exclude non‐recurring items and to include the Company’s interest in the Adjusted EBITDA of the JV. Other companies and JV partners may calculate EBITDA and Adjusted EBITDA differently.
  • Free cash flow  The Company believes that in addition to conventional measures prepared in accordance with IFRS, the Company and  certain  investors  and  analysts  use  free  cash  flow  to  evaluate  the  JV’s  performance  with  respect  to  its operating cash flow capacity to meet non‐discretionary outflows of cash. The presentation of free cash flow is not meant to be a substitute for the cash flow information presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. Free cash flow is calculated as cash flows from operating activities of the JV adjusted for cash flows associated with sustaining and non‐sustaining capital expenditures and payments made to mining and service contractors for leases capitalized under IFRS 16.
  • Adjusted net income and adjusted net income per common share  The Company has included the non‐IFRS performance measures of adjusted net income and adjusted net income per common share. Neither adjusted net income nor adjusted net income per share have any standardized meaning and are therefore unlikely to be comparable to other measures presented by other issuers. Adjusted

net income excludes certain non‐cash items or non‐recurring items from net income or net loss to provide a measure which helps the Company and investors to evaluate the results of the underlying core operations of the Company or the JV and its ability to generate cash flows and is an important indicator of the strength of the Company’s or the JV’s operations and performance of its core business.

Qualified Person 

Richard Miller, P.Eng., Vice President Technical Services with Galiano Gold Inc., is a Qualified Person as defined by Canadian National Instrument 43‐101, Standards of Disclosure for Mineral Projects, and has approved the scientific and technical information contained in this news release.

About Galiano Gold Inc. 

Galiano is focused on creating a sustainable business capable of value creation for all stakeholders through production, exploration and disciplined deployment of its financial resources. The Company operates and manages the Asanko Gold Mine, which is located in Ghana, West Africa, and jointly owned with Gold Fields.  Galiano  is  committed  to  the  highest  standards  for  environmental  management,  social responsibility,  and  the  health  and  safety  of  its  employees  and  neighbouring  communities.  For  more information, please visit www.galianogold.com.

Conference Call Details: 

Date: November 15, 2023  Replay (available until November 21, 2023)

Time: 10:00 AM ET (7:00 AM PT)  Local: 416‐764‐8677 Dial In: 416‐764‐8688  Toll Free: 1‐888‐390‐0541 Toll Free: 1‐888‐390‐0546  Access Code: 348996#

Enquiries: 

Krista Muhr Toll‐Free (N. America): 1‐855‐246‐7341 Telephone: 1‐778‐239‐0446 Email: [email protected]

Cautionary Note Regarding Forward‐Looking Statements 

Certain statements and information contained in this news release constitute “forward‐looking statements” within  the meaning of applicable U.S. securities laws and “forward‐looking information” within the meaning of applicable  Canadian  securities  laws,  which  we  refer  to  collectively  as  “forward‐looking  statements”.  Forward‐looking  statements are statements and information regarding possible events, conditions or results of operations that are  based upon assumptions about future conditions and courses of action. All statements and information other than  statements of historical fact may be forward looking statements. In some cases, forward‐looking statements can be  identified  by  the  use  of  words  such  as  “seek”,  “expect”,  “anticipate”,  “budget”,  “plan”,  “estimate”,  “continue”,  “forecast”, “intend”, “believe”, “predict”, “potential”, “target”, “may”, “could”, “would”, “might”, “will” and similar  words or phrases (including negative variations) suggesting future outcomes or statements regarding an outlook. 

Forward‐looking statements in this news release include, but are not limited to: the operating plans for the AGM  under the JV between the Company and Gold Fields; opportunities for growth at the corporate level; commitment to  health and safety; planned and future drilling programs; anticipated production and cost guidance; mine restart plans  and timing thereof; timing of delivery of higher grade ore from the Abore pit; and statements regarding the usefulness  and comparability of certain non‐IFRS measures. Such forward‐looking statements are based on a number of material  factors and assumptions, including, but not limited to: the Company and Gold Fields will agree on the manner in  which the JV will operate the AGM, including agreement on the new life of mine (“LOM”) plan, development plans  and capital expenditures; the price of gold will not decline significantly or for a protracted period of time; the accuracy  of the estimates and assumptions underlying mineral reserve and mineral resource estimates; the Company’s ability  to raise sufficient funds from future equity financings to support its operations, and general business and economic  conditions; the global financial markets and general economic conditions will be stable and prosperous in the future;  the ability of the JV and the Company to comply with applicable governmental regulations and standards; the mining  laws, tax laws and other laws in Ghana applicable to the AGM and the JV will not change, and there will be no  imposition of additional exchange controls in Ghana; the success of the JV and the Company in implementing its  development strategies and achieving its business objectives; the JV will have sufficient working capital necessary to  sustain its operations on an ongoing basis and the Company will continue to have sufficient working capital to fund  its operations and contributions to the JV; and the key personnel of the Company and the JV will continue their  employment. 

The foregoing list of assumptions cannot be considered exhaustive. 

Forward‐looking statements involve known and unknown risks, uncertainties and other factors which may cause  actual results, performance or achievements to differ materially from those anticipated in such forward‐looking  statements. The Company believes the expectations reflected in such forward‐looking statements are reasonable,  but no assurance can be given that these expectations will prove to be correct and you are cautioned not to place  undue reliance on forward‐looking statements contained herein. Some of the risks and other factors which could  cause actual results to differ materially from those expressed in the forward‐looking statements contained in this  news release, include, but are not limited to: the mineral reserve and mineral resource estimates may change and  may prove  to be  inaccurate;  metallurgical recoveries  may  not be economically  viable;  risks  associated  with  the  Company  ceasing  its  mining  operations  during  2023;  LOM  estimates  are  based  on  a  number  of  factors  and  assumptions and may prove to be incorrect; the risk that the Company and Gold Fields will not agree on the manner  in which the JV will operate the AGM; actual production, costs, returns and other economic and financial performance  may  vary  from  the  Company's  estimates  in  response  to  a  variety  of  factors,  many  of  which  are  not  within  the  Company's control; inflationary pressures and the effects thereof; the AGM has a limited operating history and is  subject to risks associated with establishing new mining operations; sustained increases in costs, or decreases in the  availability, of commodities consumed or otherwise used by the Company may adversely affect the Company; adverse  geotechnical and geological conditions (including geotechnical failures) may result in operating delays and lower  throughput or recovery, closures or damage to mine infrastructure; the ability of the Company to treat the number  of  tonnes  planned,  recover  valuable  materials,  remove  deleterious  materials  and  process  ore,  concentrate  and  tailings as planned is dependent on a number of factors and assumptions which may not be present or occur as  expected; the JV’s mineral properties may experience a loss of ore due to illegal mining activities; the Company's  operations may encounter delays in or losses of production due to equipment delays or the availability of equipment;  outbreaks of COVID‐19 and other infectious diseases may have a negative impact on global financial conditions,  demand for commodities and supply chains and could adversely affect the Company’s business, financial condition  and results of operations and the market price of the common shares of the Company; the Company's operations are  subject to continuously evolving legislation, compliance with which may be difficult, uneconomic or require significant  expenditures; the Company may be unsuccessful in attracting and retaining key personnel; labour disruptions could  adversely affect the Company's operations; recoveries may be lower in the future and have a negative impact on the  Company’s financial results; the lower recoveries may persist and be detrimental to the AGM and the Company; the  Company's business is subject to risks associated with operating in a foreign country; risks related to the Company's  use of contractors; the hazards and risks normally encountered in the exploration, development and production of  gold; the Company's operations are subject to environmental hazards and compliance with applicable environmental  laws and regulations; the effects of climate change or extreme weather events may cause prolonged disruption to  the delivery of essential commodities which could negatively affect production efficiency; the Company's operations  and workforce are exposed to health and safety risks; unexpected costs and delays related to, or the failure of the  Company to obtain, necessary permits could impede the Company's operations; the Company's title to exploration,  development and mining interests can be uncertain and may be contested; geotechnical risks associated with the  design and operation of a mine and related civil structures; the Company's properties may be subject to claims by  various community stakeholders; risks related to limited access to infrastructure and water; risks associated with  establishing new mining operations; the Company's revenues are dependent on the market prices for gold, which  have experienced significant recent fluctuations; the Company may not be able to secure additional financing when  needed or on acceptable terms; the Company’s shareholders may be subject to future dilution; risks related to the  control of AGM cashflows and operation through a joint venture; risks related to changes in interest rates and foreign  currency exchange rates; risks relating to credit rating downgrades; changes to taxation laws applicable to the  Company  may  affect  the  Company's  profitability  and  ability  to  repatriate  funds;  risks  related  to  the  Company's  internal controls over financial reporting and compliance with applicable accounting regulations and securities laws;  risks related to information systems security threats; non‐compliance with public disclosure obligations could have  an adverse effect on the Company’s stock price; the carrying value of the Company's assets may change and these  assets may be subject to impairment charges; risks associated with changes in reporting standards; the Company's  primary asset is held through a joint venture, which exposes the Company to risks inherent to joint ventures, including  disagreements with joint venture partners and similar risks; the Company may be liable for uninsured or partially  insured  losses;  the  Company  may  be  subject  to  litigation;  damage  to  the  Company’s  reputation  could  result  in  decreased investor confidence and increased challenges in developing and maintaining community relations which  may have adverse effects on the business, results of operations and financial conditions of the joint venture and the  Company and the Company’s share price; the Company may be unsuccessful in identifying targets for acquisition or  completing suitable corporate transactions, and any such transactions may not be beneficial to the Company or its  shareholders; the Company must compete with other mining companies and individuals for mining interests; the  Company’s growth, future profitability and ability to obtain financing may be impacted by global financial conditions;  the Company’s common shares may experience price and trading volume volatility; the Company has never paid  dividends and does not expect to do so in the foreseeable future; the Company’s shareholders may be unable to sell  significant  quantities  of  the  Company’s  common  shares  into  the  public  trading  markets  without  a  significant  reduction in the price of its common shares, or at all; and the risk factors described under the heading “Risk Factors”  in the Company’s Annual Information Form. 

Although the Company has attempted to identify important factors that could cause actual results or events to differ  materially from those described in the forward‐looking statements, you are cautioned that this list is not exhaustive  and there may be other factors that the Company has not identified. Furthermore, the Company undertakes no  obligation to update or revise any forward‐looking statements included in, or incorporated by reference in, this news  release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required  by applicable law. 

Neither  the  Toronto  Stock  Exchange  nor  the  Investment  Industry  Regulatory  Organization  of  Canada  accepts  responsibility for the adequacy or accuracy of this news release. 

Source: Galiano Gold Inc.