Americas Gold and Silver Reports Q1‐2024 Results

Production Results Financials

TORONTO, ONTARIO – May 15, 2024 – Americas Gold and Silver Corpora�on (TSX: USA) (NYSE American: USAS)  (“Americas”  or  the  “Company”),  a  growing  North  American  precious  metals  producer,  reports consolidated financial and opera�onal results for the quarter ended March 31, 2024.

This earnings release should be read in conjunc�on with the Company’s Management’s Discussion and  Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have  been posted on the Americas Gold and Silver Corpora�on SEDAR+ profile at www.sedarplus.ca, and on its  EDGAR profile at www.sec.gov, and which are also available on the Company’s website at www.americas‐ gold.com.  All figures are in U.S. dollars unless otherwise noted.  

Highlights 

  • Revenue decreased to $19.5 million for Q1‐2024 or 12% compared to $22.1 million for Q1‐2023, resulting  from  lower  realized  zinc  price  at  the  Cosalá  Operations  and  lower  silver  and  lead production from the Galena Complex, offset by higher silver production from the Cosalá Operations.
  • A net loss of $16.2 million for Q1‐2024, or an attributable loss of $0.07 per share representing an increase in net loss of $5.7 million compared to Q1‐2023, primarily due to lower net revenue, higher cost of sales, and higher loss on non‐cash derivatives related to the convertible debenture, offset in part by lower interest and financing expense.
  • As previously reported, Q1‐2024 attributable silver production was 0.48 million ounces compared with approximately 0.50 million ounces in Q1‐2023.  The Company also produced approximately 8.0 million attributable pounds of zinc and 4.0 million attributable pounds of lead during Q1‐2024.
  • Produc�on  from  the  Cosalá  Opera�ons  was  strong  as  the  opera�on  benefi�ed  from  above budgeted silver grades and recoveries.  The Galena Complex produc�on was slightly below budget as focus during the quarter was re‐allocated to lateral development to access the new mining areas in the Upper Country Lead Zone veins between 2400 and 2800 levels.  This silver‐lead area commenced ore produc�on subsequent to quarter end and will provide 4,000‐5,000 tons per month of base load silver‐lead produc�on for the next several years.
  • Consolidated a�ributable cash costs of $20.53/oz silver produced[1] and all‐in sustaining costs of $29.20/oz silver produced[1] during the quarter.
  • The Company expects to close on a financing with a metal trader for the an�cipated ini�al capital requirements of the 100%‐owned EC120 Project at the Cosalá Opera�ons in Q2‐2024 with the goal of producing higher‐grade silver‐copper concentrates in early 2025.  The 2019 Preliminary Feasibility Study for the EC120 Project forecasted average annual metal produc�on of 2.5 million ounces of silver and 4.5 million pounds of copper with a total of over 12 million ounces of silver and 23.0 million pounds of copper over a mine life of approximately 5 years.

“I am op�mis�c about the remainder of the year despite an expected, but lower produc�on quarter. Increasing silver and base metals prices coupled with expected higher silver produc�on from the Galena Complex should greatly improve opera�ng results over the next three quarters,” stated Americas President and CEO Darren Blasu�.  “Ore produc�on from the newly developed 2400 Level at the Galena Complex has commenced, providing a larger monthly base load of silver‐lead produc�on.  In addi�on, development on the 3700  Level  at  the  Galena Complex  has begun into a  high‐grade silver‐copper area with  ini�al produc�on expected at the start of Q3‐2024.”

Cosalá Opera�ons 

The Cosalá Opera�ons produced approximately 295,000 ounces of silver, 2.8 million pounds of lead and 8.0 million pounds of zinc in Q1‐2024, compared with approximately 265,000 ounces of silver, 2.7 million pounds of lead and 7.2 million pounds of zinc in Q1‐2023.  Silver and zinc produc�on increased by over 10% year‐over‐year while lead produc�on was essen�ally unchanged.

With the current higher silver and copper price, the Company decided to expedite the development of its 100%‐owned EC120 Project at the Cosalá Opera�ons.  Ini�al access to the Zone 120 deposit occurred in Q3‐2023 from the San Rafael Upper Zone development.  In addi�on, the Company con�nues mining and processing silver‐zinc ore from the San Rafael Main and Upper Zones and is expec�ng to benefit from the increase in zinc prices experienced to date in the second quarter.

The Company expects to close in Q2‐2023 on a financing with an interna�onal metal trader to provide financing for the an�cipated ini�al capital requirements at the EC120 Project.  The Company expects to complete  the  required  development  and  prepara�ons  to  begin  producing  higher‐grade  silver‐copper concentrates from the Project at the beginning of 2025.  The 2019 Preliminary Feasibility Study for the EC120 Project forecasted average annual metal produc�on of 2.5 million ounces of silver and 4.5 million pounds of copper with a total of over 12 million ounces of silver and 23.0 million pounds of copper over the five years of the project.

Cash costs per silver ounce increased in the quarter to $16.35 per ounce from $4.61 per ounce in Q1‐2023 due to higher cost of sales, lower realized Q1‐2024 zinc prices and the devalua�on of the USD rela�ve to the Mexican peso.

Galena Complex 

A�ributable produc�on from the 60% owned Galena Complex was approximately 187,000 ounces of silver and 1.1 million pounds of lead in Q1‐2024, compared to approximately 235,000 ounces of silver and 2.8 million pounds of lead in Q1‐2023.  During the quarter, the Company focused on horizontal development work in the Upper Country Lead Zone between the 2400 and 2800 Levels to access addi�onal working areas.    The  development  work  reduced  silver  and  lead  produc�on  in  the  quarter  but  is  expected  to posi�vely impact overall produc�on for the remainder of the year and going forward.  The mining crews have been relocated to accelerate development into a high‐grade silver copper stope accessed off of the 3700 level which will add high‐grade silver‐copper produc�on commencing in Q3‐2024.

Cash costs increased to $27.14 per silver ounce in Q1‐2024 from $18.59 per silver ounce in Q1‐2023 mainly due to lower silver and lead produc�on during the quarter.  Cash costs and all‐in sustaining costs per silver ounce at the Galena Complex are an�cipated to decrease with the projected increase in produc�on and the comple�on of the Galena Hoist project as the benefits of economies of scale on the exis�ng cost base are realized.

About Americas Gold and Silver Corpora�on 

Americas Gold and Silver Corpora�on is a high‐growth precious metals mining company with mul�ple assets in North America.  The Company owns and operates the Cosalá Opera�ons in Sinaloa, Mexico, manages the 60%‐owned Galena Complex in Idaho, USA, and is re‐evalua�ng the Relief Canyon mine in Nevada, USA.    The Company also owns the San Felipe development project in Sonora, Mexico.  For further informa�on, please see SEDAR+ or www.americas‐gold.com.

For more informa�on: 

Stefan Axell  Darren Blasu� VP, Corporate Development & Communica�ons    President and CEO Americas Gold and Silver Corpora�on  Americas Gold and Silver Corpora�on 416‐874‐1708    416‐848‐9503

Technical Informa�on and Qualified Persons 

The scien�fic and technical informa�on rela�ng to the Company’s material mining proper�es contained herein has been reviewed and approved by Chris McCann, P.Eng., Vice President, Technical Services of the Company.  The Company’s current Annual Informa�on Form and the NI 43‐101 Technical Reports for its mineral proper�es, all of which are available on SEDAR+ at www.sedarplus.ca, and EDGAR at www.sec.gov, contain  further  details  regarding  mineral  reserve  and  mineral  resource  es�mates,  classifica�on  and repor�ng parameters, key assump�ons and associated risks for each of the Company’s material mineral proper�es, including a breakdown by category.

All mining terms used herein have the meanings set forth in Na�onal Instrument 43‐101 – Standards of Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securi�es regulatory authori�es. These standards differ from the requirements of the SEC that are applicable to domes�c United States repor�ng companies.  Any mineral reserves and mineral resources reported by the Company in accordance with NI 43‐101 may not qualify as such under SEC standards. Accordingly, informa�on contained in this news release may not be comparable to similar informa�on made public by companies subject to the SEC’s repor�ng and disclosure requirements.

Cau�onary Statement on Forward‐Looking Informa�on: 

This news release contains “forward‐looking informa�on” within the meaning of applicable securi�es laws. Forward‐looking informa�on includes, but is not limited to, Americas’ expecta�ons, inten�ons, plans, assump�ons and beliefs with respect to, among other things, es�mated and targeted produc�on rates and results for gold, silver and other metals, the expected prices of gold, silver and other metals, as well as the related  costs,  expenses  and  capital  expenditures;  produc�on  from  the  Galena  Complex  and  Cosalá Opera�ons,  including  the  expected  number  of  producing  stopes  and  produc�on  levels;  the  expected �ming and comple�on of required development  and the expected opera�onal and produc�on results therefrom, including the an�cipated improvements to produc�on rates and cash costs per silver ounce and all‐in sustaining costs per silver ounce ; and statements rela�ng to Americas’ EC120 Project, including expected  approvals,  prepayment  financing  availability,  execu�on  and  �ming  and  capital  expenditures required to develop such project and reach produc�on thereat, and expecta�ons regarding its ability to rely in exis�ng infrastructure, facili�es, and equipment.  Guidance and outlook references contained in this press release were prepared based on current mine plan assump�ons with respect to produc�on, development, costs and capital expenditures, the metal price assump�ons disclosed herein, and assumes no further adverse impacts to the Cosalá Opera�ons from blockades or work stoppages, and comple�on of the sha� repair and sha� rehab work at the Galena Complex on its expected schedule and budget, the realiza�on of the an�cipated benefits therefrom, and is subject to the risks and uncertain�es outlined below.  The ability to maintain cash flow posi�ve produc�on at the Cosalá Opera�ons, which includes the EC120 Project, through mee�ng produc�on targets and at the Galena Complex through implemen�ng the Galena Recapitaliza�on Plan, including the comple�on of the Galena sha� repair and sha� rehab work on its expected schedule and budget, allowing the Company to generate sufficient opera�ng cash flows while facing market fluctua�ons in commodity prices and infla�onary pressures, are significant judgments in the consolidated financial statements with respect to the Company’s liquidity. Should the Company experience nega�ve opera�ng cash flows in future periods, the Company may need to raise addi�onal funds through the issuance of equity or debt securi�es.  O�en, but not always, forward‐looking informa�on can be iden�fied  by  forward‐looking  words  such  as  “an�cipate”,  “believe”,  “expect”,  “goal”,  “plan”,  “intend”, “poten�al’, “es�mate”, “may”, “assume” and “will” or similar words sugges�ng future outcomes, or other expecta�ons, beliefs, plans, objec�ves, assump�ons, inten�ons, or statements about future events or performance.  Forward‐looking informa�on is based on the opinions and es�mates of Americas as of the date such informa�on is provided and is subject to known and unknown risks, uncertain�es, and other factors that may cause the actual results, level of ac�vity, performance, or achievements of Americas to be materially different from those expressed or implied by such forward‐looking informa�on.  With respect to the business of Americas, these risks and uncertain�es include risks rela�ng to widespread epidemics or pandemic outbreak, ac�ons that have been and may be taken by governmental authori�es to contain such  epidemic  or  pandemic  or  to  treat  its  impact  and/or  the  availability,  effec�veness  and  use  of treatments and vaccines (including the effec�veness of boosters); interpreta�ons or reinterpreta�ons of geologic  informa�on;  unfavorable  explora�on  results;  inability  to  obtain  permits  required  for  future explora�on,  development  or  produc�on;  general  economic  condi�ons  and  condi�ons  affec�ng  the industries in which the Company operates; the uncertainty of regulatory requirements and approvals; poten�al  li�ga�on;  fluctua�ng  mineral  and  commodity  prices;  the  ability  to  obtain  necessary  future financing on acceptable terms or at all; the ability to operate the Company’s projects; and risks associated with  the  mining  industry  such  as  economic  factors  (including  future  commodity  prices,  currency fluctua�ons and energy prices), ground condi�ons, illegal blockades and other factors limi�ng mine access or  regular  opera�ons  without  interrup�on,  failure  of  plant,  equipment,  processes  and  transporta�on services to operate as an�cipated, environmental risks, government regula�on, actual results of current explora�on  and  produc�on  ac�vi�es,  possible  varia�ons  in  ore  grade  or  recovery  rates,  permi�ng �melines, capital and construc�on  expenditures,  reclama�on ac�vi�es, labor rela�ons or  disrup�ons, social  and  poli�cal  developments,  risks  associated  with  generally  elevated  infla�on  and  infla�onary pressures, risks related to changing global economic condi�ons, and market vola�lity, risks rela�ng to geopoli�cal instability, poli�cal unrest, war, and other global conflicts may result in adverse effects on macroeconomic  condi�ons  including  vola�lity  in  financial  markets,  adverse  changes  in  trade  policies, infla�on, supply chain disrup�ons and other risks of the mining industry.   Although the Company has a�empted to iden�fy important factors that could cause actual results to differ materially from those contained in forward‐looking informa�on, there may be other factors that cause results not to be as an�cipated,  es�mated,  or  intended.    Readers  are  cau�oned  not  to  place  undue  reliance  on  such informa�on.  Addi�onal informa�on regarding the factors that may cause actual results to differ materially from  this  forward‐looking  informa�on  is  available  in  Americas’  filings  with  the  Canadian  Securi�es Administrators on SEDAR+ and with the SEC.  Americas does not undertake any obliga�on to update publicly or otherwise revise any forward‐looking informa�on whether as a result of new informa�on, future events or other such factors which affect this informa�on, except as required by law.  Americas does not give any assurance (1) that Americas will achieve its expecta�ons, or (2) concerning the result or �ming thereof.  All subsequent wri�en and oral forward‐looking informa�on concerning Americas are expressly qualified in their en�rety by the cau�onary statements above.

1 This metric is a non‐GAAP financial measure or ra�o.  The Company uses the financial measures “Cash Cost”, “Cash Cost/Ag Oz Produced”, “All‐In Sustaining Cost”, and “All‐In Sustaining Cost/Ag Oz Produced” in  accordance  with  measures  widely  reported  in  the  silver  mining  industry  as  a  benchmark  for performance  measurement  and  because  it  understands  that,  in  addi�on  to  conven�onal  measures prepared in accordance with IFRS, certain investors and analysts use this informa�on to evaluate the Company’s underlying cash costs and total costs of opera�ons. Cash costs are determined on a mine‐by‐ mine basis and include mine site opera�ng costs such as mining, processing, administra�on, produc�on taxes and royal�es which are not based on sales or taxable income calcula�ons, while all‐in sustaining costs is the cash costs plus all development, capital expenditures, and explora�on spending.

Reconciliation of Consolidated Cash Costs/Ag Oz Produced(a)

 Q1‐2024   Q1‐2023 

Cost of sales ('000)$19,675$17,479
Less non‐controlling interests portion ('000)(3,426)(3,959)
Attributable cost of sales ('000)16,24913,520
Non‐cash costs ('000)82279
Direct mining costs ('000)$16,331$13,799
Smelting, refining and royalty expenses ('000)4,3435,242
Less by‐product credits ('000)(10,779)(13,457)
Cash costs ('000)$9,895$5,584
Divided by silver produced (oz)481,936499,677
Cash costs/Ag oz produced ($/oz)$20.53$11.18

Reconciliation of Cosalá Operations Cash Costs/Ag Oz Produced  Q1‐2024    Q1‐2023  

Cost of sales ('000)$11,109$7,582
Non‐cash costs ('000)(348)292
Direct mining costs ('000)$10,761$7,874
Smelting, refining and royalty expenses ('000)3,8494,188
Less by‐product credits ('000)(9,782)(10,839)
Cash costs ('000)$4,828$1,223
Divided by silver produced (oz)295,278265,121
Cash costs/Ag oz produced ($/oz)$16.35$4.61

Reconciliation of Galena Complex Cash Costs/Ag Oz Produced   Q1‐2024    Q1‐2023  

Cost of sales ('000)$8,566$9,897
Non‐cash costs ('000)716(21)
Direct mining costs ('000)$9,282$9,876
Smelting, refining and royalty expenses ('000)8231,757
Less by‐product credits ('000)(1,661)(4,364)
Cash costs ('000)$8,444$7,269
Divided by silver produced (oz)311,096390,927
Cash costs/Ag oz produced ($/oz)$27.14$18.59

Reconciliation of Consolidated All‐In Sustaining Costs/Ag Oz Produced (a)

 Q1‐2024    Q1‐2023  

Cash costs ('000)$9,895$5,584
Capital expenditures ('000)3,5312,419
Exploration costs ('000)646427
All‐in sustaining costs ('000)$14,072$8,430
Divided by silver produced (oz)481,936499,677
All‐in sustaining costs/Ag oz produced ($/oz)$29.20$16.87

Reconciliation of Cosalá Operations All‐In Sustaining Costs/Ag Oz Produced  Q1‐2024    Q1‐2023  

Cash costs ('000)$4,828$1,223
Capital expenditures ('000)1,4741,183
Exploration costs ('000)123119
All‐in sustaining costs ('000)$6,425$2,525
Divided by silver produced (oz)295,278265,121
All‐in sustaining costs/Ag oz produced ($/oz)$21.76$9.52

Reconciliation of Galena Complex All‐In Sustaining Costs/Ag Oz Produced   2023    Q1‐2023  

Cash costs ('000)$8,444$7,269
Capital expenditures ('000)3,4282,060
Exploration costs ('000)871514
All‐in sustaining costs ('000)$12,743$9,843
Galena Complex Recapitalization Plan costs ('000)‐2,565
All‐in sustaining costs with Galena Recapitalization Plan ('000)$12,743$12,408
Divided by silver produced (oz)311,096390,927
All‐in sustaining costs/Ag oz produced ($/oz)$40.96$25.18
All‐in sustaining costs with Galena Recapitalization/Ag oz produced ($/oz)$40.96$31.74

(a)  Throughout this press release, consolidated produc�on results and consolidated opera�ng metrics are based on the a�ributable ownership percentage of each opera�ng segment (100% Cosalá Opera�ons and 60% Galena Complex).