Vizsla Copper Identifies Additional IP Chargeability Anomalies Across the Thira Alteration Corridor, Poplar Project
VIZSLA COPPER IDENTIFIES ADDITIONAL IP
CHARGEABILITY ANOMALIES ACROSS THE
THIRA ALTERATION CORRIDOR, POPLAR
PROJECT
VANCOUVER, BC
,
Nov. 25, 2025
/CNW/ - Vizsla Copper Corp. (TSXV: VCU) (OTCQB: VCUFF)
(
FRANKFURT
: 97E0) ("
Vizsla Copper
" or the "
Company
") is pleased to report results from a
recently completed Direct Current Induced Polarization (DCIP) geophysical survey along trend of its
Thira discovery on the Poplar project (the "
Poplar Project
" or "
Poplar
") in central
British Columbia
(Figure 1).
HIGHLIGHTS
Multiple un-tested DCIP chargeability anomalies are present.
Anomalies are similar in scale to the DCIP chargeability anomaly associated with the
Thira discovery (Figure 2).
Phase 2 winter drill program planned for Q1 of 2026 at Thira.
"I am encouraged by the number of top-quality drill targets present within the Thira alteration
footprint," commented
Steve Blower
, VP, Exploration. "We have always thought that the 8 x 2
kilometre footprint is large enough to host multiple porphyry centers, and this survey supports that
interpretation. Our team is eagerly awaiting the next phase of drilling in the first quarter of 2026."
The DCIP Survey
The grid-based, DCIP survey across the Thira alteration corridor consisted of 39.8-line kilometers
across 15 northwest-southeast oriented lines spaced 400 meters apart. The survey expanded on the
2024 DCIP survey that only covered the center of the alteration corridor (see
January 15
th
, 2025
News Release). The 2025 survey was designed to characterize and detect subsurface sulfide
mineralization associated with eastern and western extents of the largely till-covered, 8 by 2
kilometer Thira alteration corridor.
Recently completed drilling at the Thira discovery outlined an open-ended, ~800 by 500 meter
footprint of strong porphyry-related mineralization (e.g., 237.3 meters of 0.51% CuEq* (0.36% Cu,
0.02% Mo, 1.19 g/t Ag, and 0.06 g/t Au from 117.7 meters downhole in TH25-145, see
October
20
th
, 2025 News Release). This mineralized zone, consisting of chalcopyrite-molybdenite bearing
stockwork, is spatially coincident with soil geochemical and geophysical (airborne EM and ground
DCIP) anomalies (see
January 15
th
, 2025 and
November 6
th
, 2025 news releases). The DCIP data
highlight a moderate-chargeability response surrounded by a halo of strong-chargeability response
(Figure 2). This chargeability pattern is interpreted to reflect a center of chalcopyrite-molybdenite-
bearing potassic alteration surrounded by a broad zone of highly-chargeable, pyrite-bearing phyllic
alteration (Figure 2).
Modelling and interpretation of the recently acquired DCIP chargeability and resistivity data are
ongoing, however, preliminary data products (e.g., n=1) suggest the presence of two additional
target areas: Copper Pond and Camp Lake (Figure 2). At both targets, a zone of moderate-
chargeability is surrounded by zones of very high-chargeability, similar to the Thira discovery (Figure
2). The center of these anomalies have yet to be systematically drill tested and represent priority
areas for future drill programs.
Next Steps at Thira
Three dimensional inverted models of chargeability and resistivity data from the 2024 and 2025
DCIP surveys are currently being constructed. These models will be integrated with other
geophysical and soil geochemical datasets to generate new drill targets for a planned winter drill
program in Q1 of 2026.
*Copper equivalent calculation (CuEq) uses metal prices of: Cu US$4.00/lb, Mo US$20.00/lb, Au US$2,000/oz and Ag US$22/oz and conceptual recoveries of Cu: 80%, Mo: 80%, Au:
70% and Ag: 65%. Metallurgical test work has not been performed on core from Thira, therefore it is uncertain which metals would report to potential concentrates - recoveries are
conceptual in nature. CuEq is provided for illustrative purpose only to show the combined grades of Cu, Mo, Au and Ag relative to copper price net of conceptual metallurgical
recoveries. CuEq% = Cu% + (Au g/t x (Au recovery / Cu recovery) x [Au price US$/oz ÷ 31] / [Cu price US$/lb x 22.04623]) + (Ag g/t x (Ag recovery / Cu recovery) x [Ag price
US$/oz ÷ 31] / [Cu price US$/lb x 22.04623] + (Mo grade % x (Mo recovery / Cu recovery) x [Mo price US$/lb x 2204.623] / [Cu price US$/lb x 2204.623]). Composite intervals are
calculated using length-weighted averages above the cutoff grades noted above, with up to 10 meters of internal dilution. True thickness of the bulk-tonnage style, stockwork-
hosted mineralization is unknown.
Figure 1. Map of the Poplar Project showing the location of the Thira target area and previously
acquired MobileMT data1. The area circled around the apparent conductivity-high anomaly marks
the footprint of the Thira alteration corridor. (CNW Group/Vizsla Copper Corp.)
Figure 1. Map of the Poplar Project showing the location of the Thira target area and previously
acquired MobileMT data
1
. The area circled around the apparent conductivity-high anomaly marks
the footprint of the Thira alteration corridor.
Figure 2. Map showing chargeability (n=1) results from the compiled 2024 (see January 15th, 2025
News Release) and 2025 DCIP surveys across the Thira alteration corridor. Locations of historic
shallow drill holes are shown. Results from holes TH25-138 and TH25-145 were previously released
(see July 22, 2025 and October 20, 2025 news releases). See references below for sources of
historical data. (CNW Group/Vizsla Copper Corp.)
Figure 2. Map showing chargeability (n=1) results from the compiled 2024 (see
January 15
th
, 2025
News Release) and 2025 DCIP surveys across the Thira alteration corridor. Locations of historic
shallow drill holes are shown. Results from holes TH25-138 and TH25-145 were previously
released (see
July 22, 2025
and
October 20, 2025
news releases). See references below for
sources of historical data.
Poplar Project
The 44,200-hectare Poplar project in central BC covers Mesozoic aged arc-related volcanic,
sedimentary and intrusive rocks considered prospective for porphyry-related copper and gold
mineralization. In addition to the Thira target, the project also hosts the Poplar deposit, a near-
surface porphyry-related copper and gold system. The Thira target is approximately 10 km south of
the Poplar deposit. Vizsla Copper has the option to earn a 100% interest in the property through a
series of expenditure commitments and annual cash payments until 2027.
About Vizsla Copper
Vizsla Copper is a Cu-Au-Mo focused mineral exploration and development company headquartered
in
Vancouver, Canada
. The Company is primarily focused on its Poplar and Woodjam projects, well
situated amongst significant infrastructure in Central and
Southern British Columbia
. The Company's
growth strategy is focused on the exploration and development of its copper properties within its
portfolio in addition to value accretive acquisitions. Vizsla Copper's vision is to be a responsible
copper explorer and developer in the stable mining jurisdiction of
British Columbia, Canada
and it is
committed to socially responsible exploration and development, working safely, ethically and with
integrity.
Vizsla Copper is a spin-out of Vizsla Silver and is backed by Inventa Capital Corp., a premier
investment group founded in 2017 with the goal of discovering and funding opportunities in the
resource sector. Additional information about the Company is available on SEDAR+ (
www.sedarplus.ca
) and the Company's website (
www.vizslacopper.com
).
Qualified Person and National Instrument 43-101 Disclosure
The Company's disclosure of technical or scientific information in this press release has been
reviewed and approved by
Christopher Leslie
, Ph.D., P.Geo., Technical Advisor for Vizsla Copper.
Dr. Leslie is a Qualified Person as defined under the terms of National Instrument 43-101.
Some technical information contained in this release is historical in nature and has been compiled
from public sources believed to be accurate. The technical information has not been verified by
Vizsla Copper and may in some instances be unverifiable.
References
1.
Henneberry, T.R. (2024), Data acquisition and processing report, Helicopter Borne MobileMT Electromagnetic and Magnetic Survey, Assessment Report Indexing System, Report
41614,
https://apps.nrs.gov.bc.ca/pub/aris
2.
Wagner, D. (1995), Soil sampling and percussion drilling on the Thira Property, Omineca Mining District, BC, Assessment Report Indexing System, Report 24109,
https://apps.nrs.gov.bc.ca/pub/aris
3.
Wagner, D. (1996), Assessment report, Diamond drilling on the Thira Property, Omineca Mining District, BC, Assessment Report Indexing System, Report 24392,
https://apps.nrs.gov.bc.ca/pub/aris
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.
FORWARD LOOKING STATEMENTS
The information contained herein contains "forward-looking statements" within the meaning of the
United States Private Securities Litigation Reform Act of 1995 and "forward-looking information"
within the meaning of applicable Canadian securities legislation. "Forward-looking information"
includes, but is not limited to, statements with respect to the activities, events or developments that
the Company expects or anticipates will or may occur in the future, including, without limitation,
planned exploration activities. Generally, but not always, forward-looking information and statements
can be identified by the use of words such as "plans", "expects", "is expected", "budget",
"scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative
connotation thereof or variations of such words and phrases or state that certain actions, events or
results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative
connotation thereof. Forward-looking statements in this news release include, among others,
statements relating to the Company's exploration plans.
Such forward-looking information and statements are based on numerous assumptions, including
among others, that the results of planned exploration activities are as anticipated, the anticipated
cost of planned exploration activities, that general business and economic conditions will not change
in a material adverse manner, that financing will be available if and when needed and on reasonable
terms, that third party contractors, equipment and supplies and governmental and other approvals
required to conduct the Company's planned exploration activities will be available on reasonable
terms and in a timely manner. Although the assumptions made by the Company in providing forward-
looking information or making forward-looking statements are considered reasonable by
management at the time, there can be no assurance that such assumptions will prove to be
accurate.
Forward-looking information and statements also involve known and unknown risks and uncertainties
and other factors, which may cause actual events or results in future periods to differ materially from
any projections of future events or results expressed or implied by such forward-looking information
or statements, including, among others: negative operating cash flow and dependence on third party
financing, uncertainty of additional financing, no known mineral reserves or resources, the limited
operating history of the Company, the influence of a large shareholder, aboriginal title and
consultation issues, reliance on key management and other personnel, actual results of exploration
activities being different than anticipated, changes in exploration programs based upon results,
availability of third party contractors, availability of equipment and supplies, failure of equipment to
operate as anticipated; accidents, effects of weather and other natural phenomena and other risks
associated with the mineral exploration industry, environmental risks, changes in laws and
regulations, community relations and delays in obtaining governmental or other approvals.
Although the Company has attempted to identify important factors that could cause actual results to
differ materially from those contained in the forward-looking information or implied by forward-
looking information, there may be other factors that cause results not to be as anticipated, estimated
or intended. There can be no assurance that forward-looking information and statements will prove
to be accurate, as actual results and future events could differ materially from those anticipated,
estimated or intended. Accordingly, readers should not place undue reliance on forward-looking
statements or information. The Company undertakes no obligation to update or reissue forward-
looking information as a result of new information or events except as required by applicable
securities laws.
SOURCE
Vizsla Copper Corp.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/November2025/25/c3703.html
%SEDAR: 00053112E
For further information:
Contact Information: For more information and to sign-up to the mailing
list, please contact: Craig Parry, Executive Chairman, Chief Executive Officer, Tel: (604) 364-2215 |
Email: [email protected]
CO: Vizsla Copper Corp.
CNW 08:00e 25-NOV-25