Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

SIG.V ·

Sitka GOLD Signs 60,000 Metre Diamond Drilling Contract FOR 2026 at Its Flagship Rc GOLD Project in Yukon

Exploration Programs

NEWS RELEASE

December 18, 2025

NR 25-31

www.sitkagoldcorp.com

SITKA GOLD SIGNS 60,000 METRE DIAMOND DRILLING

CONTRACT FOR 2026 AT ITS FLAGSHIP RC GOLD

PROJECT IN YUKON

VANCOUVER, CANADA – December 18, 2025: Sitka Gold Corp. (“Sitka” or the “Company”)

(TSXV: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce that it has signed a contract with

Kluane Drilling Ltd. to complete up to 60,000 metres of diamond drilling in 2026 at its flagship RC

Gold Project (“RC Gold” or the “Project”) located in the prolific Tombstone Gold Belt in the Yukon .

This will be the largest drilling campaign ever conducted at RC Gold, effectively doubling the total

metres drilled at the Project si nce Sitka’s first drilling program launched in 2020. Drilling in 2026 is

designed to demonstrate the RC Gold Project is host to multiple gold deposits within the Clear Creek

Intrusive Complex (CCIC; see Figure 2) and has the potential to develop into a significant new mining

district. A large portion of the drilling next year will focus on the Rhosgobel target where the discovery

drill program in 2025 has demonstrated the potential for a multi -million ounce intrusion related gold

deposit. Drilling will also focus on the Blackjack and Eiger gold deposit areas, both of which remain

open for expansion of near surface resources and where recent drilling has intersected higher-grade

mineralization at depth, highlighting the potential for underground resources. Dr illing will also

continue at numerous other targets within the CCIC that have had successful initial drill programs

that have intersected intrusion related gold mineralization with significant gold results in addition to

other targets identified elsewhere within the district -scale, 431 square kilometre road accessible

property (see Figures 1 and 2).

Kluane Drilling Ltd., a well established, highly experienced local drilling company based in

Whitehorse, Yukon with over 30 years of experience diamond drilling in the Yukon and around the

world, has been contracted to complete up to 60,000 metres of drilling at the Company’s flagship RC

Gold Project. Kluane Drilling is dedicated to providing quality drilling services based on technical

innovation and human talent and specializes in achieving high drilling production in various drilling

environments. Kluane Drilling has proven to be an exceptional drill contractor for the past three years,

completing the 2025 drilling program on time and under budget, and Sitka looks forward to continuing

to work with them as the Company further advances RC Gold in 2026.

“We are very pleased to have secured the services of Kluane Drilling Ltd. for what will be our largest

ever diamond drilling program planned at our RC Gold Project in 2026,” said Cor Coe, Director and

CEO of Sitka. “ Kluane has been providing Sitka with exceptional drilling services throughout our

annual winter and summer drilling programs at RC Gold since 2023 and we look forward to

continuing to develop the project with them in the coming year as we substantially increase the scale

and scope of drilling. T he expanded drilling program is based on the success of the 2025 drilling

campaign at RC Gold which was increased when strong mineralization containing visible gold over

a large area at surface indicated the discovery of a 3rd gold deposit at the Rhosgobel intrusion. Initial

assay results from Rhosgobel have been exceptional and surface geochemistry and geophysics

indicate the potential for the discovery to grow significantly with further drilling. The Clear Creek

Intrusive Complex is a target rich environm ent where Sitka will continue drilling to grow the known

deposits, follow up on drill results at several targets where significant gold assays have been

intersected in initial drilling and advance and drill test new under -explored targets. With over $45

million in cash and no debt, the Company is fully funded to complete the planned work program at

RC Gold next year and we look forward to receiving the results from the remaining 35 diamond drill

holes of the 2025 season totalling 11,279 metres that are still pending from the Project.”

Figure 1: A long section of the RC Gold Project showing the drilling distribution between Blackjack and

Rhosgobel.

Figure 2: A plan map of the Clear Creek Intrusive Complex (CCIC) showing the updated resource

areas at Blackjack and Eiger, and the six additional areas that have drill targets indicated by the

mauve hatched areas. The map highlights the numerous drill targets that Sitka has outlined within

the CCIC which all are connected by the road network on the project and occur in an area measuring

five (5) km north-south and twelve (12) km east-west. Additional areas highlighted by strong gold in

soil anomalies are being advanced to the drill ready stage with additional geological work in 2025.

RC Gold Project Highlights

The RC Project covers 11 Mid -Cretaceus intermediate intrusions hosting significant Reduced

Intrusion-Related gold style (RIRGS) mineralization with several target areas returning greater than

100 g*m (g/t gold x metres) intersections from initial drilling. The Blackjack and Eiger are the two

most advanced deposits with existing mineral resource estimate s (1,291,000 ounces of gold in

39,962,000 tonnes grading 1.01 g/t gold in an indicated category and 1,044,000 ounces of gold in

34,603,000 tonnes grading 0.94 g/t gold in an inferred category at Blackjack and 440,000 ounces

of gold in 27,362,000 tonnes grading 0.50 g/t gold in an inferred category at Eiger). Deep drilling at

Blackjack (Hole 076 intersected 65.0 m of 2.00 g/t gold from 806.0 metres, which includes two

higher grade intervals of 8.0 m of 4.80 g/t gold and 6.26 m of 5.53 g/t gold ; see press release

dated June 11, 2025, and 164.8 metres of 0.82 g/t gold starting 9 metres from surface, including

119.0 metres of 1.05 g/t gold, 37.9 metres of 2.05 g/t gold and 11.5 metres of 4.32 g/t gold; see

news release dated November 25, 2025) intersected highe r grade mineralization at depth

highlighting the potential for underground resources at Blackjack. Drilling at Rhosgobel outlined a

1.1 km wide zone of RIRGS style mineralization down to a depth of over 400 m. The best results to

date at Rhosgobel were hole DDRCRG-25-010 which intersected 235.9 m of 1.11 g/t gold, including

40.0 m of 2.01 g/t gold and 10.0 m of 5.29 g/t gold , from the surface (see news release dated

September 18, 2025). Drilling at Contact returned impressive results with up to 119.0 metres of 1.01

g/t gold returned from surface, including 10.7 m of 4.1 g/t gold and 1.2 metres of 24.8 g/t gold,

confirming significant gold mineralization at the Contact Zone (see news release dated November

12, 2025).

The expanded 2026 drill program will focus on following up on the new discovery at Rhosgobel,

expanding existing known zones of gold mineralization at Blackjack, Eiger, Pukelman, Contact and

BearPaw and exploring new targets within the property.

About Sitka’s Flagship RC Gold Project

Sitka’s 100% owned RC Gold Project consists of a 431 square kilometre contiguous district -scale

land package located in the heart of Yukon’s Tombstone Gold Belt. The project is located

approximately 100 kilometres east of Dawson City, which has a 5,000 foo t paved runway, and is

accessed via a secondary gravel road from the Klondike Highway which is usable year-round and is

an approximate 2 hour drive from Dawson City. It is the largest consolidated land package

strategically positioned mid -way between the E agle Gold Mine and the past producing Brewery

Creek Gold Mine.

The RC Gold Project now has pit-constrained mineral resources that are contained in two zones: the

Blackjack and Eiger gold deposits with 1,291,000 ounces of gold in 39,962,000 tonnes grading

1.01 g/t gold in an indicated category and 1,044,000 ounces of gold in 34,603,000 tonnes

grading 0.94 g/t gold in an inferred category at Blackjack and 440,000 ounces of gold in

27,362,000 tonnes gradi ng 0.50 g/t gold in an inferred category at Eiger. These resource

estimate numbers are supported by the recently update d technical report for RC Gold, prepared in

accordance with NI 43 -101 standards, entitled “Clear Creek Property, RC Gold Project NI 43 -101

Technical Report Dawson Mining District, Yukon Territory”, prepared by Ronald G. Simpson, P.

Geo., of GeoSim Services Inc. with an effective date of January 21, 2025. This report is available on

SEDAR+ (http://www.sedarplus.ca) and on the Company’s website (www.sitkagoldcorp.com).

Both of these deposits begin at surface, are potentially open pit minable and Initial bottle roll

metallurgical testing confirmed the non -refractory characteristics of the gold mineralization and

returned gold extraction rates averaging around 85%. Furthe r metallurgical testwork in 2024

returned recoveries ranging from 77.6 to 93% for gravity followed by cyanidation.

For the purposes of the current resource model, it is assumed that a likely mill flowsheet would

consist of a gravimetric, flotation, and cyanidation circuit.

The company has now completed 165 diamond drill holes for a total of 59,770 metres across the

Clear Creek Intrusive Complex (CCIC), and an additional 3 holes for 858 metres in the May -Qu

Intrusion. Drilling continues to outline higher grade mineralization at all zones including hole

DDRCCC-24-068 at Blackjack which intersected 678.1 metres of 1.04 g/t gold starting from surface

(see news release dated October 21, 2024), and hole DDRCCC -25-075 which intersected 352.8

metres of 1.55 g/t gold including 108.9 metres of 3.27 g/t gold and 45.0 metres of 4.52 g/t gold

(see news release dated April 22, 2025). Drilling in 2024/2025 has resulted in the discovery of a new

higher grade zone at Rhosggobel including hole DDRCRG -25-010 at Rhosgobel which intersected

235.9 metres of 1.11 g/t gold , including 40.0 m of 2.01 g/t gold and 10.0 m of 5.29 g/t gold, from

surface (see news release dated September 18, 2025).

RC Gold Deposit Model

Exploration on the Property has mainly focused on identifying an intrusion -related gold system

(“IRGS”). The property is within the Tombstone Gold Belt which is the prominent host to IRGS

deposits within the Tintina Gold Province in Yukon and Alaska. Notable deposits from the belt

include: Fort Knox Mine in Alaska with current Proven and Probable Reserves of 230 million tonnes

at 0.3 g/t Au (2.471 million ounces; Sims 2018) (1); Eagle Gold Mine with current Measured and

Indicated Resources of 233 million tonnes at a grade of 0.57 g/t Au at the Eagle Main Zone (4.303

million ounces; Harvey et al, 2022) (2); the Brewery Creek deposit with current Indicated Mineral

Resource of 22.2 million tonnes at a gold grade of 1.11 g/t (0.789 million ounces; Hulse et al. 2020)(3);

the AurMac Project with an Indicated Mineral Resource of 112.5 million tonnes grading 0.63 gram

per tonne gold (2.274 million ounces) (4) plus an Inferred resource of 280.6 million tonnes grading

0.60 g/t gold (5.454 million ounces) (4), the Valley Deposit, with a current Measured and Indicated

Mineral Resource of 7.94 million oz gold at 1.21 g/t and an additional Inferred Mineral Resource of

0.89 million oz at 0.62 g/t gold (5), and the Raven deposit with an inferred mineral resource of 1.1

million oz (19.96 million tonnes at 1.67 g/t gold)(6). The QP has been unable to verify the information

regarding the above resource estimations and the information is not necessarily indicative of the

mineralization on the property that is the subject of the disclosure.

(1) Sims J. Fort Knox Mine Fairbanks North Star Borough, Alaska, USA National Instrument 43 -101 Technical Report. June 11, 2018.

https://s2.q4cdn.com/496390694/files/doc_downloads/2018/Fort -Knox-June-2018-Technical-Report.pdf

(2) Harvey N., Gray P., Winterton J., Jutras M., Levy M.,Technical Report for the Eagle Gold Mine, Yukon Territory, Canada. Victoria Gold Corp. December

31, 2022. https://vgcx.com/site/assets/files/6534/vgcx_ -_2023_eagle_mine_technical_report_final.pdf

(3) Hulse D, Emanuel C, Cook C. NI 43-101 Technical Report on Mineral Resources. Gustavson Associates. May 31, 2020.

https://minedocs.com/22/Brewery-Creek-PEA-01182022.pdf

(4) July 8, 2025,Banyan Gold Corp., News Release. https://banyangold.com/news -releases/2025/banyan-announces-first-indicated-mineral-resources-and-

identifies-high-grade-continuous-zones-at-its-aurmac-project-yukon-canada/

(5)https://snowlinegold.com/2025/05/15/snowline-gold-expands-measured-and-indicated-gold-ounces-by-96-in-updated-mineral-resource-estimate-at-its-valley-

gold-deposit-yukon/

(6) Jutras, M. 2022. Technical Report on the Raven Mineral Deposit, Mayo Mining District Yukon Territory, Canada, prepared fo r Victoria Gold Corp and filed on

SEDAR (www.sedar.com) with an effective date of September 15, 2022

About Sitka Gold Corp.

Sitka Gold Corp. is a well-funded mineral exploration company headquartered in Canada with over

$45 million in its treasury and no debt. The Company is managed by a team of experienced industry

professionals and is focused on exploring for economically viable mineral deposits with its primary

emphasis on gold, silver and copper mineral properties of merit. Sitka is currently advancing its

100% owned, 431 square kilometre flagship RC Gold Project located within the Tombstone Gold

Belt in the Yukon Territory. The Company is also advancing the Alpha Gold Project in Nevada and

currently has drill permits for its Burro Creek Gold and Silver Project in Arizona and the Coppermine

River Project in Nunavut, all of which are 100% owned by Sitka.

*For more detailed information on the Company’s properties please visit our website at

www.sitkagoldcorp.com

Upcoming Events

Sitka Gold will be attending and/or presenting at the following events*:

● Metals Investor Forum (MIF): Vancouver, BC: January 23 - 24, 2026

● Vancouver Resource Investment Conference (VRIC): Vancouver, BC: January 25 - 26,

2026

● AME Roundup: Vancouver, BC: January 26 - 29, 2026

*All events are subject to change.

The scientific and technical content of this news release has been reviewed and approved by Gilles

Dessureau, P.Geo., V.P. Exploration of the Company, and a Qualified Person (QP) as defined by

National Instrument 43-101.

ON BEHALF OF THE BOARD OF DIRECTORS OF

SITKA GOLD CORP.

“Donald Penner”

President and Director

For more information contact:

Donald Penner or Cor Coe

President & Director CEO & Director

778-212-1950 604-817-4753

[email protected] [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary and Forward-Looking Statements

This release includes certain statements and information that may constitute forward -looking

information within the meaning of applicable Canadian securities laws. Forward-looking statements

relate to future events or future performance and reflect the expectations or beliefs of management

of the Company regarding future events. Generally, forward-looking statements and information can

be identified by the use of forward-looking terminology such as “intends” or “anticipates”, or variations

of such words and phrases or statements that certain actions, events or results “may”, “could”,

“should”, “would” or “occur”. This information and these statements, referred to herein as “forward ‐

looking statements”, are not historical facts, are made as of the date of this news release and include

without limitation, statements regarding discussions of future plans, estimates and forecasts and

statements as to management’s expectations and intentions and the Company’s anticipated work

programs.

These forward‐looking statements involve numerous risks and uncertainties and actual results might

differ materially from results suggested in any forward -looking statements. These risks and

uncertainties include, among other things, market uncertainty and the results of the Company’s

anticipated work programs.

Although management of the Company has attempted to identify important factors that could cause

actual results to differ materially from those contained in forward -looking statements or forward -

looking information, there may be other factors that cause results not to be as anticipated, estimated

or intended. There can be no assurance that such statements will prove to be accurate, as actual

results and future events could differ materially from those anticipated in such statements.