Sunday, October 18, 2026
MiningNewsTerminal
Sunday, October 18, 2026 Admin

SLS.TO ·

Solaris and CELEC Announce MOU to Supply Low‐Cost, Emission‐Free Hydroelectric Power to Warintza

Partnerships & JV
March 21, 2022 – Vancouver, B.C. – Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) and its subsidiary
Lowell Mineral Exploration Ecuador S.A. ("Solaris" or “the Company") are pleased to announce the signing
of a Memorandum of Understanding (“MOU”) with Electric Corporation of Ecuador (“CELEC EP”) to supply
low‐cost, locally sourced hydroelectric power to the Warintza Project (“Warintza” or “the Project”) in
southeastern Ecuador.

CELEC  EP  will  provide  locally  sourced  hydroelectric  power  from  the  National  Transmission  System  in

dovetails with the “Ecuador Zero Carbon Program” developed by the Ministry of Environment, Water and Ecological Transition and the National Decarbonization Pact of which Solaris was the first mining signatory in September 2021.

Solaris intends to maximize the potential for efficiencies derived from this abundant, renewable, low‐cost energy source by studying the potential for electrification of infrastructure, mobile mining equipment, including  drills,  trucks  and  shovels,  materials  movement  and  conveyance,  including  gravity‐assisted solutions, and processing and pumping systems.

Mr. Daniel Earle, President & CEO, commented, “The MOU with CELEC supports our vision to study the potential for electrified operations that maximize the structural benefits of the Warintza Project within an  infrastructure‐rich  mining  district  with  the  aim  of  lowering  costs,  increasing  efficiencies,  reducing emissions, and broadly positioning the Project as a leading development opportunity across a range of financial and ESG metrics in the industry.”

Mr. Gonzalo Uquillas Vallejo, General Manager of CELEC, stated, “As a leading strategic public company in the generation and transmission of electric power, we work in compliance with national guidelines to move toward the electrification of all areas of national industry, including large‐scale mining, which will be a mainstay for the development of the Ecuadorian economy in the coming decades."

On behalf of the Board of Solaris Resources Inc. 

“Daniel Earle”

President & CEO, Director

For Further Information 

Jacqueline Wagenaar, VP Investor Relations
Direct:416‐366‐5678 Ext. 203

Email: [email protected]

About Solaris Resources Inc.

Solaris is advancing a portfolio of copper and gold assets in the Americas, which includes: a high‐grade resource with expansion and additional discovery potential at the Warintza copper and gold project in Ecuador; discovery potential on the grass‐roots Tamarugo project in Chile and Capricho and Paco Orco projects in Peru; exposure to US$130M spending / 5‐yrs through a farm‐out agreement with Freeport‐ McMoRan on the Ricardo Project in Chile; and significant leverage to increasing copper prices through its 60%‐interest in the La Verde joint‐venture project with Teck Resources in Mexico.

Cautionary Notes and Forward‐looking Statements

This document contains certain forward‐looking information and forward‐looking statements within the meaning of  applicable  securities  legislation  (collectively  “forward‐looking  statements”).  The  use  of  the  words  “will”  and  “expected” and similar expressions are intended to identify forward‐looking statements. These statements include  statements that CELEC EP will provide locally sourced hydroelectric power from the National Transmission System in 

maximize the potential for efficiencies derived from this abundant, renewable, low‐cost energy source by studying  the  potential  for  electrification  of  infrastructure,  mobile  mining  equipment,  including  drills,  trucks  and  shovels,  materials movement and conveyance, including gravity‐assisted solutions, and processing and pumping systems,  with the aim of lowering costs, increasing efficiencies, reducing emissions, and broadly positioning the Project as a  leading  development  opportunity  across  a  range  of  financial  and  ESG  metrics  in  the  industry.  Although  Solaris  believes that  the expectations  reflected  in such  forward‐looking  statements  and/or  information are  reasonable,  readers are cautioned that actual results may vary from the forward‐looking statements. These statements are based  on a variety of assumptions including assumptions made about the Company’s ability to advance exploration efforts  at the Warintza Project; the results of such exploration efforts; the Company’s ability to achieve its growth objectives;  that Solaris and CELEC will enter into a binding agreement reflecting the terms set out in this news release; and that  CELEC  EP  will  fulfil  its  obligations  set  out  therein.  These  statements  also  involve  known  and  unknown  risks,  uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in  such  forward‐looking  statements,  including  the  risks,  uncertainties  and  other  factors  identified  in  the  Solaris  Management’s  Discussion  and  Analysis  for  the  year  ended  December  31,  2020  available  at  www.sedar.com.  Furthermore, the forward‐looking statements contained in this news release are made as at the date of this news  release and Solaris does not undertake any obligation to publicly update or revise any of these forward‐looking  statements except as may be required by applicable securities laws.