Wednesday, September 16, 2026
MiningNewsTerminal
Wednesday, September 16, 2026 Admin

AZEM.V ·

Arizona Eagle Mining Corp. Announces Acquisition of Three Past-Producing High- Grade Silver Mines to Consolidate Eagle Silver Project

Mergers & Acquisitions

Arizona Eagle Mining Corp. Announces

Acquisition of Three Past-Producing High-

Grade Silver Mines to Consolidate Eagle Silver

Project

Toronto, Ontario--(Newsfile Corp. - April 20, 2026) - Arizona Eagle Mining Corp. (TSXV: AZEM) (the

"Company" or "Arizona Eagle") is pleased to announce that it has entered into agreements to acquire

62 acres of patented land that host three past-producing high-grade silver mines: the Arizona National

Mine, the Lookout Mine and the Silver Belt Mine (the "Silver Parcels"). These parcels are located on

strike with, and approximately one kilometre northeast of, the Company's McCabe gold-silver deposit,

where Phase 1 drilling is currently underway.

Kevin Reid, Chief Executive Officer of Arizona Eagle, commented:

"We are pleased to announce the strategic acquisition of three past-producing high-grade silver

mines, consolidating the Eagle Silver Project, which is located only one kilometre northeast of the

gold and silver McCabe Mine. These high-grade silver mines served as major sources of silver

production in Arizona until the 1930s. Mining operations at that time were limited to relatively shallow

oxidized depths, with the deepest shaft reaching only 150 metres, allowing for the opportunity for

further discoveries at depth. These mines have been privately held by multiple parties and dormant for

almost 100 years. Our recent surface sampling on the Eagle Silver property has returned grades up to

344 g/t silver, with sampling of the Arizona National Mine waste pile returning grades of up to 861 g/t

silver and 15.6 g/t gold.

"Applying the same strategy we are employing at the McCabe gold-silver deposit, we see the

opportunity to revive these mines through the application of modern exploration methods and

systematic drilling, and we firmly believe that the Eagle Project offers exceptional discovery potential

in one of Arizona's most prolific historic gold-silver districts. These acquisitions extend the structural

corridor of mineralization northeast of McCabe by 50%, from 3km to 4.5km and will also increase our

patented land ownership by 18%, from 348 to 410 acres. Our Phase 1 drill program, focused on the

McCabe Mine structure but outside the historic resource estimate, is currently underway and is fully

funded. We look forward to delivering results as we advance these highly prospective projects."

The Silver Parcels cover a mineralized structure striking approximately 1.5 kilometres. Surface sampling

on these claims by Arizona Eagle (previously reported on

February 19, 2025

) has returned silver grades

including 344 g/t, 255 g/t, 234 g/t, as well as 2.4 g/t gold. Recent testing of the tailings dumps in the first

quarter of 2026 adjacent to the Arizona National Mine shaft included a sample that returned a grade of

861 g/t silver, 2.9% zinc, 1.7% lead, and 0.2 g/t gold. A second sample returned 518 g/t silver with 1.3%

zinc. A third sample returned 15.6 g/t gold, 297 g/t silver and 1.5% zinc (see Table 1 below for waste pile

samples).

Arizona Eagle has entered into agreements with the owners of the Silver Parcels to acquire five parcels

totaling 62 acres of patented land. Closing of the acquisitions is expected between June 19 and June

30, 2026, subject to completion of due diligence by the Company.

Figure 1. Eagle Silver Zone displaying Arizona National, Lookout, and Silver Belt Mines

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10145/293322_904f4bb714d76af3_002full.jpg

Figure 2. Select surface sampling results completed by Arizona Eagle on Eagle Silver Project

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10145/293322_904f4bb714d76af3_003full.jpg

Figure 3. Long section showing drill targets at Eagle Gold Zone (3km of strike), with Eagle Silver Zone

extending to NE (1.5 km of strike)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10145/293322_904f4bb714d76af3_004full.jpg

Arizona National Mine

The Arizona National Mine is comprised of three shafts and seven levels to a depth of 500 feet (150

metres). The deposit was mined intermittently between 1915 and 1931 and reported shipments of silver-

lead ore and concentrates (Anderson, 1958

1

).

Figure 4. Long section of the Arizona National Mine showing 7 levels to 500 feet deep

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10145/293322_904f4bb714d76af3_005full.jpg

Recent sampling conducted in February 2026 of the Arizona National Mine waste pile undertaken by the

Company returned numerous samples of high-grade silver, gold and zinc (see Table 1 below).

Table 1: Arizona National Mine Waste Pile Sample Results

Sample

Silver

(g/t)

Gold

(g/t)

Lead

(%)

Zinc

(%)

SS01

0.05

<0.005

0.00054

0.0015

SS02

207

0.138

0.133

0.326

SS03

861

0.156

1.67

2.88

SS04

2.71

0.017

0.0143

0.0237

SS05

518

0.052

0.65

1.26

SS06

3.14

0.005

0.00401

0.0083

SS07

5.97

0.008

0.0081

0.0099

SS08

32.3

0.036

0.359

1.07

SS09

297

15.55

1.48

0.337

SS10

11.4

0.03

0.0222

0.0309

SS11

1.17

0.018

0.00502

0.0114

SS12

26.7

0.006

0.01265

1.955

SS13

0.44

<0.005

0.0012

0.006

SS14

0.35

<0.005

0.0011

0.012

SS15

51.4

0.067

0.132

0.565

SS16

0.19

<0.005

0.00074

0.0058

SS17

67.3

0.018

0.125

0.303

Lookout Mine

This Lookout Mine is located on the Silver Belt vein, about 1,000 feet southwest of the Arizona National

Mine. The mine was last in operation from 1948-1949 and production was reported to consist chiefly of

galena (lead sulphide), sphalerite (zinc sulphide) and gold (Anderson, 1958

1

).

Silver Belt Mine

The Silver Belt Mine was discovered in the 1880s and was mined until the 1930s. The mine includes four

shafts and at least four underground levels. This deposit was mined to a depth of only 250 feet (80

metres), with grades reported up to 20 ounces per ton silver (600g/t), with 3% lead, 4% zinc and minor

gold (Anderson, 1958

1

).

Figure 5. Long section of Silver Belt Mine, which ended production in 1949

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10145/293322_904f4bb714d76af3_006full.jpg

Figure 6. 1890 photograph of the Silver Belt Mine which operated until the 1930s

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10145/293322_904f4bb714d76af3_007full.jpg

Eagle Project Overview

Arizona Eagle holds a 100% interest in the Eagle Project, located in Yavapai County, Arizona. The

Eagle Project is anchored by the past-producing gold and silver McCabe Mine, situated on 348 acres of

private land. Stan West Mining historically invested more than US$35 million (approximately C$110

million in today's dollars) to drill and develop the mine. In 1984, Stan West Mining published a historic

estimate of approximately 878,000 ounces of gold grading 11.7 g/t and 5 million ounces of silver grading

69 g/t,

2

defined to a maximum depth of approximately 440 metres and open in all directions.

Over the past two years, Arizona Eagle has expanded its total land position to 4,169 acres through

staking and acquisitions surrounding the McCabe Mine. During this time, the Company completed

exploration programs focused on geological mapping, surface sampling, helicopter-borne VTEM

surveys and ground-based induced polarization surveys that identified multiple parallel mineralized

structures that have not been historically drill tested.

Phase 1 Drill Program

In the first quarter of 2026, the Company initiated a fully-funded Phase 1 drill program totaling

approximately 4,500 metres. The drill program is designed in part to explore the lateral and vertical

continuity of the McCabe veins in and around the historic resource. The drill program is expected to

conclude in June 2026. Core samples from the initial drill holes have been submitted for laboratory

analysis, with assay results pending. A second core drill rig is scheduled to mobilize to the Eagle Project

in July 2026 for further drilling of both the McCabe Mine and Eagle Silver Project.

About Arizona Eagle Mining Corp.

Arizona Eagle is a mineral exploration company focused on the acquisition, exploration, and

development of mineral properties. Arizona Eagle's principal asset is the Eagle Project, a 4,169-acre

property comprised of patented and unpatented claims located near the town of Prescott Valley in

Yavapai County, Arizona. The Eagle Project is centred on the past-producing McCabe Mine, a high-

grade gold-silver deposit, and includes multiple parallel structures hosting past-producing mines that

remain largely untested by modern drilling. While Arizona Eagle's primary focus will be on the exploration

and development of the Eagle Project, it will continue to own Core Nickel's land portfolio in the

Thompson Nickel Belt of northern Manitoba.

The scientific and technical information contained in this news release has been reviewed and approved

by Clyde Smith, PhD, Vice-President, Exploration of the Company, who is a Qualified Person as defined

under National Instrument 43-101 -

Standards of Disclosure for Mineral Projects

.

For Further Information

For further information on Arizona Eagle, please contact:

Kevin Reid

Chief Executive Officer and Director

Email:

[email protected]

https://www.arizonaeaglemining.com/

Cautionary Statement Regarding Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (collectively,

"forward-looking statements") within the meaning of applicable securities laws. Any statements that

are contained in this news release that are not statements of historical fact may be deemed to be

forward-looking statements. Forward-looking statements are often identified by terms such as "may",

"should", "anticipate", "will", "estimates", "believes", "intends", "expects" and similar expressions

which are intended to identify forward-looking statements. More particularly and without limitation, this

news release contains forward-looking statements, including statements concerning the proposed

acquisition of the Silver Parcels and the expected closing thereof, the consolidation of the Eagle

Silver Project, the Company's exploration activities and drill program at the Eagle Project, the

expected timing and receipt of assay results, the mobilization of additional drill rigs, and the potential

expansion of the historic estimate. Forward-looking statements are inherently uncertain, and the

actual performance may be affected by a number of material factors, assumptions and expectations,

many of which are beyond the control of the Company, including expectations and assumptions

concerning the Company's ability to complete the acquisition of the Silver Parcels on the proposed

terms or at all, including the completion of satisfactory due diligence, the timely receipt of all required

regulatory approvals, including the approval of the TSXV, the Company's ability to obtain clear title to

the Silver Parcels, the ability of the Company to execute on the proposed exploration program at the

Eagle Project, commodity price fluctuations, the availability of financing on acceptable terms,

environmental and permitting risks, and risks inherent in mineral exploration and development.

Readers are cautioned that assumptions used in the preparation of any forward-looking statements

may prove to be incorrect. Events or circumstances may cause actual results to differ materially from

those predicted as a result of numerous known and unknown risks, uncertainties and other factors,

many of which are beyond the control of the Company. Readers are further cautioned not to place

undue reliance on any forward-looking statements, as such information, although considered

reasonable by management of the Company at the time of preparation, may prove to be incorrect and

actual results may differ materially from those anticipated. The forward-looking statements contained

in this news release are made as of the date of this news release and are expressly qualified by the

foregoing cautionary statement. Except as expressly required by securities law, the Company does

not undertake any obligation to update publicly or to revise any of the included forward-looking

statements, whether as a result of new information, future events or otherwise.

This news release does not constitute an offer to sell or a solicitation of an offer to buy the

securities described herein in the United States or in any other jurisdiction, nor shall there be

any sale of the securities in any state in which such offer, solicitation or sale would be

unlawful. The securities have not been and will not be registered under the U.S. Securities Act,

or any state securities laws, and accordingly, may not be offered or sold in the United States

except in compliance with the registration requirements of the U.S. Securities Act and

applicable state securities requirements or pursuant to exemptions therefrom.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this news release. No stock exchange, securities commission or other

regulatory authority has approved or disapproved the information contained herein.

1

Anderson, C.A. and Creasey, S.C. 1958. Geology and Ore Deposits of the Jerome Area, Yavapai County, Arizona. Arizona Geological Survey

Professional Paper 308. United States Department of the Interior

2

The historical estimate for the McCabe Deposit is unclassified and predates, and is non-compliant with, current NI 43-101 standards; it is based on

a 1984 "Total Reserve Estimate" by Stan West Mining. The Company's Qualified Person has not done significant work to classify the historic estimate

as current mineral resources or current mineral reserves. Significant data compilation, re-drilling, re-sampling and data verification may be required

by a Qualified Person before the historic resource can be verified and upgraded to be compliant with current NI 43-101 standards.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/293322