Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

LGC.V ·

Lavras Gold Corp. Intersects 1.8 g/t Gold over 123 Metres at Butiá Gold Deposit, LDS Project, Southern Brazil & Provides an Exploration Update Drilling intersection includes 4.1 g/t gold over 21 meters, including 8.5 g/t gold over 1 metre

Drill Results Exploration Programs

Lavras Gold Corp. Intersects 1.8 g/t Gold over

123 Metres at Butiá Gold Deposit, LDS Project,

Southern Brazil & Provides an Exploration

Update

Drilling intersection includes 4.1 g/t gold over 21 meters,

including 8.5 g/t gold over 1 metre

Toronto, Ontario--(Newsfile Corp. - March 3, 2025) -

Lavras Gold Corp. (TSXV: LGC) (OTCQX:

LGCFF)

("

Lavras Gold

" or the "

Compan

y") is pleased to release the results from 18 new drill holes

testing the Butiá Gold Deposit ("Butiá" or "Butiá Gold Deposit"), located at the western edge of the LDS

Project in southern Brazil. Gold mineralization was intersected in all 18 holes reported in this news

release at Butiá, which hosts a Mineral Resource Estimate of 377,000 ounces of gold in the Measured

and Indicated categories and 115,000 ounces of gold in the Inferred category. Several of these 18 new

holes returned more than 100 metres of continuous gold mineralization characterized by higher-grade

subintervals.

Several holes were designed to increase the confidence in the Butiá gold resource

(converting the Inferred Resource into the Measured & Indicated categories) and others to potentially

increase the gold endowment as explained below.

The Company has engaged SGS Laboratory in Belo Horizonte, Brazil to complete a comprehensive

metallurgical test program for Butiá mineralization with testwork currently underway. These new drill

results and initiatives continue to move Lavras Gold toward its short-term corporate goal of defining an

economically feasible gold resource on the LDS Project, focused on the Butiá Gold Deposit and the

adjacent Fazenda do Posto gold target.

HIGHLIGHTS

Drilling

Hole 24BT034 returned:

123.0 metres grading 1.8 g/t gold

from 69.0 metres,

and including:

21.0 metres grading 4.1 g/t gold from 137.0 metres, and including

1.0 metres grading 6.8 g/t gold from 137.0.0 metres,

1.0 metres grading 8.5 g/t gold from 154.0 metres.

2.0 metres grading 5.3 g/t gold from 174.0 metres, and including

1.0 metres grading 5.9 g/t gold from 174.0 metres.

Hole 24BT036 intersected:

191.0 metres grading 1.0 g/t gold

from 50.0 metres

and including:

2.0 metres grading 2.1 g/t gold from 57.0 m

50.0 metres grading 2.2 g/t gold from 70.0.0 metres, and including

:

26.0 metres grading 3.8 g/t gold from 90.0 metres, and including

1.0 metres grading 37.2 g/t gold from 110.0 metres,

15.0 metres grading 1.3 g/t gold from 164.0 metres,

3.0 metres grading 1.3 g/t gold from 191.0 metres,

11.0 metres grading 1.3 g/t gold from 210.0 metres.

"In addition to making new discoveries in this highly prospective gold district, our short-term goal

remains the delineation of an economically feasible gold mine on the LDS Project. The results from this

new round of drilling are critical to our understanding of the Butiá Gold Deposit and the

northeast/southwest trending structures that play a significant role in the pattern and nature of

mineralization at Butiá and, ultimately, the 'mineability' of the deposit," commented Lavras Gold

President & CEO Michael Durose.

"The new drilling results continue to demonstrate the excellent near-surface gold grade and continuity of

the Butiá Gold Deposit. Long continuous intervals of gold mineralization over more than 100 metres

typically with higher-grade subintervals and beginning at or near surface confirm the bulk-tonnage nature

of Butiá. This drilling has also significantly increased our depth of understanding of the geological

controls to mineralization. Part of the on-going drilling program at Butiá is testing the potential for

extensions to mineralization based on our increasingly more detailed and evolving geological model. We

have also initiated a detailed metallurgical testing program for Butiá as part of the overall derisking

strategy for the project.

"An update of drilling results for Fazenda do Posto target is expected as soon as final assay results are

received and the geological interpretation is completed. Drilling is on-going in this area as well as to the

north on the Caneleira Concession, where we made our most recent discovery, Olaria."

[* Footnote: Butiá hosts an Estimated Mineral Resource of 377,000 ounces of gold in the Measured and Indicated categories and 115,000 ounces

of gold in the Inferred category

as

detailed in the technical report (the "Butiá Technical Report") titled "NI 43-101 Technical Report Mineral

Resource for the Butiá Gold Prospect Rio Grande do Sul, Brasil", amended as of November 15, 2024, and originally dated March 21, 2022, with an

effective date of January 25, 2022 and prepared for the Corporation by VMG Consultoria e Soluções Ltda, and co-authored by Volodymyr Myadzel,

MAIG, as the qualified person responsible for the entire Butiá Technical Report, and Michael C. Durose, P. Geo., and Frank Richard Baker,

MIMMM, MAusIMM.]

Discussion of Drill Results - Butiá Deposit

Butiá is the most advanced gold deposit on the LDS Project consisting of the mineral resource as stated

above*, located 150 metres east of the recent Fazenda do Posto gold discovery. The purpose of the

current drilling program at Butiá is to increase the geological confidence of the existing gold resource by

converting a significant portion of inferred geological resources into the measured and indicated

categories and to increase the gold endowment of the existing gold resource. Recent drilling results from

Butiá were disclosed in the

news release dated June 25, 2024

. To date, results from 33 Lavras Gold drill

holes totaling 9,346 metres of drilling have been disclosed based on the 2023 and 2024 drilling

program. This total includes the 18 holes disclosed in this news release (24BT024 to 24BT041).

More

than 30,000 metres of drilling have been completed at Butiá to date, including historical drilling prior to

2023.

Figure 1

is a general location map for the LDS Project deposits and targets. Details of the locations of

the new drill holes can be found in the plan view in

Figure 2.

A long section looking northeast is shown in

Figure 3.

Table 1

details all assay results including newly disclosed results in this press release.

Table

2

tabulates drill hole information including collar coordinates, drill hole azimuth and drill hole depths.

A primary purpose of the recent drilling was to test the lateral continuity of gold mineralization across a

postulated northeast trending structural corridor. Many of the holes were drilled with an azimuth oriented

110 degrees and/or 290 degrees. As shown in

Figure 2

and summarized in

Table 1

, these holes

include 24BT034, 24BT036, 24BT037, 24BT039 and 24BT040 and 24BT041. These holes confirm

continuous gold mineralization across a northeast trending structure. Gold grades generally increase

towards the northwest where sulphide-bearing episyenite is found. Continuous, moderate grade gold is

found in the southeast in areas typically associated with mineralized perthitic granite.

Drill holes 24BT034 and 24BT036 confirm good continuous higher grade gold mineralization between

vertical holes 23BT016, 23BT019, 24BT023, and 23BT024 that were drilled across a northwest trend

and defining continuous gold mineralization from surface to depths of more than 200 metres (see

press

release June 2024

).

Detailed gold assay results by drill hole are summarized in

Table 1

.

The 18 new holes disclosed in

this press release are from 24BT024 to 24BT041

. Some highlights of the recent drilling results

include:

Drill hole 24BT034

was collared 110 metres northwest of drillhole 23BT019 in the north-central portion

of the Butiá gold deposit (see

Figure 2

). The hole was drilled on an azimuth of 110 degrees and inclined

60 degrees. The hole was designed to test the lateral continuity of higher-grade mineralization

encountered in vertical hole 23BT019 that returned 236.0 metres grading 1.40 g/t gold from surface (see

Figure 3

). A long interval of continuous bulk-tonnage disseminated gold mineralization was encountered

from 69.0 meters to a depth of 192.0 metres within mineralized episyenite with minor subintervals of

perthitic granite as detailed below.

Intersected 123.0 metres grading 1.8 g/t gold

from 69.0 metres,

and including:

21.0 metres grading 4.1 g/t gold from 137.0 metres

,

and including

1.0 metres grading 6.8 g/t gold from 137.0 metres, and including

1.0 metres grading 7.1 g/t gold from 153.0 metres,

2.0 metres grading 5.3 g/t gold from 174.0 m,

1.0 metres grading 5.9 g/t gold from 174.0 metres

Drill hole 24BT034 confirms continuous gold mineralization across an interpreted northeast trending

structure. Significantly, a 21.0 metre subinterval of high-grade gold grading 4.1 g/t gold was encountered

in sulphide-bearing episyenite. Several local high-grade intervals of gold ranging from 5.3 g/t gold to 7.1

g/t gold were also found.

Drill hole 24BT036

was collared 140 metres northwest of drillhole 23BT016 and 23BT018 in the

central-west portion of the Butiá gold deposit and drilled on an azimuth of 110 degrees and inclined 60

degrees (see

Figure 2

&

Figure 3

). The purpose of this hole was to better understand the nature, grade

and continuity of gold mineralization in this portion of the deposit across an interpreted northeast

trending structure. Continuous gold mineralization was encountered over long intervals in episyenite and

mineralized perthitic granite. Higher-grade subintervals have been observed typically within zones of

episyenite hosting pyrite and arsenian pyrite. Cross-cutting chlorite quartz-carbonate sulphide veins with

visible gold have also been observed (

Figure 4

). A summary of assay composites is as follows:

Returned 272.0 meters grading 0.80 g/t gold from surface and including:

191.0 metres grading 1.0 g/t gold

from 50.0 metres

and including:

2.0 metres grading 2.1 g/t gold from 57.0 m

50.0 metres grading 2.2 g/t gold from 70.0.0 metres

, and including:

26.0 metres grading 3.8 g/t gold from 26.0 metres

, and including

1.0 metres grading 37.2 g/t gold from 110.0m

15.0 metres grading 1.3 g/t gold from 164.0 metres,

3.0 metres grading 1.3 g/t gold from 191.0 metres,

11.0 metres grading 1.3 g/t gold from 210.0 metres.

Hole 24BT036 provides a good indication of long continuous gold mineralization laterally to depths of

more than 200 metres, and laterally across a northwest-southeast direction.

Drillhole 24BT040

was collared 70 metres southeast of drill hole 24BT036 in the central portion of

Butiá. The hole was drilled on an azimuth of 110 degrees and inclined 60 degrees (see

Figure 2 &

Figure 3

).

Continuous gold mineralization was encountered from surface in mineralized episyenite and

perthitic granite as highlighted below:

181.0 m grading 0.7 g/t gold from surface and including:

5.0 m grading 1.0 g/t gold from 34.0m

4.0 m grading 2.0 g/t gold from 48.0 m

3.0 m grading 2.1 g/t gold from 55.0 m

6.0 m grading 1.8 g/t gold from 60.0 m

8.0 m grading 2.0 g/t gold from 66.0 m

4.0 m grading 1.4 g/t gold from 84.0 m

3.0 m grading 2.8 g/t gold from 100.0 m

2.0 m grading 1.5 g/t gold from 112.0 m

3.0 m grading 1.0 g/t gold from 156.0 m

1.0 m grading 1.5 g/t gold from 173.0 m

Please refer to

Table 1

for more details.

Drill hole 24BT026

was positioned in the east-central portion of the Butiá gold deposit, 140 metres

east of vertical drill hole 23BT019. Drill hole 23BT026 was drilled vertically (see

Figure 2

&

Figure 3

).

The purpose was to better grasp the nature of the geology and extent of gold mineralization vertically in

this portion of the deposit. Multiple long intervals of gold mineralization consisting mainly of disseminated

pyrite +- arsenian pyrite within episyenite and perthitic granite occurred

from 119.0 metres to a depth

of 491.0 metres

. Numerous mineralized intervals were encountered. Highlights are shown below. Refer

to

Table 1

for more detail:

28.0 metres grading 1.4 g/t gold from 167.0 metres

and including:

10.0 metres grading 3.5 g/t gold from 167.0 metres and including

1.0 metres grading 30.6 g/t gold from 169.0 metres

14.0 metres grading 0.8 g/t gold from 391.0 metres and including

6.0 metres grading 1.7 g/t gold from 391.0 metres and including

1.0 metre grading 2.6 g/t gold from 393.0 metres and including

1.0 metre grading 5.5 g/t gold from 395.0 m

10.0 metres grading 1.4 g/t gold from 436.0 m and including:

2.0 metres grading 5.7 g/t gold from 439.0 m and including

1.0 metre grading 8.9 g/t gold from 439.0 m and including

Hole 24BT026 was successful in demonstrating

the depth potential

of mineralization at Butiá.

Drill hole 24BT037

was collared 70 metres southwest of drill hole 24BT040 and drilled on an azimuth of

110 degrees and inclined 60 degrees (see

Figure 2 and Figure 3

). The purpose was to test the

southwestern extension of the deposit.

Multiple closely spaced zones of gold mineralization were

encountered throughout the hole beginning from 32.0 metres to 331.0 metres. Highlights are as follows:

1.0 metre grading 3.5 g/t gold from 51.0 metres

5.0 metres grading 11.7 g/t gold from 66.0 metres and including

1.0 metre grading 56.9 g/t gold from 67.0 metres

13.0 metres grading 0.5 g/t gold from 78.0 metres including

1.0 metre grading 2.9 g/t gold from, 82.0 metres

11.0 metres grading 1.1 g/t gold from 204.0 metres including

1.0 metre grading 1.7 g/t gold from 204.0 metres and

1.0 metre grading 2.1 g/t gold from 207.0 metres and

1.0 metre grading 1.4 g/t gold from 210.00 metres and

1.0 metre grading 1.3 g/t gold from 212.0 metres and

1.0 metre grading 1.8 g/t gold from 213.0 metres

31.0 metres grading 1.1 g/t gold from 242.0 metres and including

1.0 metres grading 3.9 g/t gold from 248.0 metres and

1.0 metre grading 7.4 g/t gold from 249.0 metres and

1.0 metre grading 5.1 g/t gold from 250.0 metres

Drill hole 24BT038

was positioned along the southeastern edge of the Butiá gold deposit and drilled

along an azimuth of 110 degrees at an inclined angle of 60 degrees.

The hole encountered 55.0

metres of continuous gold mineralization grading 0.6 g/t gold from 100.0 metres

, including

several higher-grade subintervals including:

5.0 m grading 2.4 g/t gold from 100.0 metres

8.0 metres grading 1.1 g/t gold from 109.0 metres

2.0 metres grading 1.4 g/t gold from 129.0 metres

1.0 metres grading 1.3 g/t gold from 147.0 metres

Hole 24BT038 was successful

in extending the Butiá mineralized footprint to the southeast

.

Drill hole 24BT041

was collared in the southeast part of Butiá and drilled along an azimuth of 290

degrees at an inclined angle of 60 degrees. The hole encountered moderate disseminated gold near the

top of the hole and better grades at depth. Gold mineralization is hosted within perthitic granite and

episyenite. Highlights are detailed below:

2.0 metres grading 0.6 g/t gold from 187.0 metres

1.0 metres grading 0.6 g/t gold from 191.0 metres

4.0 metres grading 0.9 g/t gold from 219.0 m including

1.0 metres grading 1.1 g/t gold from 221.0 metres and

1.0 metres grading 1.8 g/t gold from 222.0 metres

22.0 metres grading 1.2 g/t gold from 233.0 metres including

7.0 metres grading 1.3 g/t gold from 233.0 metres and

1.0 metre grading 1.8 g/t gold from 236.0 metres and

1.0 metre grading 2.3 g/t gold from 238.0 metres and

1.0 metre grading 2.1 g/t gold from 239.0 metres

5.0 metres grading 2.1 g/t gold from 246.0 metres including

1.0 metre grading 3.2 g/t gold from 249.0 metres and

1.0 metre grading 2.2 g/t gold from 250.0 metres

4.0 metres grading 1.0 g/t gold from 253.0 metres including

1.0 metres grading 1.7 g/t gold from 254.0 metres.

Please refer to

Table 1

for a complete list of all drill holes and detailed assay results.

Table 1. Summary of Drill Hole Composites from the Butiá Gold Deposit

Drill Hole

From

To

Interval

Gold grade

Comment

(metres)

(metres)

(metres)

(grams/tonne)

23BT005

0.00

37.00

37.00

0.74

Episyenite/Perthitic

Granite

Including

4.00

23.00

19.00

1.17

Saprolite

97.00

99.00

2.00

0.32

Perthitic Granite

101.00

103.00

2.00

0.27

Perthitic Granite

23BT009

54.00

58.00

4.00

0.61

Episyenite

73.00

89.00

16.00

0.63

Episyenite

including

74.00

81.00

7.00

1.14

Episyenite

121.00

186.00

65.00

0.51

Episyenite/Perthitic

Granite

141.00

159.16

18.16

0.99

Episyenite

including

127.00

131.00

4.00

0.80

Episyenite

including

141.00

149.00

8.00

1.49

Episyenite

including

142.00

145.00

3.00

2.10

Episyenite

including

168.00

172.00

4.00

1.29

Perthitic Granite

including

177.00

178.00

1.00

0.76

Perthitic

Granite/Episyenite

including

182.00

186.00

4.00

0.65

Episyenite/Perthitic

Granite

208.00

220.00

12.00

0.89

Perthitic Granite

including

208.00

210.00

2.00

1.22

Perthitic Granite

including

214.00

219.00

5.00

1.50

Perthitic Granite

239.00

242.00

3.00

0.45

Perthitic Granite

including

239.00

240.00

1.00

0.81

Perthitic Granite

23BT010

0.00

46.00

46.00

0.48

Episyenite/Perthitic

Granite

Including

0.00

9.00

9.00

1.15

Episyenite

Including

17.00

19.00

2.00

1.18

Episyenite

Including

40.00

42.00

2.00

0.58

Perthitic Granite

Including

45.00

46.00

1.00

0.81

Perthitic Granite

61.00

63.00

2.00

0.44

Perthitic Granite

68.00

73.00

5.00

0.30

Perthitic Granite

96.00

100.00

4.00

0.46

Perthitic Granite

including

96.00

97.00

1.00

1.23

Perthitic Granite

110.00

111.00

1.00

0.51

Episyenite

23BT011

12.00

22.00

10.00

0.76

Perthitic Granite

including

13.00

15.00

2.00

2.64

Perthitic Granite

23BT012

67.00

74.00

7.00

0.51

Episyenite

136.00

246.00

110.00

0.71

Episyenite

Including

142.00

147.00

5.00

1.27

Episyenite

Including

142.00

144.00

2.00

2.68

Episyenite

Including

154.00

174.00

20.00

1.59

Episyenite

Including

154.00

157.00

3.00

4.20

Episyenite

Including

163.00

166.00

3.00

6.06

Episyenite

Including

179.00

182.00

3.00

2.77

Episyenite

Including

191.00

193.00

2.00

4.08

Episyenite

Including

205.00

206.00

1.00

0.90

Episyenite

Including

218.00

220.69

2.69

1.12

Episyenite

Including

227.00

229.00

2.00

0.83

Episyenite

Including

231.50

233.51

2.01

0.80

Episyenite

Including

240.18

242.02

1.84

1.27

Episyenite

Including

243.30

244.00

0.70

1.11

Episyenite

253.53

255.37

1.84

1.59

Perthitic Granite

313.00

332.00

19.00

0.60

Perthitic Granite

Including

325.00

327.00

2.00

1.73

Perthitic Granite

Including

329.00

331.00

2.00

1.43

Perthitic Granite

23BT013

4.00

5.00

1.00

0.44

Perthitic granite

15.00

19.00

4.00

0.30

Perthitic granite

53.00

55.00

2.00

0.35

Perthitic granite

56.00

57.00

1.00

0.26

Perthitic granite

61.00

62.00

1.00

0.44

Perthitic granite

71.00

72.00

1.00

0.60

Perthitic granite

107.00

109.00

2.00

0.34

Perthitic granite

119.00

192.00

73.00

0.74

Episyenite

including

136.00

171.00

35.00

1.18

Episyenite

including

136.00

139.00

3.00

1.00

Episyenite

including

146.00

158.00

12.00

1.54

Episyenite

including

146.00

149.00

3.00

2.21

Episyenite

200.00

201.00

1.00

0.91

Episyenite

202.00

203.00

1.00

0.32

Episyenite

207.00

210.00

3.00

0.59

Episyenite

215.00

217.00

2.00

0.34

Episyenite

218.00

221.00

3.00

1.88

Perthitic granite

225.00

228.00

3.00

0.46

Perthitic granite

231.00

233.00

2.00

0.40

Perthitic granite

236.00

237.00

1.00

0.25

Perthitic granite

245.00

246.00

1.00

0.25

Perthitic granite

248.00

249.00

1.00

0.34

Perthitic granite

257.00

258.00

1.00

0.35

Perthitic granite

23BT014

43.00

47.00

4.00

0.45

Perthitic granite

84.00

85.00

1.00

0.32

Perthitic granite

182.62

185.00

2.38

0.72

Perthitic granite

215.00

216.00

1.00

0.36

Perthitic granite

250.00

260.00

10.00

1.45

Episyenite, vg, gln

23BT015

161.33

162.45

1.12

0.27

Perthitic Granite

182.00

184.00

2.00

0.29

Perthitic Granite

242.00

243.00

1.00

0.24

Perthitic Granite

269.00

274.00

5.00

0.62

Perthitic Granite

including

272.00

273.00

1.00

1.73

Perthitic Granite

23BT016

0.00

160.00

160.00

1.04

Episyenite

including

0.00

109.00

109.00

1.36

Episyenite

including

25.00

54.00

29.00

2.90

Episyenite

including

29.00

34.00

5.00

4.65

Episyenite

Drill Hole

From

To

Interval

Gold grade

Comment

(metres)

(metres)

(metres)

(grams/tonne)

including

30.00

48.00

18.00

3.22

Episyenite

183.00

187.00

4.00

0.34

208.00

224.00

16.00

1.03

Episyenite

including

208.00

214.00

6.00

2.06

Episyenite

256.00

257.00

1.00

0.25

Episyenite

263.00

264.00

1.00

0.29

Episyenite

266.00

267.00

1.00

0.28

Episyenite

270.00

287.00

17.00

0.43

Episyenite

292.00

293.00

1.00

0.28

Episyenite

316.00

323.00

7.00

0.35

Episyenite

23BT017

80.00

133.00

53.00

0.54

including

107.00

115.00

8.00

0.99

Episyenite

including

119.00

124.00

5.00

1.48

Episyenite

including

130.00

132.00

2.00

2.53

Episyenite

23BT018

0.00

221.00

221.00

0.81

Episyenite +/- PG

including

0.00

130.00

130.00

1.15

Episyenite +/- PG

including

32.00

42.00

10.00

1.60

Episyenite

including

47.00

57.00

10.00

1.42

Episyenite

including

117.00

125.00

8.00

3.53

Episyenite +/- PG

23BT019

0.00

236.00

236.00

1.35

Episyenite +/- PG

including

1.00

2.00

1.00

1.57

Saprolite

including

37.00

236.00

199.00

1.56

Episyenite +/- PG

including

75.00

149.00

74.00

2.45

Episyenite +/- PG

including

83.31

84.00

0.69

44.40

Visible gold in QV

including

94.00

95.00

1.00

48.30

Visible gold in QV

including

161.00

176.00

15.00

2.09

Episyenite +/- PG

including

185.00

187.86

2.86

3.66

Episyenite

including

195.00

215.00

20.00

2.35

Episyenite +/- PG

24BT020

71.00

72.00

1.00

1.18

PG

24BT021

0.00

3.00

3.00

0.63

Saprolite

22.00

99.00

77.00

0.37

PG +/- Episyenite

including

22.00

25.00

3.00

0.59

PG

including

22.00

23.00

1.00

1.25

PG

including

59.00

99.00

40.00

0.55

PG +/- Episyenite

including

59.00

60.00

1.00

0.54

PG

including

66.00

67.00

1.00

1.04

Metasomatite

including

72.00

96.00

24.00

0.69

PG

108.00

110.00

2.00

0.25

PG

24BT022

34.00

39.00

5.00

0.23

PG

including

34.00

35.00

1.00

0.69

PG

including

38.00

39.00

1.00

0.32

PG

24BT023

0.00

228.00

228.00

1.03

Episyenite +/- PG

including

35.00

135.00

100.00

1.64

Episyenite

including

72.00

228.00

156.00

1.30

Episyenite +/- PG

Including

72.00

213.00

141.00

1.37

Episyenite +/- PG

including

72.00

170.00

98.00

1.71

Episyenite +/- PG

including

72.00

132.00

60.00

2.31

Episyenite +/- PG

including

72.00

92.00

20.00

2.58

Episyenite

including

72.00

77.00

5.00

3.25

Episyenite

including

77.00

82.00

5.00

3.15

Episyenite

including

87.00

92.00

5.00

3.00

Episyenite

24BT024

0.00

1.00

1.00

0.65

Soil

6.00

7.00

1.00

0.34

Saprolite

24.00

30.00

6.00

0.33

Perthitic Granite

32.00

33.00

1.00

0.25

Perthitic Granite

45.00

51.00

6.00

3.89

Episyenite

including

47.00

48.00

1.00

2.87

Episyenite

including

48.00

49.00

1.00

19.58

Episyenite

120.00

122.00

2.00

0.37

Perthitic Granite

139.00

173.00

34.00

0.28

Perthitic Granite

including

157.00

158.00

1.00

0.54

Perthitic Granite

including

163.00

164.00

1.00

1.10

Perthitic Granite

including

170.00

173.00

3.00

0.68

Perthitic Granite

189.00

191.00

2.00

0.28

Perthitic Granite

220.00

224.00

4.00

0.78

Episyenite

Drill Hole

From

To

Interval

Gold grade

Comment

(metres)

(metres)

(metres)

(grams/tonne)

including

220.00

221.00

1.00

2.62

Episyenite

227.00

258.00

31.00

0.23

Episyenite

including

228.00

236.00

8.00

0.35

Episyenite

including

248.00

250.00

2.00

0.33

Episyenite

including

253.00

254.00

1.00

0.67

Episyenite

266.00

278.00

12.00

0.32

Perthitic Granite

24BT025

0.00

59.00

59.00

0.39

Perthitic Granite

including

5.00

6.00

1.00

0.30

Perthitic Granite

including

10.00

12.00

2.00

0.64

Perthitic Granite

including

16.00

17.00

1.00

0.37

Perthitic Granite

including

19.00

20.11

1.11

0.38

Perthitic Granite

including

23.00

25.00

2.00

0.44

Perthitic Granite

including

32.00

33.00

1.00

0.25

Perthitic Granite

including

41.00

58.00

17.00

0.89

Perthitic Granite

and

46.00

52.00

6.00

1.62

Perthitic Granite

and

46.00

47.00

1.00

4.03

Perthitic Granite

and

50.00

51.00

1.00

3.51

Perthitic Granite

and

57.00

58.00

1.00

1.82

Perthitic Granite

including

83.00

99.00

16.00

0.43

Perthitic Granite

and

88.00

89.00

1.00

1.87

Perthitic Granite

and

91.00

92.00

1.00

1.00

Perthitic Granite

including

139.00

140.00

1.00

0.23

Perthitic Granite

including

167.00

173.00

6.00

0.26

Perthitic Granite

24BT026

96.00

97.00

1.00

0.45

Perthitic Granite

119.00

133.00

14.00

0.23

Perthitic Granite

including

119.00

121.00

2.00

0.40

Perthitic Granite

including

122.00

124.00

2.00

0.40

Perthitic Granite

including

130.00

133.00

3.00

0.34

Perthitic Granite

149.00

150.00

1.00

0.64

Perthitic Granite

155.00

156.00

1.00

1.11

Perthitic Granite

160.00

161.00

1.00

0.28

Perthitic Granite

167.00

195.00

28.00

1.39

Episyenite/Perthitic

Granite

including

167.00

177.00

10.00

3.46

Episyenite/Perthitic

Granite

and

169.00

170.00

1.00

30.57

Episyenite/Perthitic

Granite

and

176.00

177.00

1.00

1.51

Episyenite/Perthitic

Granite

203.00

227.00

24.00

0.30

Perthitic Granite

including

205.00

207.00

2.00

1.64

Perthitic Granite

including

212.00

217.00

5.00

0.36

Perthitic Granite

234.00

235.00

1.00

0.27

Perthitic Granite

239.00

249.00

10.00

0.32

Episyenite

including

240.00

241.00

1.00

0.69

Episyenite

including

243.00

244.00

1.00

0.70

Episyenite

including

246.00

247.00

1.00

0.68

Episyenite

249.00

250.00

1.00

0.33

Episyenite

254.00

255.00

1.00

0.27

Episyenite

271.00

281.00

10.00

0.50

Episyenite

including

272.00

274.00

2.00

1.48

Episyenite

and

272.00

273.00

1.00

2.05

Episyenite

303.00

305.00

2.00

0.34

Perthitic Granite

381.00

384.00

3.00

0.25

Episyenite

including

383.00

384.00

1.00

0.45

Episyenite

391.00

405.00

14.00

0.80

Episyenite

including

391.00

397.00

6.00

1.66

Episyenite

and

393.00

394.00

1.00

2.61

Episyenite

and

395.00

396.00

1.00

5.45

Episyenite

412.00

414.00

2.00

0.29

Perthitic Granite

436.00

446.00

10.00

1.41

Episyenite

including

439.00

441.00

2.00

5.72

Episyenite

including

439.00

440.00

1.00

8.86

Episyenite

488.00

491.00

3.00

0.29

Perthitic Granite

24BT027

128.00

129.00

1.00

0.70

Perthitic Granite

146.00

148.00

2.00

0.90

Perthitic Granite

including

147.00

148.00

1.00

1.59

Perthitic Granite

326.00

342.00

16.00

0.40

Episyenite

including

332.00

339.00

7.00

0.56

Episyenite

333.00

334.00

1.00

0.82

Episyenite

Drill Hole

From

To

Interval

Gold grade

Comment

(metres)

(metres)

(metres)

(grams/tonne)