Lavras Gold Corp. Intersects 1.8 g/t Gold over 123 Metres at Butiá Gold Deposit, LDS Project, Southern Brazil & Provides an Exploration Update Drilling intersection includes 4.1 g/t gold over 21 meters, including 8.5 g/t gold over 1 metre
Lavras Gold Corp. Intersects 1.8 g/t Gold over
123 Metres at Butiá Gold Deposit, LDS Project,
Southern Brazil & Provides an Exploration
Update
Drilling intersection includes 4.1 g/t gold over 21 meters,
including 8.5 g/t gold over 1 metre
Toronto, Ontario--(Newsfile Corp. - March 3, 2025) -
Lavras Gold Corp. (TSXV: LGC) (OTCQX:
LGCFF)
("
Lavras Gold
" or the "
Compan
y") is pleased to release the results from 18 new drill holes
testing the Butiá Gold Deposit ("Butiá" or "Butiá Gold Deposit"), located at the western edge of the LDS
Project in southern Brazil. Gold mineralization was intersected in all 18 holes reported in this news
release at Butiá, which hosts a Mineral Resource Estimate of 377,000 ounces of gold in the Measured
and Indicated categories and 115,000 ounces of gold in the Inferred category. Several of these 18 new
holes returned more than 100 metres of continuous gold mineralization characterized by higher-grade
subintervals.
Several holes were designed to increase the confidence in the Butiá gold resource
(converting the Inferred Resource into the Measured & Indicated categories) and others to potentially
increase the gold endowment as explained below.
The Company has engaged SGS Laboratory in Belo Horizonte, Brazil to complete a comprehensive
metallurgical test program for Butiá mineralization with testwork currently underway. These new drill
results and initiatives continue to move Lavras Gold toward its short-term corporate goal of defining an
economically feasible gold resource on the LDS Project, focused on the Butiá Gold Deposit and the
adjacent Fazenda do Posto gold target.
HIGHLIGHTS
Drilling
Hole 24BT034 returned:
123.0 metres grading 1.8 g/t gold
from 69.0 metres,
and including:
21.0 metres grading 4.1 g/t gold from 137.0 metres, and including
1.0 metres grading 6.8 g/t gold from 137.0.0 metres,
1.0 metres grading 8.5 g/t gold from 154.0 metres.
2.0 metres grading 5.3 g/t gold from 174.0 metres, and including
1.0 metres grading 5.9 g/t gold from 174.0 metres.
Hole 24BT036 intersected:
191.0 metres grading 1.0 g/t gold
from 50.0 metres
and including:
2.0 metres grading 2.1 g/t gold from 57.0 m
50.0 metres grading 2.2 g/t gold from 70.0.0 metres, and including
:
26.0 metres grading 3.8 g/t gold from 90.0 metres, and including
1.0 metres grading 37.2 g/t gold from 110.0 metres,
15.0 metres grading 1.3 g/t gold from 164.0 metres,
3.0 metres grading 1.3 g/t gold from 191.0 metres,
11.0 metres grading 1.3 g/t gold from 210.0 metres.
"In addition to making new discoveries in this highly prospective gold district, our short-term goal
remains the delineation of an economically feasible gold mine on the LDS Project. The results from this
new round of drilling are critical to our understanding of the Butiá Gold Deposit and the
northeast/southwest trending structures that play a significant role in the pattern and nature of
mineralization at Butiá and, ultimately, the 'mineability' of the deposit," commented Lavras Gold
President & CEO Michael Durose.
"The new drilling results continue to demonstrate the excellent near-surface gold grade and continuity of
the Butiá Gold Deposit. Long continuous intervals of gold mineralization over more than 100 metres
typically with higher-grade subintervals and beginning at or near surface confirm the bulk-tonnage nature
of Butiá. This drilling has also significantly increased our depth of understanding of the geological
controls to mineralization. Part of the on-going drilling program at Butiá is testing the potential for
extensions to mineralization based on our increasingly more detailed and evolving geological model. We
have also initiated a detailed metallurgical testing program for Butiá as part of the overall derisking
strategy for the project.
"An update of drilling results for Fazenda do Posto target is expected as soon as final assay results are
received and the geological interpretation is completed. Drilling is on-going in this area as well as to the
north on the Caneleira Concession, where we made our most recent discovery, Olaria."
[* Footnote: Butiá hosts an Estimated Mineral Resource of 377,000 ounces of gold in the Measured and Indicated categories and 115,000 ounces
of gold in the Inferred category
as
detailed in the technical report (the "Butiá Technical Report") titled "NI 43-101 Technical Report Mineral
Resource for the Butiá Gold Prospect Rio Grande do Sul, Brasil", amended as of November 15, 2024, and originally dated March 21, 2022, with an
effective date of January 25, 2022 and prepared for the Corporation by VMG Consultoria e Soluções Ltda, and co-authored by Volodymyr Myadzel,
MAIG, as the qualified person responsible for the entire Butiá Technical Report, and Michael C. Durose, P. Geo., and Frank Richard Baker,
MIMMM, MAusIMM.]
Discussion of Drill Results - Butiá Deposit
Butiá is the most advanced gold deposit on the LDS Project consisting of the mineral resource as stated
above*, located 150 metres east of the recent Fazenda do Posto gold discovery. The purpose of the
current drilling program at Butiá is to increase the geological confidence of the existing gold resource by
converting a significant portion of inferred geological resources into the measured and indicated
categories and to increase the gold endowment of the existing gold resource. Recent drilling results from
Butiá were disclosed in the
news release dated June 25, 2024
. To date, results from 33 Lavras Gold drill
holes totaling 9,346 metres of drilling have been disclosed based on the 2023 and 2024 drilling
program. This total includes the 18 holes disclosed in this news release (24BT024 to 24BT041).
More
than 30,000 metres of drilling have been completed at Butiá to date, including historical drilling prior to
2023.
Figure 1
is a general location map for the LDS Project deposits and targets. Details of the locations of
the new drill holes can be found in the plan view in
Figure 2.
A long section looking northeast is shown in
Figure 3.
Table 1
details all assay results including newly disclosed results in this press release.
Table
2
tabulates drill hole information including collar coordinates, drill hole azimuth and drill hole depths.
A primary purpose of the recent drilling was to test the lateral continuity of gold mineralization across a
postulated northeast trending structural corridor. Many of the holes were drilled with an azimuth oriented
110 degrees and/or 290 degrees. As shown in
Figure 2
and summarized in
Table 1
, these holes
include 24BT034, 24BT036, 24BT037, 24BT039 and 24BT040 and 24BT041. These holes confirm
continuous gold mineralization across a northeast trending structure. Gold grades generally increase
towards the northwest where sulphide-bearing episyenite is found. Continuous, moderate grade gold is
found in the southeast in areas typically associated with mineralized perthitic granite.
Drill holes 24BT034 and 24BT036 confirm good continuous higher grade gold mineralization between
vertical holes 23BT016, 23BT019, 24BT023, and 23BT024 that were drilled across a northwest trend
and defining continuous gold mineralization from surface to depths of more than 200 metres (see
press
release June 2024
).
Detailed gold assay results by drill hole are summarized in
Table 1
.
The 18 new holes disclosed in
this press release are from 24BT024 to 24BT041
. Some highlights of the recent drilling results
include:
Drill hole 24BT034
was collared 110 metres northwest of drillhole 23BT019 in the north-central portion
of the Butiá gold deposit (see
Figure 2
). The hole was drilled on an azimuth of 110 degrees and inclined
60 degrees. The hole was designed to test the lateral continuity of higher-grade mineralization
encountered in vertical hole 23BT019 that returned 236.0 metres grading 1.40 g/t gold from surface (see
Figure 3
). A long interval of continuous bulk-tonnage disseminated gold mineralization was encountered
from 69.0 meters to a depth of 192.0 metres within mineralized episyenite with minor subintervals of
perthitic granite as detailed below.
Intersected 123.0 metres grading 1.8 g/t gold
from 69.0 metres,
and including:
21.0 metres grading 4.1 g/t gold from 137.0 metres
,
and including
1.0 metres grading 6.8 g/t gold from 137.0 metres, and including
1.0 metres grading 7.1 g/t gold from 153.0 metres,
2.0 metres grading 5.3 g/t gold from 174.0 m,
1.0 metres grading 5.9 g/t gold from 174.0 metres
Drill hole 24BT034 confirms continuous gold mineralization across an interpreted northeast trending
structure. Significantly, a 21.0 metre subinterval of high-grade gold grading 4.1 g/t gold was encountered
in sulphide-bearing episyenite. Several local high-grade intervals of gold ranging from 5.3 g/t gold to 7.1
g/t gold were also found.
Drill hole 24BT036
was collared 140 metres northwest of drillhole 23BT016 and 23BT018 in the
central-west portion of the Butiá gold deposit and drilled on an azimuth of 110 degrees and inclined 60
degrees (see
Figure 2
&
Figure 3
). The purpose of this hole was to better understand the nature, grade
and continuity of gold mineralization in this portion of the deposit across an interpreted northeast
trending structure. Continuous gold mineralization was encountered over long intervals in episyenite and
mineralized perthitic granite. Higher-grade subintervals have been observed typically within zones of
episyenite hosting pyrite and arsenian pyrite. Cross-cutting chlorite quartz-carbonate sulphide veins with
visible gold have also been observed (
Figure 4
). A summary of assay composites is as follows:
Returned 272.0 meters grading 0.80 g/t gold from surface and including:
191.0 metres grading 1.0 g/t gold
from 50.0 metres
and including:
2.0 metres grading 2.1 g/t gold from 57.0 m
50.0 metres grading 2.2 g/t gold from 70.0.0 metres
, and including:
26.0 metres grading 3.8 g/t gold from 26.0 metres
, and including
1.0 metres grading 37.2 g/t gold from 110.0m
15.0 metres grading 1.3 g/t gold from 164.0 metres,
3.0 metres grading 1.3 g/t gold from 191.0 metres,
11.0 metres grading 1.3 g/t gold from 210.0 metres.
Hole 24BT036 provides a good indication of long continuous gold mineralization laterally to depths of
more than 200 metres, and laterally across a northwest-southeast direction.
Drillhole 24BT040
was collared 70 metres southeast of drill hole 24BT036 in the central portion of
Butiá. The hole was drilled on an azimuth of 110 degrees and inclined 60 degrees (see
Figure 2 &
Figure 3
).
Continuous gold mineralization was encountered from surface in mineralized episyenite and
perthitic granite as highlighted below:
181.0 m grading 0.7 g/t gold from surface and including:
5.0 m grading 1.0 g/t gold from 34.0m
4.0 m grading 2.0 g/t gold from 48.0 m
3.0 m grading 2.1 g/t gold from 55.0 m
6.0 m grading 1.8 g/t gold from 60.0 m
8.0 m grading 2.0 g/t gold from 66.0 m
4.0 m grading 1.4 g/t gold from 84.0 m
3.0 m grading 2.8 g/t gold from 100.0 m
2.0 m grading 1.5 g/t gold from 112.0 m
3.0 m grading 1.0 g/t gold from 156.0 m
1.0 m grading 1.5 g/t gold from 173.0 m
Please refer to
Table 1
for more details.
Drill hole 24BT026
was positioned in the east-central portion of the Butiá gold deposit, 140 metres
east of vertical drill hole 23BT019. Drill hole 23BT026 was drilled vertically (see
Figure 2
&
Figure 3
).
The purpose was to better grasp the nature of the geology and extent of gold mineralization vertically in
this portion of the deposit. Multiple long intervals of gold mineralization consisting mainly of disseminated
pyrite +- arsenian pyrite within episyenite and perthitic granite occurred
from 119.0 metres to a depth
of 491.0 metres
. Numerous mineralized intervals were encountered. Highlights are shown below. Refer
to
Table 1
for more detail:
28.0 metres grading 1.4 g/t gold from 167.0 metres
and including:
10.0 metres grading 3.5 g/t gold from 167.0 metres and including
1.0 metres grading 30.6 g/t gold from 169.0 metres
14.0 metres grading 0.8 g/t gold from 391.0 metres and including
6.0 metres grading 1.7 g/t gold from 391.0 metres and including
1.0 metre grading 2.6 g/t gold from 393.0 metres and including
1.0 metre grading 5.5 g/t gold from 395.0 m
10.0 metres grading 1.4 g/t gold from 436.0 m and including:
2.0 metres grading 5.7 g/t gold from 439.0 m and including
1.0 metre grading 8.9 g/t gold from 439.0 m and including
Hole 24BT026 was successful in demonstrating
the depth potential
of mineralization at Butiá.
Drill hole 24BT037
was collared 70 metres southwest of drill hole 24BT040 and drilled on an azimuth of
110 degrees and inclined 60 degrees (see
Figure 2 and Figure 3
). The purpose was to test the
southwestern extension of the deposit.
Multiple closely spaced zones of gold mineralization were
encountered throughout the hole beginning from 32.0 metres to 331.0 metres. Highlights are as follows:
1.0 metre grading 3.5 g/t gold from 51.0 metres
5.0 metres grading 11.7 g/t gold from 66.0 metres and including
1.0 metre grading 56.9 g/t gold from 67.0 metres
13.0 metres grading 0.5 g/t gold from 78.0 metres including
1.0 metre grading 2.9 g/t gold from, 82.0 metres
11.0 metres grading 1.1 g/t gold from 204.0 metres including
1.0 metre grading 1.7 g/t gold from 204.0 metres and
1.0 metre grading 2.1 g/t gold from 207.0 metres and
1.0 metre grading 1.4 g/t gold from 210.00 metres and
1.0 metre grading 1.3 g/t gold from 212.0 metres and
1.0 metre grading 1.8 g/t gold from 213.0 metres
31.0 metres grading 1.1 g/t gold from 242.0 metres and including
1.0 metres grading 3.9 g/t gold from 248.0 metres and
1.0 metre grading 7.4 g/t gold from 249.0 metres and
1.0 metre grading 5.1 g/t gold from 250.0 metres
Drill hole 24BT038
was positioned along the southeastern edge of the Butiá gold deposit and drilled
along an azimuth of 110 degrees at an inclined angle of 60 degrees.
The hole encountered 55.0
metres of continuous gold mineralization grading 0.6 g/t gold from 100.0 metres
, including
several higher-grade subintervals including:
5.0 m grading 2.4 g/t gold from 100.0 metres
8.0 metres grading 1.1 g/t gold from 109.0 metres
2.0 metres grading 1.4 g/t gold from 129.0 metres
1.0 metres grading 1.3 g/t gold from 147.0 metres
Hole 24BT038 was successful
in extending the Butiá mineralized footprint to the southeast
.
Drill hole 24BT041
was collared in the southeast part of Butiá and drilled along an azimuth of 290
degrees at an inclined angle of 60 degrees. The hole encountered moderate disseminated gold near the
top of the hole and better grades at depth. Gold mineralization is hosted within perthitic granite and
episyenite. Highlights are detailed below:
2.0 metres grading 0.6 g/t gold from 187.0 metres
1.0 metres grading 0.6 g/t gold from 191.0 metres
4.0 metres grading 0.9 g/t gold from 219.0 m including
1.0 metres grading 1.1 g/t gold from 221.0 metres and
1.0 metres grading 1.8 g/t gold from 222.0 metres
22.0 metres grading 1.2 g/t gold from 233.0 metres including
7.0 metres grading 1.3 g/t gold from 233.0 metres and
1.0 metre grading 1.8 g/t gold from 236.0 metres and
1.0 metre grading 2.3 g/t gold from 238.0 metres and
1.0 metre grading 2.1 g/t gold from 239.0 metres
5.0 metres grading 2.1 g/t gold from 246.0 metres including
1.0 metre grading 3.2 g/t gold from 249.0 metres and
1.0 metre grading 2.2 g/t gold from 250.0 metres
4.0 metres grading 1.0 g/t gold from 253.0 metres including
1.0 metres grading 1.7 g/t gold from 254.0 metres.
Please refer to
Table 1
for a complete list of all drill holes and detailed assay results.
Table 1. Summary of Drill Hole Composites from the Butiá Gold Deposit
Drill Hole
From
To
Interval
Gold grade
Comment
(metres)
(metres)
(metres)
(grams/tonne)
23BT005
0.00
37.00
37.00
0.74
Episyenite/Perthitic
Granite
Including
4.00
23.00
19.00
1.17
Saprolite
97.00
99.00
2.00
0.32
Perthitic Granite
101.00
103.00
2.00
0.27
Perthitic Granite
23BT009
54.00
58.00
4.00
0.61
Episyenite
73.00
89.00
16.00
0.63
Episyenite
including
74.00
81.00
7.00
1.14
Episyenite
121.00
186.00
65.00
0.51
Episyenite/Perthitic
Granite
141.00
159.16
18.16
0.99
Episyenite
including
127.00
131.00
4.00
0.80
Episyenite
including
141.00
149.00
8.00
1.49
Episyenite
including
142.00
145.00
3.00
2.10
Episyenite
including
168.00
172.00
4.00
1.29
Perthitic Granite
including
177.00
178.00
1.00
0.76
Perthitic
Granite/Episyenite
including
182.00
186.00
4.00
0.65
Episyenite/Perthitic
Granite
208.00
220.00
12.00
0.89
Perthitic Granite
including
208.00
210.00
2.00
1.22
Perthitic Granite
including
214.00
219.00
5.00
1.50
Perthitic Granite
239.00
242.00
3.00
0.45
Perthitic Granite
including
239.00
240.00
1.00
0.81
Perthitic Granite
23BT010
0.00
46.00
46.00
0.48
Episyenite/Perthitic
Granite
Including
0.00
9.00
9.00
1.15
Episyenite
Including
17.00
19.00
2.00
1.18
Episyenite
Including
40.00
42.00
2.00
0.58
Perthitic Granite
Including
45.00
46.00
1.00
0.81
Perthitic Granite
61.00
63.00
2.00
0.44
Perthitic Granite
68.00
73.00
5.00
0.30
Perthitic Granite
96.00
100.00
4.00
0.46
Perthitic Granite
including
96.00
97.00
1.00
1.23
Perthitic Granite
110.00
111.00
1.00
0.51
Episyenite
23BT011
12.00
22.00
10.00
0.76
Perthitic Granite
including
13.00
15.00
2.00
2.64
Perthitic Granite
23BT012
67.00
74.00
7.00
0.51
Episyenite
136.00
246.00
110.00
0.71
Episyenite
Including
142.00
147.00
5.00
1.27
Episyenite
Including
142.00
144.00
2.00
2.68
Episyenite
Including
154.00
174.00
20.00
1.59
Episyenite
Including
154.00
157.00
3.00
4.20
Episyenite
Including
163.00
166.00
3.00
6.06
Episyenite
Including
179.00
182.00
3.00
2.77
Episyenite
Including
191.00
193.00
2.00
4.08
Episyenite
Including
205.00
206.00
1.00
0.90
Episyenite
Including
218.00
220.69
2.69
1.12
Episyenite
Including
227.00
229.00
2.00
0.83
Episyenite
Including
231.50
233.51
2.01
0.80
Episyenite
Including
240.18
242.02
1.84
1.27
Episyenite
Including
243.30
244.00
0.70
1.11
Episyenite
253.53
255.37
1.84
1.59
Perthitic Granite
313.00
332.00
19.00
0.60
Perthitic Granite
Including
325.00
327.00
2.00
1.73
Perthitic Granite
Including
329.00
331.00
2.00
1.43
Perthitic Granite
23BT013
4.00
5.00
1.00
0.44
Perthitic granite
15.00
19.00
4.00
0.30
Perthitic granite
53.00
55.00
2.00
0.35
Perthitic granite
56.00
57.00
1.00
0.26
Perthitic granite
61.00
62.00
1.00
0.44
Perthitic granite
71.00
72.00
1.00
0.60
Perthitic granite
107.00
109.00
2.00
0.34
Perthitic granite
119.00
192.00
73.00
0.74
Episyenite
including
136.00
171.00
35.00
1.18
Episyenite
including
136.00
139.00
3.00
1.00
Episyenite
including
146.00
158.00
12.00
1.54
Episyenite
including
146.00
149.00
3.00
2.21
Episyenite
200.00
201.00
1.00
0.91
Episyenite
202.00
203.00
1.00
0.32
Episyenite
207.00
210.00
3.00
0.59
Episyenite
215.00
217.00
2.00
0.34
Episyenite
218.00
221.00
3.00
1.88
Perthitic granite
225.00
228.00
3.00
0.46
Perthitic granite
231.00
233.00
2.00
0.40
Perthitic granite
236.00
237.00
1.00
0.25
Perthitic granite
245.00
246.00
1.00
0.25
Perthitic granite
248.00
249.00
1.00
0.34
Perthitic granite
257.00
258.00
1.00
0.35
Perthitic granite
23BT014
43.00
47.00
4.00
0.45
Perthitic granite
84.00
85.00
1.00
0.32
Perthitic granite
182.62
185.00
2.38
0.72
Perthitic granite
215.00
216.00
1.00
0.36
Perthitic granite
250.00
260.00
10.00
1.45
Episyenite, vg, gln
23BT015
161.33
162.45
1.12
0.27
Perthitic Granite
182.00
184.00
2.00
0.29
Perthitic Granite
242.00
243.00
1.00
0.24
Perthitic Granite
269.00
274.00
5.00
0.62
Perthitic Granite
including
272.00
273.00
1.00
1.73
Perthitic Granite
23BT016
0.00
160.00
160.00
1.04
Episyenite
including
0.00
109.00
109.00
1.36
Episyenite
including
25.00
54.00
29.00
2.90
Episyenite
including
29.00
34.00
5.00
4.65
Episyenite
Drill Hole
From
To
Interval
Gold grade
Comment
(metres)
(metres)
(metres)
(grams/tonne)
including
30.00
48.00
18.00
3.22
Episyenite
183.00
187.00
4.00
0.34
208.00
224.00
16.00
1.03
Episyenite
including
208.00
214.00
6.00
2.06
Episyenite
256.00
257.00
1.00
0.25
Episyenite
263.00
264.00
1.00
0.29
Episyenite
266.00
267.00
1.00
0.28
Episyenite
270.00
287.00
17.00
0.43
Episyenite
292.00
293.00
1.00
0.28
Episyenite
316.00
323.00
7.00
0.35
Episyenite
23BT017
80.00
133.00
53.00
0.54
including
107.00
115.00
8.00
0.99
Episyenite
including
119.00
124.00
5.00
1.48
Episyenite
including
130.00
132.00
2.00
2.53
Episyenite
23BT018
0.00
221.00
221.00
0.81
Episyenite +/- PG
including
0.00
130.00
130.00
1.15
Episyenite +/- PG
including
32.00
42.00
10.00
1.60
Episyenite
including
47.00
57.00
10.00
1.42
Episyenite
including
117.00
125.00
8.00
3.53
Episyenite +/- PG
23BT019
0.00
236.00
236.00
1.35
Episyenite +/- PG
including
1.00
2.00
1.00
1.57
Saprolite
including
37.00
236.00
199.00
1.56
Episyenite +/- PG
including
75.00
149.00
74.00
2.45
Episyenite +/- PG
including
83.31
84.00
0.69
44.40
Visible gold in QV
including
94.00
95.00
1.00
48.30
Visible gold in QV
including
161.00
176.00
15.00
2.09
Episyenite +/- PG
including
185.00
187.86
2.86
3.66
Episyenite
including
195.00
215.00
20.00
2.35
Episyenite +/- PG
24BT020
71.00
72.00
1.00
1.18
PG
24BT021
0.00
3.00
3.00
0.63
Saprolite
22.00
99.00
77.00
0.37
PG +/- Episyenite
including
22.00
25.00
3.00
0.59
PG
including
22.00
23.00
1.00
1.25
PG
including
59.00
99.00
40.00
0.55
PG +/- Episyenite
including
59.00
60.00
1.00
0.54
PG
including
66.00
67.00
1.00
1.04
Metasomatite
including
72.00
96.00
24.00
0.69
PG
108.00
110.00
2.00
0.25
PG
24BT022
34.00
39.00
5.00
0.23
PG
including
34.00
35.00
1.00
0.69
PG
including
38.00
39.00
1.00
0.32
PG
24BT023
0.00
228.00
228.00
1.03
Episyenite +/- PG
including
35.00
135.00
100.00
1.64
Episyenite
including
72.00
228.00
156.00
1.30
Episyenite +/- PG
Including
72.00
213.00
141.00
1.37
Episyenite +/- PG
including
72.00
170.00
98.00
1.71
Episyenite +/- PG
including
72.00
132.00
60.00
2.31
Episyenite +/- PG
including
72.00
92.00
20.00
2.58
Episyenite
including
72.00
77.00
5.00
3.25
Episyenite
including
77.00
82.00
5.00
3.15
Episyenite
including
87.00
92.00
5.00
3.00
Episyenite
24BT024
0.00
1.00
1.00
0.65
Soil
6.00
7.00
1.00
0.34
Saprolite
24.00
30.00
6.00
0.33
Perthitic Granite
32.00
33.00
1.00
0.25
Perthitic Granite
45.00
51.00
6.00
3.89
Episyenite
including
47.00
48.00
1.00
2.87
Episyenite
including
48.00
49.00
1.00
19.58
Episyenite
120.00
122.00
2.00
0.37
Perthitic Granite
139.00
173.00
34.00
0.28
Perthitic Granite
including
157.00
158.00
1.00
0.54
Perthitic Granite
including
163.00
164.00
1.00
1.10
Perthitic Granite
including
170.00
173.00
3.00
0.68
Perthitic Granite
189.00
191.00
2.00
0.28
Perthitic Granite
220.00
224.00
4.00
0.78
Episyenite
Drill Hole
From
To
Interval
Gold grade
Comment
(metres)
(metres)
(metres)
(grams/tonne)
including
220.00
221.00
1.00
2.62
Episyenite
227.00
258.00
31.00
0.23
Episyenite
including
228.00
236.00
8.00
0.35
Episyenite
including
248.00
250.00
2.00
0.33
Episyenite
including
253.00
254.00
1.00
0.67
Episyenite
266.00
278.00
12.00
0.32
Perthitic Granite
24BT025
0.00
59.00
59.00
0.39
Perthitic Granite
including
5.00
6.00
1.00
0.30
Perthitic Granite
including
10.00
12.00
2.00
0.64
Perthitic Granite
including
16.00
17.00
1.00
0.37
Perthitic Granite
including
19.00
20.11
1.11
0.38
Perthitic Granite
including
23.00
25.00
2.00
0.44
Perthitic Granite
including
32.00
33.00
1.00
0.25
Perthitic Granite
including
41.00
58.00
17.00
0.89
Perthitic Granite
and
46.00
52.00
6.00
1.62
Perthitic Granite
and
46.00
47.00
1.00
4.03
Perthitic Granite
and
50.00
51.00
1.00
3.51
Perthitic Granite
and
57.00
58.00
1.00
1.82
Perthitic Granite
including
83.00
99.00
16.00
0.43
Perthitic Granite
and
88.00
89.00
1.00
1.87
Perthitic Granite
and
91.00
92.00
1.00
1.00
Perthitic Granite
including
139.00
140.00
1.00
0.23
Perthitic Granite
including
167.00
173.00
6.00
0.26
Perthitic Granite
24BT026
96.00
97.00
1.00
0.45
Perthitic Granite
119.00
133.00
14.00
0.23
Perthitic Granite
including
119.00
121.00
2.00
0.40
Perthitic Granite
including
122.00
124.00
2.00
0.40
Perthitic Granite
including
130.00
133.00
3.00
0.34
Perthitic Granite
149.00
150.00
1.00
0.64
Perthitic Granite
155.00
156.00
1.00
1.11
Perthitic Granite
160.00
161.00
1.00
0.28
Perthitic Granite
167.00
195.00
28.00
1.39
Episyenite/Perthitic
Granite
including
167.00
177.00
10.00
3.46
Episyenite/Perthitic
Granite
and
169.00
170.00
1.00
30.57
Episyenite/Perthitic
Granite
and
176.00
177.00
1.00
1.51
Episyenite/Perthitic
Granite
203.00
227.00
24.00
0.30
Perthitic Granite
including
205.00
207.00
2.00
1.64
Perthitic Granite
including
212.00
217.00
5.00
0.36
Perthitic Granite
234.00
235.00
1.00
0.27
Perthitic Granite
239.00
249.00
10.00
0.32
Episyenite
including
240.00
241.00
1.00
0.69
Episyenite
including
243.00
244.00
1.00
0.70
Episyenite
including
246.00
247.00
1.00
0.68
Episyenite
249.00
250.00
1.00
0.33
Episyenite
254.00
255.00
1.00
0.27
Episyenite
271.00
281.00
10.00
0.50
Episyenite
including
272.00
274.00
2.00
1.48
Episyenite
and
272.00
273.00
1.00
2.05
Episyenite
303.00
305.00
2.00
0.34
Perthitic Granite
381.00
384.00
3.00
0.25
Episyenite
including
383.00
384.00
1.00
0.45
Episyenite
391.00
405.00
14.00
0.80
Episyenite
including
391.00
397.00
6.00
1.66
Episyenite
and
393.00
394.00
1.00
2.61
Episyenite
and
395.00
396.00
1.00
5.45
Episyenite
412.00
414.00
2.00
0.29
Perthitic Granite
436.00
446.00
10.00
1.41
Episyenite
including
439.00
441.00
2.00
5.72
Episyenite
including
439.00
440.00
1.00
8.86
Episyenite
488.00
491.00
3.00
0.29
Perthitic Granite
24BT027
128.00
129.00
1.00
0.70
Perthitic Granite
146.00
148.00
2.00
0.90
Perthitic Granite
including
147.00
148.00
1.00
1.59
Perthitic Granite
326.00
342.00
16.00
0.40
Episyenite
including
332.00
339.00
7.00
0.56
Episyenite
333.00
334.00
1.00
0.82
Episyenite
Drill Hole
From
To
Interval
Gold grade
Comment
(metres)
(metres)
(metres)
(grams/tonne)