Northern Lights Receives Permit to Drill at Secret Pass Gold Project in Arizona
Northern Lights Receives Permit to Drill
at Secret Pass Gold Project in Arizona
Vancouver, British Columbia . March 31, 2021, Northern Lights Resources Corp.
(“Northern Lights” or the “Company”) (CSE: NLR, OTC: NLRCF) is pleased to announce
that it has received approval from the US Bureau of Land Management (the “BLM”) to
commence drilling at the Secret Pass Gold Project (“Secret Pass” or the “Project”) in
Mohave County, Arizona
A total of 15 holes, for 2,300 metres, have been approved for drilling at 12 target prospects
on the Secret Pass BLM mining claims. The BLM mining claims at Secret Pass have a
total area of 656 hectares and account for the majority of the total license area, comprising
of the northern section of the project license area as well as the FM zone in the southeast
quadrant of the Project area (see Figure 1).
The permit to drill an additional 5 holes, for 1,150 metres, at the Tin Cup prospect on the
State Exploration Permit area (212 hectares) is pending approval from the Arizona State
Land Department (see Figure 1). The Company expects to receive the approval to drill
the planned holes at Tin Cup in the coming weeks.
The targeted prospects have been identified by Northern Lights through a systematic
exploration program over the past six months that has included an airborne magnetic
survey, reinterpretation of historic Induced Polarization (IP) data, detailed mapping and
the collection of over 400 stream and pan concentrate samples ( final assays and
interpretation pending).
CEO, Jason Bahnsen, commented “We are delighted to receive permits to commence
drilling at the Secret Pass Gold Project. Preparation of drill access roads will begin
immediately and our drilling contractor is planning to be on site by April 5th. Drilling will
initially focus on the Fiery Squid and Tentacles prospects before where we see significant
potential associated with numerous historic workings at each of the prospect sites.”
Planned Phase 1 – Drill Program Secret Pass Gold Project
The Phase 1 drill program will focus on two previously unexplored prospects at Fiery
Squid and The Tentacles and the historic mine area at Tin Cup. (see Table 1)
Fiery Squid and The Tentacles Prospects
The initial drilling will focus on the Fiery Squid and The Tentacles prospects. Two holes
are planned at the Fiery Squid prospect and one hole at the Tentacles prospect. Both
prospects have extensive historic underground workings including timber-lined shafts and
several adits. A historic grab sample from the dumps adjacent to the shaft at Fiery Squid
assayed 6 g/t Au.
{01113842;1}
2
The Fiery Squid and Tentacles prospects are located within a zone of intense sericite-
quartz-FeOx alteration which trends northwest and covers an area approximately of 1000
x 500 meters . The alteration is associated with a swarm of rhyolite dykes that have
intruded older andesite volcanics.
The planned holes range in length from 100 to 150 metres and are designed as initial
reconnaissance holes to test mineralization associated with the historic workings.
Tin Cup
Historic drilling at Tin Cup identified a mineralized zone with a strike length of
approximately 245 metres and has been drill tested to a depth of only 180 metres. Based
on historic drilling, high-grade mineralization is localized in 3.0 to 7.6 metres wide, steep
westerly-dipping structures that occur within a much wider mineralized fault zone that
ranges from 30 to 45 metres in width. Historic drill assays from Tin Cup ranged up to 7.6
to 40.4 grams per tonne gold over mineralized widths of 1.5 to 32 metres. See the
Northern Lights press release of October 26, 2020, for further details). The mineralization
has a northwest plunge and is open at depth.
The five holes at Tin Cup (1,150 metres) are planned to confirm high-grade mineralization
from historic drilling to test the down plunge extension of the mineralization and to test
the system to a depth of approximately 350 metres below the surface. Permits to
commence drilling of the Tin Cup holes are pending approval of the Arizona State Land
Department.
Table 1 – Secret Pass Phase 1 Drill Program
Under the permits granted by the BLM, Northern Lights has the flexibility to drill any of the
22 permitted holes and can maintain a progressive rehabilitation program with up to 350
metres of drill holes remaining open at any time during the permit period. The BLM permits
are valid for 2 years and can be renewed for a subsequent 2 years with written approval.
Subject to the final assay results and interpretation of the approximately 400 stream
sediment and pan concentrate samples that were collected by the Company in Q4 2020,
Secret Pass - Phase 1 Drill Program (diamond core size HQ)
Hole Location Azimuth (⁰) Dip (⁰) Length (m)Permit Status
FS01 Fiery Squid 175 -45 150 Approved
FS02 Fiery Squid 175 -45 100 Approved
TEN01 Tentacles 220 -45 150 Approved
TC01 Tin Cup 220 -55 225 Pending
TC02 Tin Cup 220 -65 400 Pending
TC03 Tin Cup 220 -45 175 Pending
TC04 Tin Cup 310 -50 250 Pending
TC05 Tin Cup 40 -60 100 Pending
Total 1,550
{01113842;1}
3
Northern Lights may modify the planned Phase 1 drill plan to include additional prospects
on the BLM mining claims.
Figure 1 –Secret Pass Project Drill Hole Locations
{01113842;1}
4
The scientific and technical data contained in this news release was reviewed and
approved by Gary Artmont (Fellow Member AUSIMM #312718), Head of Geology and
qualified person to Northern Lights Resources, who is responsible for ensuring that the
geologic information provided in this news release is accurate and who acts as a “qualified
person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.
For further information, please contact:
Albert Timcke, Executive Chairman and President
Email: [email protected]
Tel: +1 604 608 6163
Jason Bahnsen, Chief Executive Officer
Email: [email protected]
Tel: +1 604 608 6163
Shawn Balaghi, Investor Relations
Email: [email protected]
Tel: +1 604 773 0242
About Northern Lights Resources Corp.
Northern Lights Resources Corp is a growth -oriented exploration and development
company that is advancing two projects: The 100% owned, Secret Pass Gold Project
located in Arizona; and the Medicine Springs silver -zinc-lead Project located in Elko
County Ne vada where Northern Lights, in joint venture with Reyna Silver are earning
100% ownership.
Northern Lights Resources trades under the ticker of “NLR” on the CSE. This and other
Northern Lights Resources news releases can be viewed at www.sedar.com and
www.northernlightsresources.com.
CAUTIONARY STATEMENT REGARDING FORWARD -LOOKING INFORMATION : This news release
includes certain “forward -looking statements” under applicable Canadian securities legislation. Forward -
looking statements include, but are not l imited to, statements with respect to: the terms and conditions of
the proposed private placement; use of funds; the business and operations of the Company after the
proposed closing of the Offering. Forward -looking statements are necessarily based upon a number of
estimates and assumptions that, while considered reasonable, are subject to known and unknown risks,
uncertainties, and other factors which may cause the actual results and future events to differ materially
from those expressed or implied by su ch forward -looking statements. Such factors include, but are not
limited to: general business, economic, competitive, political and social uncertainties; delay or failure to
receive board, shareholder or regulatory approvals; and the uncertainties surround ing the mineral
exploration industry. There can be no assurance that such statements will prove to be accurate, as actual
results and future events could differ materially from those anticipated in such statements. Accordingly,
readers should not place un due reliance on forward looking statements. The Company disclaims any
intention or obligation to update or revise any forward -looking statements, whether as a result of new
information, future events or otherwise, except as required by law.