NEWS RELEASE  Trading Symbol:  TSX: SVM

SILVERCORP REPORTS Q2 FISCAL 2017 RESULTS: NET INCOME UP 454%, CASH FLOWS FROM OPERATIONS OF $27.0 MILLION ON RECORD SILVER PRODUCTION

VANCOUVER,  British  Columbia  –  November  3,  2016  –  Silvercorp  Metals  Inc.  (“Silvercorp”  or  the “Company”) (TSX: SVM) reported its financial and operating results for the second quarter ended September 30, 2016 (“Q2 Fiscal 2017”).  All amounts are expressed in US Dollars.

SECOND QUARTER HIGHLIGHTS  

  • Net income attributable to equity shareholders of $12.4 million, or $0.07 per share, up 454% compared  with  net  earnings  attributable  to  equity  shareholders  of  $2.2  million  or  $0.01  per share in the prior year period;
  • Silver, lead and zinc sales up 44%, 51%, and 27%, respectively, from the prior year period, to approximately 1.8 million ounces silver, 19.9 million pounds lead, and 5.9 million pounds zinc;
  • Sales of $46.3 million, up 70% from the prior year period;
  • A 16%, 21%, and 22% increase in the head grades of silver, lead, and zinc;
  • Gross margin improved to 58% from 32% in the prior year period;
  • Cash  flows  from  operations  of  $27.0  million,  an  increase  of  $22.4  million  compared  to  $4.6 million in the prior year period;
  • Cash production cost per tonne1 of $55.84 compared with $70.49 in the prior year period;
  • Cash cost per ounce of silver1, net of by‐product credits, of negative $3.05, compared to $1.52 in the prior year period;
  • All‐in  sustaining  cost  per  ounce  of  silver1,  net  of  by‐product  credits,  of  $3.16,  compared  to $12.40 in the prior year quarter; and
  • Ended the period with $92.1 million in cash and short term investments, an increase of $30.1 million compared to $62.0 million as at March 31, 2016.

FINANCIALS 

Net income attributable to the shareholders of the Company in Q2 Fiscal 2017 was $12.4 million, or $0.07 per share, up 454% compared to $2.2 million, or $0.01 per share in Q2 Fiscal 2016.

In the  current quarter, the Company’s  financial results were mainly impacted by  the following: i)

improved head grades yielded higher silver, lead, zinc sales, up 44%, 51% and 27%, respectively; ii) a 14% decrease in total production costs per tonne of ore processed; and iii) the increase of metals prices,  as  the  realized  selling  price  for  silver,  lead,  and  zinc  increased  by  27%,  3%  and  22%, respectively, compared to the same prior year quarter.

1 Non‐IFRS measure, see section 9 of the corresponding management’s discussion and analysis for reconciliation Sales in  Q2 Fiscal 2017 were  $46.3 million, up 70% compared to $27.2 million in  Q2 Fiscal 2016. Silver  and  gold  sales  represented  $27.0  million  and  $1.1  million,  respectively,  while  base  metals represented $18.2 million of total sales in this quarter compared to silver, gold and base metals of $14.7 million, $0.5 million, and $12.0 million, respectively, in Q2 Fiscal 2016.

Cost of sales in Q2 Fiscal 2017 was $19.5 million compared to $18.4 million in Q2 Fiscal 2016.  The cost of sales included $13.8 million (Q2 Fiscal 2016 ‐ $14.4 million) cash costs and $5.7 million (Q2 Fiscal 2016 ‐ $4.0 million) depreciation, amortization and depletion charges. The decrease of cash cost of sales was mainly due to a 21% decrease in cash production costs per tonne of ore processed offset by an increase of metals sold.  The total per tonne ore production cost was $79.61 in Q2 Fiscal 2017, a decrease of 14%, from $92.19 in Q2 Fiscal 2016.

Gross  profit  margin  in  Q2  Fiscal  2017  was  58%  compared  to  32%  in  Q2  Fiscal  2016.    The improvement of gross profit margin was mainly due to: i) the improvement of head grades; ii) the decrease  of  per  tonne  ore  production  costs;  and  iii)  the  increase  of  metal  prices.  Ying  Mining District’s gross profit margin was 61% compared to a 35% gross profit margin in the same prior year quarter, while GC Mine’s profit margin was 38% compared to a 18% gross profit margin in Q2 Fiscal 2016.

Cash flows provided by operating activities were $27.0 million or $0.16 per share in Q2 Fiscal 2017 compared to $4.6 million or $0.03 per share in Q2 Fiscal 2016.  Before changes in non‐cash operating working capital, cash flows provided by operating activities were $24.9 million, an increase of $15.7 million,  compared  to  $9.2  million  in  Q2  Fiscal  2016  as  a  result  of  the  improvement  of  operating earnings.

For the six months ended September 30, 2016, net income attributable to the shareholders of the Company was $17.1 million, or $0.10 per share, up 276% compared to $4.5 million, or $0.03 per share in the same period prior year; sales were $81.6 million, up 37% from $59.4 million in the same prior year period; and cash flows provided by operating activities were $47.2 million or $0.28 per share compared to $18.0 million or $0.11 per share in the same prior year period.   Before changes in non‐cash operating working capital, cash flows provided by operating activities for the six months ended September 30, 2016 were $40.5 million, an increase of $22.0 million or 119%, compared to $18.5 million in the same prior year period.

The Company ended the period with $92.1 million in cash and short term investments, an increase of $30.1 million or 48.5% compared to $62.0 million as at March 31, 2016.

OPERATIONS AND DEVELOPMENT  

In Q2 Fiscal 2017, the Company sold approximately 1.8 million ounces of silver, 19.9 million pounds of lead, and 5.9 million pounds of zinc, up 44%, 51% and 27%, respectively, compared to 1.3 million ounces of silver, 13.2 million pounds of lead, and 4.6 million pounds of zinc in Q2 Fiscal 2016.  The increase of metals sold on a consolidated basis, was mainly due to: i) a 16%, 21%, and 22% increase in  the  head  grades  of  silver,  lead  and  zinc,resulting  largely  from  the  ongoing  dilution  control measures  and  operation  management  improvements;  ii)  a  4%  increase  of  ore  milled;  and  iii)  an increase in silver‐lead concentrate inventories of 1,798 tonnes to 2,228 tonnes in Q2 Fiscal 2016 at the Ying Mining District. As at the end of Q2 Fiscal 2017, Ying Mining District held 3,880 tonnes of silver‐lead concentrate inventories, and the estimated metals contained in silver‐lead concentrate were approximately 0.4 million ounces of silver and 4.5 million pounds of lead.

For  the  six  months  ended  September  30,  2016,  on  a  consolidated  basis,  the  Company  sold approximately 3.5 million ounces of silver, 36.7 million pounds of lead, and 11.1 million pounds of zinc, up 31%, 33% and 23% compared to the same prior year period.

1. Ying Mining District, Henan Province, China  

Operational results ‐ Ying Mining District Q2 2017 Q1 2017 Q4 2016 Q3 2016 Q2 2016 September 30, 2016 June 30, 2016 March 31, 2016 December 31, 2015 September 30, 2015Six Months ended September 30, 2016 2015
Ore Mined (tonne) Ore Milled (tonne)179,194173,508 99,415 152,230 171,014 167,747 99,203 151,035 176,936352,702338,120 337,213
180,154347,901
Head Grades Silver (gram/tonne) Lead (%) Zinc (%)308 310 287 246 4.4 4.0 4.1 3.8 1.1 0.9 0.8 0.7252 3.7 0.8
302305
4.94.7
1.11.1
Recoveries Silver (%) Lead (%) Zinc (%)95.7 95.0 95.4 94.8 96.4 96.3 96.6 95.0 48.4 57.6 50.2 55.194.7 95.0 54.1
95.595.6
96.396.3
42.945.5
Metal Sales Silver (in thousands of ounce) Gold (in thousands of ounce) Lead (in thousands of pound) Zinc (in thousands of pound)1,490 857 1,216 1,132 0.9 0.3 0.5 0.7 14,861 7,379 12,107 11,529 1,820 999 1,168 1,4592,321 1.5 23,456 2,831
1,6303,120
1.0 17,768 1,7851.9 32,629 3,605
Cash mining cost ($ per tonne) Total mining cost ($ per tonne) Cash milling cost ($ per tonne) Total milling cost ($ per tonne)49.13 76.30 8.85 10.8652.33 54.63 55.63 62.15 78.64 83.24 78.91 86.29 10.07 13.70 11.67 11.55 12.25 17.38 14.15 13.7050.70 77.44 9.44 11.5359.43 80.71 12.23 14.51
Cash production cost ($ per tonne) Cash cost per ounce of silver ($) All‐in sustaining cost per ounce of silver ($)61.79 (2.68) 2.3366.27 71.90 71.29 77.95 0.12 2.83 0.25 1.88 5.80 8.92 6.62 9.8863.98 (1.34) 3.9975.81 1.44 9.52
  • Figures may not add due to rounding

In Q2 Fiscal 2017, the total ore mined at the Ying Mining District was 179,194 tonnes, an increase of 5% compared to total ore production of 171,014 tonnes in Q2 Fiscal 2016.  Silver, lead and zinc head grades improved by 23%, 28%, and 53%, respectively, to 302 grams per tonne (“g/t”) for silver, 4.9% for lead, and 1.1% for zinc from 246 g/t for silver, 3.8% for lead, and 0.7% for zinc, respectively, in Q2 Fiscal  2016,  resulting  largely  from  the  ongoing  dilution  control  and  operation  management improvements.

In  Q2  Fiscal  2017,  the  Ying  Mining  District  sold  approximately  1.6  million  ounces  of  silver,  1,000 ounces of gold, 17.8 million pounds of lead, and 1.8 million pounds of zinc, up 44%, 43%, 54%, and 22% respectively, compared to 1.1 million ounces of silver, 700 ounces of gold, 11.5 million pounds of lead, and 1.5 million pounds of zinc in Q2 Fiscal 2016. The increase in metals sold is mainly due to:

i) the improved head grades achieved and higher ore production in the quarter, and ii) an increase in silver‐lead concentrate inventories of 1,798 tonnes to 2,228 tonnes in the prior year quarter as the Company started intentionally to increase its concentrate inventories in reaction to the low metal prices in Q2 Fiscal 2016.

Total  and  cash  mining  costs  per  tonne  in  Q2  Fiscal  2017  were  $76.30  and  $49.13,  respectively, compared to $86.29 and $62.15, respectively, in Q2 Fiscal 2016. The decrease in cash mining costs was  mainly  due  to:  i)  a  22%  decrease  in  contractor  costs;  ii)  a  24%  saving  on  raw  material  and maintenance costs; and offset by a 10% increase in labour costs.

Total ore milled at the Ying Mining District in Q2 Fiscal 2017 was 180,154 tonnes, an increase of 2% compared  to  176,936  tonnes  in  Q2  Fiscal  2016.  Cash  milling  costs  in  Q2  Fiscal  2017  were  $8.85 compared to $11.55 in Q2 Fiscal 2016, and the decrease was mainly due to: i) a 7% reduction on utility costs; ii) a 6% decrease in raw material and maintenance costs; and iii) the exclusion of mineral resource tax from milling costs. Prior to June 30, 2016, mineral resource tax was levied at RMB¥13.0 per tonne of ore milled and included as part of milling costs. Effective July 1, 2016, mineral resource tax was changed to a levy based on a certain percentage of sales, and therefore such tax is excluded from milling costs but expensed directly and included in government fee and other taxes.

Cash production cost per tonne of ore processed at the Ying Mining District in Fiscal Q2 2017 was $61.79, a decrease of 21% compared to $77.95 in Q2 Fiscal 2016 as a result of the decrease in both per tonne cash mining and milling cost.

Cash cost per ounce of silver, net of by‐product credits, at the Ying Mining District, was negative $2.68 in Q2 Fiscal 2017 compared to $1.88 in Q2 Fiscal 2016. The decrease was mainly due to: i) lower  per  tonne  cash  production  costs  as  discussed  above;  and  ii)  a  60%  increase  in  by‐product credits, arising from more lead and zinc sold and higher metal prices.

All in sustaining costs per ounce of silver, net of by‐product credits, at the Ying Mining District in Q2 2017 was $2.33 per ounce of silver compared to $9.88 in Q2 Fiscal 2016. The decrease was mainly due to: i) lower per tonne cash production cost and the increase in by‐product credits as discussed above; and ii) a $0.7 million decrease in sustaining capital expenditures.

For the six months ended September 30, 2016, the total ore mined at the Ying Mining District was 352,702 tonnes, up 4% compared to 338,120 tonnes in the same prior year period. Correspondingly, total ore milled was 347,901 tonnes, up 3% compared to 337,213 tonnes. Average head grades were 305 g/t for silver, 4.7% for lead, and 1.1% for zinc compared to 252 g/t for silver, 3.7% for lead, and 0.8% for zinc, respectively.

During the same time periods, the Ying Mining District sold approximately 3.1 million ounces of silver, 1,900  ounces  of  gold,  32.6  million  pounds  of  lead,  and  3.6  million  pounds  of  zinc,  compared  to 2.3 million ounces of silver, 1,500 ounces of gold, 23.5 million pounds of lead, and 2.8 million pounds of zinc in prior year period.

For the six months ended September 30, 2016, the cash mining costs at the Ying Mining District was $50.70 per tonne, a decrease of 15% compared to $59.43 per tonne in the same prior year period. The cash milling cost was $9.44 per tonne, a decrease of 23% compared to $12.23 in the same prior year period.

Cash cost per ounce of silver and all in sustaining costs per ounce of silver, net of by‐product credits, at the Ying Mining District, for the six months ended September 30, 2016, were negative $1.34 and $3.99 respectively, compared to $1.44 and $9.52 in the same prior year period.

In Q2 Fiscal 2017, approximately 22,188 meters (“m”) of underground diamond drilling (Q2 Fiscal 2016 – 22,846 m) and 5,333 m of preparation tunnelling (Q2 Fiscal 2016 – 6,507 m) were completed and  expensed  as  mining  preparation  costs  at  the  Ying  Mining  District.  In  addition,  approximately 16,013 m of horizontal tunnel, raise, and declines (Q2 Fiscal 2016 – 17,271 m) were completed and capitalized. Total capitalized exploration and development expenditures in  Q2  Fiscal  2017  for the Ying Mining District were $4.8 million compared to $5.7 million in Q2 Fiscal 2016.

For the six months ended September 30, 2016, approximately 35,038 m of underground diamond drilling (same prior year period – 39,212 m) and 10,169 m of preparation tunnelling (same prior year period – 12,563 m) were completed and expensed as mining preparation costs at the Ying Mining District. In addition, approximately 32,677 m of horizontal tunnel, raise, and declines (same prior year  period  –  35,790  m)  were  completed  and  capitalized.  Total  capitalized  exploration  and development expenditures for the six months ended September 30, 2016 for the Ying Mining District were $9.7 million compared to $11.8 million in same prior year period. The Company also paid $1.3 million to renew the mining permit for TLP and LM mine.

2.  GC Mine, Guangdong Province, China 

Operational results ‐ GC MineQ2 2017 Q1 2017 Q4 2016 Q3 2016 Q2 2016 September 30, 2016 June 30, 2016 March 31, 2016 December 31, 2015 September 30, 2015Six Months ended September 30, 2016 2015
Ore Mined (tonne) Ore Milled (tonne)74,69264,349 50,014 71,288 69,546 63,587 50,124 71,593 68,465 99 92 97 107 1.5 2.0 1.9 1.4 2.9 2.7 2.6 2.8 76.8 79.1 80.2 77.0 86.9 84.9 88.3 89.5 85.8 82.6 81.2 82.7 149 118 210 128 1,860 1,970 3,021 1,632 3,407 2,576 3,525 3,172 33.50 26.24 38.22 36.49 41.91 34.76 46.52 44.68 15.60 16.99 15.16 15.81 18.81 20.67 17.30 18.05 49.10 43.23 53.38 52.30 (0.28) (2.24) 4.62 (1.69) 4.76 1.19 9.80 13.73139,041136,273 135,145
76,100139,687
Head Grades Silver (gram/tonne) Lead (%) Zinc (%)107 1.4 2.8
9697
1.61.5
2.82.9
Recovery Rates Silver (%) Lead (%) Zinc (%)77.5 88.6 82.9
76.276.5
86.686.7
86.486.1
Metal Sales Silver (in thousands of ounce) Lead (in thousands of pound) Zinc (in thousands of pound)309 4,052 6,201
183332
2,163 4,1064,023 7,513
Cash mining cost ($ per tonne) Total mining cost ($ per tonne) Cash milling cost ($ per tonne) Total milling cost ($ per tonne)28.61 36.78 12.94 15.5730.87 39.15 14.15 17.0542.49 50.63 15.67 17.94
Cash production cost ($ per tonne) Cash cost per ounce of silver ($) All‐in sustaining cost per ounce of silver ($)41.55 (6.39) (1.49)45.02 (3.65) 1.3258.16 1.52 11.04
  • Figures may not add due to rounding

In  Q2  Fiscal  2017,  the  Company  mined  74,692  tonnes  of  ore  at  the  GC  Mine,  an  increase  of  7% compared to 69,546 tonnes in Q2 Fiscal 2016. Head grades were 96 g/t for silver, 1.6% for lead and 2.8% for zinc, compared to 107 g/t for silver, 1.4% for lead and 2.8% for zinc in Q2 Fiscal 2016. The total mining cost and cash mining cost were $36.78 and $28.61, respectively, compared to $44.68 and $36.49 in Q2 Fiscal 2016. The decrease of cash mining costs was mainly because approximately 24%  of  ore  was  by‐product  ore  from  exploration  tunnelling  or  extracted  from  previously  mined stopes for which direct mining costs were paid in prior periods and the only cost involved was to ship the ore to the mill.

Total ore milled at the GC Mine in Q2 Fiscal 2017 was 76,100 tonnes, an increase of 11% compared to 68,465 tonnes in Q2 Fiscal 2016. The cash milling cost per tonne was $12.94, compared to $15.81 in Q2 Fiscal 2016, with the decrease mainly due to the exclusion of mineral resource tax from milling costs as discussed above.

Correspondingly, cash production cost per  tonne of ore processed at  the GC  Mine was $41.55,  a decrease of 21% compared to $52.30 in Q2 Fiscal 2016 as a result of the decrease in both per tonne cash mining and milling cost.

In Q2 Fiscal 2017, the GC Mine sold approximately 0.2 million ounces of silver, 2.2 million pounds of lead, and 4.1 million pounds of zinc, up 43%, 33% and 29% respectively, compared to 0.1 million ounces of silver, 1.6 million pounds of lead, and 3.2 million pounds of zinc in Q2 Fiscal 2016. The increase of metals sold at GC Mine was mainly due to higher output achieved.

Cash cost per ounce of silver, net of by‐product credits, at the GC Mine, was negative $6.39 in Q2 Fiscal 2017 compared to negative $1.69 in Q2 Fiscal 2016. The decrease was mainly due to i) lower per tonne cash production costs as discussed above; and, ii) a 38% increase in by‐product credits.

All in sustaining costs per ounce of silver, net of by‐product credits, at the GC Mine in Q2 2017 was negative $1.49, compared to $13.73 in Q2 Fiscal 2016. The decrease was mainly due to: i) lower per tonne cash production cost and the increase of by‐product credits as discussion above: and, ii) a $1.0 million decrease in sustaining capital expenditures.

For the six months ended September 30, 2016, the total ore mined at the GC Mine was 139,041 tonnes,  an  increase  of  2%  compared  to  136,273  tonnes  in  the  same  prior  year  period. Correspondingly, total ore milled was 139,687 tonnes, an increase of 3% compared to 135,145 milled in the same prior year period. Average head grades were 97 g/t for silver, 1.5% for lead, and 2.9% for zinc compared to 107 g/t for silver, 1.4% for lead, and 2.8% for zinc, respectively.

During the same time periods, the GC  Mine  sold approximately  0.3  million  ounces  of  silver,  4.0 million pounds of lead, and 7.5 million pounds of zinc, compared to 0.3 million ounces of silver, 4.1 million pounds of lead, and 6.2 million pounds of zinc in the same prior year period.

For the six months ended September 30, 2016, the cash mining costs at the GC Mine was $30.87 per tonne, a decrease of 27% compared to $42.49 per tonne in the same prior year period. The cash milling cost was $14.15 per tonne, a decrease of 10% compared to $15.67 in the same prior year period.

Cash cost per ounce of silver and all in sustaining costs per ounce of silver, net of by‐product credits, at  the  GC  Mine,  for  the  six  months  ended  September  30,  2016,  were  negative  $3.65  and  $1.32 respectively, compared to $1.52 and $11.04 in the same prior year period.

In Q2 Fiscal 2017, approximately 2,245 m of underground diamond drilling (Q2 Fiscal 2016 – 6,882 m) and  3,850  m  of  tunnelling  (Q2  Fiscal  2016  –  3,082  m)  were  completed  and  expensed  as  mining preparation costs at the GC Mine. In addition, approximately 606 m of horizontal tunnel, raise, and declines (Q2 Fiscal 2016 – 530 m) were completed and capitalized. Total capitalized exploration and development expenditures in Q2 Fiscal 2017 for the GC Mine were $0.2 million compared to $0.3 million in Q2 Fiscal 2016.

For  the  six  months  ended  September  30,  2016,  approximately  5,554  m  of  underground  diamond drilling (same prior year period – 14,298 m) and 7,336 m of tunnelling (same prior year period – 7,736 m) were completed and expensed as mining preparation costs at the GC Mine. In addition, approximately 1,188 m of horizontal tunnel, raise, and declines (same prior year period – 685 m) were completed and capitalized. Total capitalized exploration and development expenditures were $0.4 million compared to $0.5 million in the same prior year period.

The significant improvement in the head grades of silver, lead and zinc and improved cost structures since the December quarter of 2015 can be attributed in part to an internal “Enterprise Blog” system in the management of Mine Production and Safety Information which the Company implemented from August 2015.

The “Enterprise Blog” is an internet social media system that makes the distribution and flow of the work related knowledge and information easy and transparent for parties at different locations. In the system, for example, each of the mining stopes, development faces, or equipment is assigned a “blog” name. Daily results of onsite inspection for these stopes or faces by responsible engineers are required to be “published” on their “blogs”. The results are listed in a structured data formatted in a “check  list  table”,  containing  information  and  supporting  photos  as  required  by  the Company.   Related parties at different levels of the management team can access directly to the daily “blog” for each work place, for first hand information.  Meanwhile the “Enterprise Blog” system will also record if a management person has accessed the “blog” to read or comment on the daily results under his responsibility.

With the Enterprise Blog, information collection, distribution, retrieval, and monitoring has become transparent and immediate.  The information and knowledge collected by the frontline technicians or  engineers  freely  flows  throughout  layers  of  the  management  structure.      The  responsible management  person  has  the  pressure,  incentive,  and  tools  to  make  prompt  and  more  accurate decisions that can be instantly delivered to responsible parties.  The benefits of the system are that team member collaboration becomes easy, KPI assessments are fair and timely, and each person is accountable for his work.

Alex Zhang, P.Geo., Vice President, Exploration, is the Qualified Person for Silvercorp under NI 43‐101 and has reviewed and given consent to the technical information contained in this news release.

This earnings release should be read in conjunction with the Company's Management Discussion &
Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which
have been posted on SEDAR atand are also available on the Company's website
atwww.silvercorp.ca.

About Silvercorp  

Silvercorp is a low‐cost silver‐producing Canadian mining company with multiple mines in China. The Company's vision is to deliver shareholder value by focusing on the acquisition of under developed projects with resource potential and the ability to grow organically. For more information, please visit our website at www.silvercorp.ca.

For further information

Silvercorp Metals Inc.

Gordon Neal Vice President, Corporate Development Phone: (604) 669‐9397 Toll Free 1(888) 224‐1881 Email: [email protected] Website: www.silvercorp.ca

CAUTIONARY DISCLAIMER ‐ FORWARD LOOKING STATEMENTS 

Certain of the statements and information in this press release constitute “forward‐looking statements” within the meaning  of  the  United  States  Private  Securities  Litigation  Reform  Act  of  1995  and  “forward‐looking  information” within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “expects”,  “is  expected”, “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”,  “targets”,  “goals”, “forecasts”,  “objectives”,  “budgets”,  “schedules”,  “potential”  or  variations  thereof  or  stating  that  certain  actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward‐looking statements or information.  Forward‐looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; the sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues and capital expenditures; estimated production from the Company’s mines in the Ying Mining District; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company’s operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company’s properties.

Forward‐looking statements or information are subject to a variety of known and unknown risks, uncertainties and other  factors  that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources,  reserves and mineralization  and precious and base metal  recovery;  interpretations  and  assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports;  permits  and  licences;  title  to  properties;  property  interests;    joint  venture  partners;  acquisition  of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration  of  future  acquisitions  into  the  Company’s  existing  operations;    competition;    operations  and  political conditions; regulatory environment in China and Canada;  environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes‐Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This  list  is  not  exhaustive  of  the  factors  that  may  affect  any  of  the  Company’s  forward‐looking  statements  or information.  Forward‐looking  statements  or  information  are  statements  about  the  future  and  are  inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward‐looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year ended March 31, 2016 under the heading “Risk Factors”.  Although the Company has attempted to identify important factors that  could  cause  actual  results  to  differ  materially,  there  may  be  other  factors  that  cause  results  not  to  be  as anticipated,  estimated,  described  or  intended.   Accordingly,  readers  should  not  place  undue  reliance  on forward‐ looking statements or information.

The Company’s forward‐looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward‐looking statements and information if circumstances or  management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward‐looking statements and information.

Condensed Consolidated Interim Statements of Financial Position 

As at September 30, As at March 31, 2016 2016

ASSETS Current Assets

Cash and cash equivalents $                             66,484 $ 41,963

Short‐term investments25,65919,999
Trade and other receivables1,2002,041
Inventories10,0458,857
Due from related parties40103
Income tax receivable‐394
Prepaids and deposits4,1093,960

107,537 77,317

Non‐current Assets

Long‐term prepaids and deposits1,4261,856
Reclamation deposits2,6052,301
Investment in an associate3,3093,133
Other investments391287
Plant and equipment68,72071,045
Mineral rights and properties210,686216,080

TOTAL ASSETS $                          

394,674 $ 372,019

LIABILITIES AND EQUITY Current Liabilities

Accounts payable and accrued liabilities  $                             31,484 $ 27,457

Bank loan4,5044,657
Mine right fee payable3,9273,970
Deposits received7,5905,849
Income tax payable2,251‐
Due to related parties‐179

49,756 42,112

Non‐current Liabilities

Mine right fee payable5,7335,796
Deferred income tax liabilities25,56323,224
Environmental rehabilitation14,06414,328
Total Liabilities95,11685,460

Equity

Share capital231,330230,933
Share option reserve12,96812,628
Reserves25,40925,409
Accumulated other comprehensive loss(43,216)(35,994)
Retained earnings17,614562
Total equity attributable to the equity holders of the Company244,105233,538
Non‐controlling interests55,45353,021
Total Equity299,558286,559

TOTAL LIABILITIES AND EQUITY $                          

394,674 $ 372,019

Condensed Consolidated Interim Statements of Income

(Unaudited ‐ Expressed in thousands of U.S. dollars, except for per share figures)

Three Months Ended September 30, Six Months Ended September 30, 2016 2015 2016 2015

Sales $               46,298 $               27,213 $               81,569 $ 59,433

Cost of sales19,50918,38539,03639,149
Gross profit26,7898,82842,53320,284
General and administrative4,1274,9078,51210,251
Government fees and other taxes1,7611,8473,4563,196
Foreign exchange gain(215)(1,984)(92)(1,397)
(Gain) loss on disposal of plant and equipment(199)(22)65(15)
Share of gain in associate(269)(179)(286)(101)
Impairment of plant and equipment and mineral rights and properties‐‐181‐
Other income(83)(124)(123)(114)
Income from operations21,6674,38330,8208,464
Finance income537264968541
Finance costs(260)(139)(524)(471)
Income before income taxes21,9444,50831,2648,534
Income tax expense5,9381,5298,7381,784

Net income $               16,006 $ 2,979 $               22,526 $ 6,750

Attributable to:

Equity holders of the Company $               12,378 $ 2,234 $               17,052 $ 4,530 Non‐controlling interests 3,628 745 5,474 2,220 $               16,006 $ 2,979 $               22,526 $ 6,750

Earnings per share attributable to the equity holders of the Company

Basic earnings per share $                    0.07 $ 0.01 $                  0.10 $                 0.03 Diluted earnings per share $                    0.07 $ 0.01 $                  0.10 $                 0.03 Weighted Average Number of Shares Outstanding ‐ Basic 167,012,454 170,307,013 166,976,159 170,593,834 Weighted Average Number of Shares Outstanding ‐ Diluted 171,540,139 170,307,013 171,043,667 170,593,834

Condensed Consolidated Interim Statements of Cash Flow

Three Months Ended September 30, Six Months Ended September 30, 2016 2015 2016 2015

Cash provided by Operating activities

Net income $                    16,006 $ 2,979 $                           22,526 $                            6,750 Add (deduct) items not affecting cash:

Finance costs260139524471
Depreciation, amortization and depletion6,0294,40011,3499,377
Share of gain in associate(269)(179)(286)(101)
Impairment of plant and equipment and mineral rights and properties‐‐181‐
Income tax expense5,9381,5298,7381,784
Finance income(537)(264)(968)(541)
(Gain) loss on disposal of plant and equipment(199)(22)65(15)
Share‐based compensation197343440508
Income taxes (paid) recovered(3,006)56(2,915)(303)
Interest received537264968541
Interest paid(50)‐(101)‐
Changes in non‐cash operating working capital2,134(4,614)6,701(520)
Net cash provided by operating activities27,0404,63147,22217,951

Investing activities

Mineral rights and properties Capital expenditures (5,688) (1,364) (10,708) (8,730) Plant and equipment Additions (739) (2,272) (3,123) (2,990) Proceeds on disposals 15 25 32 30 Other investments

Proceeds on disposals33‐33‐
Reclamation deposit paid‐‐(385)(9)
Net (purchases) redemptions of short‐term investments(1,995)5,658(5,976)5,707
Net cash (used in) provided by investing activities(8,374)2,047(20,127)(5,992)

Financing activities

Non‐controlling interests

Distribution(1,460)‐(1,460)‐
Cash dividends distributed‐(638)‐(1,323)
Proceeds from issuance of common shares82‐297‐
Common shares repurchased as part of normal course issuer bid‐(1,267)‐(1,267)
Net cash used in financing activities(1,378)(1,905)(1,163)(2,590)
Effect of exchange rate changes on cash and cash equivalents(406)(2,990)(1,411)(2,332)
Increase in cash and cash equivalents16,8821,78324,5217,037
Cash and cash equivalents, beginning of the period49,60265,43341,96360,179

Cash and cash equivalents, end of the period $                   

66,484 $                     67,216 $                           66,484 $                          67,216

Mining Data

(Expressed in thousands of U.S. dollars, except for mining data figures)

Three months ended September 30, 2016
Ying Mining District1GC2Total

Production Data Mine Data

Ore Mined (tonne)179,19474,692253,886
Ore Milled (tonne)180,15476,100256,254
+Mining cost per tonne of ore mined ($)76.3036.7864.67
Cash mining cost per tonne of ore mined ($)49.1328.6143.09
Non cash mining cost per tonne of ore mined ($)27.178.1721.58
+Unit shipping costs($)3.81‐2.68
+Milling cost per tonne of ore milled ($)10.8615.5712.26
Cash milling cost per tonne of ore milled ($)8.8512.9410.07
Non cash milling cost per tonne of ore milled ($)2.012.632.19

+ Average Production Cost

Silver ($ per ounce)5.966.956.27
Gold ($ per ounce)424‐458
Lead ($ per pound)0.280.420.30
Zinc ($ per pound)0.280.430.29
Other ($ per pound)‐‐‐
+ Total production cost per ounce of Silver, net of by‐product credits ($)0.33(1.97)0.10
+ Total cash cost per ounce of Silver, net of by‐product credits ($)(2.68)(6.39)(3.05)
+ All‐in sustaining cost per ounce of Silver, net of by‐product credits ($)2.33(1.49)3.16
+ All‐in cost per ounce of Silver, net of by‐product credits ($)2.82(1.25)3.62

Recovery Rates

Silver (%)95.576.293.2
Lead (%)96.386.695.1
Zinc (%)42.986.465.8

Head Grades

Silver (gram/tonne)30296241
Lead (%)4.91.63.9
Zinc (%)1.12.81.6

Concentrate in stock  Lead concentrate (tonne)  3,880 101 3,981 Zinc concentate (tonne) 280 127 407

Sales Data  Metal Sales 

Silver (in thousands of ounces)1,6301831,813
Gold (in thousands of ounces)1.0‐1.0
Lead (in thousands of pounds)17,7682,16319,931
Zinc (in thousands of pounds)1,7854,1065,891
Other (in thousands of pound)‐365365

Metal Sales 

Silver (in thousands of $)24,9232,05126,974
Gold (in thousands of $)1,087‐1,087
Lead (in thousands of $)12,6841,45914,143
Zinc (in thousands of $)1,2602,8334,093
Other (in thousands of $)‐11
39,9546,34446,298

Average Selling Price, Net of Value Added Tax and Smelter Charges

Silver ($ per ounce)15.2911.2114.88
Gold ($ per ounce)1,087‐1,087
Lead ($ per pound)0.710.670.71
Zinc ($ per pound)0.710.690.69

1 Ying Mining District includes mines: SGX, TLP, HPG,LM, BCG and HZG.

2 GC Silver recovery rate consists of 55.9% from lead concentrates and 20.3% from zinc concentrates.

2 GC Silver sold in zinc concentrates is subjected to higher smelter and refining charges which lower the net silver selling price.

+ Non‐IFRS measures, see section 9 of the corresponding management's decision and analysis for reconciliation.