Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

FNI.CN ·

Completion of Gochager Lake Drill Program

Exploration Programs

Fathom Nickel Inc.

FATHOM ANNOUNCES COMPLETION OF 2,000+ METER DRILL PROGRAM AT THE GOCHAGER LAKE

PROPERTY AND THE COMPLETION OF THE FIRST ANNIVERSARY PAYMENTS UNDER THE ORIGINAL

GOCHAGER LAKE EARN-IN AGREEMENT

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY

FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAWS

Highlights:

• Seven drillholes completed totaling 2,168 meters.

• Semi-massive, massive sulphides intersected in GL 23005 and GL23010 ; extending the nickel-

copper-cobalt mineralization intersected in GL23003 (see Press Release April 12, 2023) both up

and down plunge (Photos 1 & 2)1.

• Disseminated, interstitial, net-textured, semi-massive, sulphide mineralization occurring at 304

– 384.5m1 in GL23009 (Photo 3)1 significantly extends the historic Goc hager Lake deposit at

depth.

• Massive sulphide veins (Photo 4)1 observed cross cutting the gabbro host rock throughout the

drilled area.

• Multiple off -hole borehole electromagnetic (BHEM) responses detected in all drillholes and

BHEM surveys suggest significant conductivity build up at depth.

• Two strong off -hole BHEM anomalies associated with favourable host rocks encountered in

drillhole GL23011 located approximately 400 meters northeast of the Gochager Lake deposit.

Calgary, Alberta – September 28, 2023 – Fathom Nickel Inc. (the “Company” or “Fathom”) (CSE: FNI )

(FSE: 6Q5), (OTCQB: FNICF) is pleased to announce the completion of the Fall 2023 drill program at the

historic Gochager Lake deposit within the Company’s 22,620 Ha Gochager Lake Project.

Ian Fraser, CEO and VP Exploration stated, “ The recently completed drill program has accomplished

exactly what we set out to do. We now have a much better understanding of geological controls on the

impressive nickel-cobalt values intersected in GL23003 and we have been able to extend this mineralization

both up and down plunge. We are dealing with a very dynamic intrusive at Gochager Lake and we are very

encouraged t o be intersecting a wide range of sulphide textures typical of magmatic nickel sulphide

deposits. We confirmed that the deep off -hole conductor detected in historic drillhole GL 18002 is

associated with a build up of semi -massive to massive sulphide mineralization at depth. Furthermore,

BHEM continues to indicate conductivity build-up beyond the bottom of several drillholes, suggesting the

possible continuation of mineralization at depth. We look forward to continuing to demonstrate that there

are chutes of high- grade nickel-copper-cobalt mineralization within the historic Gochager Lake deposit2.

We also look forward to defining the source, or the “feeder” , of the magmatic sulphide textures we

continue to consistently encounter at the Gochager Lake deposit.”

In respect of the step -out drillhole 400 meters northeast of the Gochager Lake deposit, Mr. Fraser

continued, “We are also very encouraged and intrigued with the presence of massive sulphide veinlets

occurring in GL23011 – some 400 meters from the known Gochager Lake deposit. Additionally, BHEM

identified two prominent off-hole anomalies occurring within favourable host rock proximate to the off-

hole anomalies. GL23011 was a follow-up to a VTEM anomaly first detected in 2008 but never drilled until

now.”

2

1 – Reported drillhole intersections are down-hole intersection length and are not a true thickness. At present there is insufficient

information to determine true thickness. Furthermore, the Company cautions the reader the presentation of semi -massive to

massive sulphide mineralization photographs is not to be construed as potential contained metal. Laboratory assay results wil l

determine the amount of contained metal in this style of mineralization. Assay results are expected within the next four-five weeks.

2 - The Saskatchewan Mineral Deposit Index (SMID#0880) reports drill indicated reserves at the historic Gochager Lake Deposit of

4,262,400 tons grading 0.295% Ni and 0.081% Cu mineable by open pit. Fathom cannot confirm the resource estimate, nor the

parameters and methods used to prepare the reserve estimate. The estimate is not considered NI43 -101 compliant and further

work is required to verify this historical drill indicated reserve.

Photo – 1: Drillhole GL23010 Disseminated, Semi-Massive Sulphide Textures at drillhole depth ~193-

198 meters

Photo – 2: Drillhole GL23010 Disseminated Coarse Pentlandite in Semi-Massive Sulphide Host at

drillhole depth 164.6 meters

3

Photo – 3: Drillhole GL23009 Semi-Massive Sulphide with Host Rock Inclusions at drillhole depth ~379

meters

Photo – 4: Drillhole GL23008 Massive Sulphide Vein with Interpreted Loop Pentlandite, Chalcopyrite

Texture at drillhole depth ~255 meters

Photo 5 Disseminated, Coarse Pentlandite Drillhole GL23003 at drillhole depth ~ 143 meters

Note: assay values for GL23003 were reported in Press Release April 12,2023. Photo 5 is the half-core from

which assay results have been received. Note that the half-core has been polished, revealing and visually

enhancing the disseminated pentlandite (Pn) occurring within massive pyrrhotite (Po). A lso note the

presence of chalcopyrite (Cpy) stringers.

4

Drillhole Location Details:

Drillhole ID UTM Easting UTM Northing Azimuth Dip Total Depth

(m)

GL23005 502409.1 6180277.1 140° -55° 236.0

GL23006 502433.7 6180110.2 340° -66° 266.0

GL23007 502433.8 6180110.1 340° -72° 299.0

GL23008 502242.3 6180180.0 110° -55° 341.0

GL23009 502362.8 6180280.8 156° -69° 428.0

GL23010 502477.5 6180292.2 197° -55.5° 314.0

GL23011 502735.9 6180631.4 109° -65° 284.0

Figure 1

Fathom 2023 Drillhole Plan Map

Notes to Figure 1

• GL23011 (not shown on drillhole plan map) was collared ~ 400 meters to the northeast.

5

• The plan map illustrates drillhole traces projected to surface.

• The interpretation: zones of greater concentrations of sulphide mineralization engulfed in a shell

of disseminated sulphides is preliminary. S tructural measurements and data collected from the

Fall drill program has been incorporated in this preliminary interpretation.

• There is historic drillhole data (1967 -1970) and surface TDEM data (conductivity) that supports

that the disseminated style of mineralization continues along strike to the northeast of GL23004

and west-southwest of GL23009 and GL23008.

The Company anticipates the receipt of assay results from the 2023 Fall drill program within four to five

weeks. We continue to model BHEM and surface geophysics results. The Company will release results of

the BHEM survey analysis in the coming weeks. In addition to drilling and geophysics , the Company

completed some baseline soil geochemistry profiles in the area of the 2008 VTEM anomaly that was tested

by GL23011, as well as overtop some other prominent VTEM/TDEM anomalies. Initial ground prospecting

was also performed in and around the areas of the Mal Lake nickel occurrence and the Borys Lake Zn-Pb-

Ag deposit. Results of this work will be released in the coming weeks as well.

Completion of First Year Anniversary Payment of Gochager Lake Earn-In Agreement

Fathom is also pleased to report that both the cash payment and share issuance required on or before

the date of the first-year anniversary of the Gochager Lake Earn-In Agreement (the “Agreement”) has now

been completed. Under the terms of the Agreement, Fathom was required to make a cash payment of

$15,000 and issue 170,000 shares in order to complete the First Anniversary requirements and earn a 10%

interest in the Gochager Lake property. However, a t the request of the vendor, the terms of the First

Anniversary requirements were amended to reduce the cash payment to $5,000 and i ncrease the share

issuance to 210,000 (the original 170,000 shares and additional 40,000 shares valued at $0.25 per share).

Commenting on the Agreement, Doug Porter, President and CFO stated, “ We were pleased when the

Gochager Lake vendor approached us and requested an amendment to the Agreement to weigh more

heavily towards the share issuance. This clearly demonstrates the vendor’s continued belief in the

potential of the Gochager Lake Property. Additionally, under the terms of the Agreement we are required

to spend $2 million on qualifying exploration expenditures within a 4-year period in order to earn a 100%

interest in the Gochager Lake Property . We are plea sed to announce that at the completion of the Fall

Drill Program we have now fulfilled this exploration spend commitment . W e expect to complete the

balance of the requirements under the Agreement (an additional cash paym ent of $7 0,000 and an

additional issuance of 600,000 shares) before the end of the year, at which point we will own 100% of the

Gochager Lake Project3.”

3– Subject to a 2% Net Smelter R eturn (“NSR”) Royalty. The NSR can be bought down to 1% based on a payment of $1,000,000

at Fathom’s option.

6

Quality Assurance / Quality Control (QA/QC) Disclosure Statement

Fathom implements an industry -standard QA/QC for all field and diamond drill programs. Fathom,

through the services of TerraLogic Exploration Inc., inserts QA/QC samples in its diamond drill programs

at a rate of one sample per approximately every 12 -13 samples collected. Standards sourced from CDN

Resource Laboratories and CCRMP were inserted into the sample stream at a rate of 1 in 30 samples.

Additionally, lab duplicates (coarse rejects) were inserted and positioned in the sample sequence at a rate

of 1 in 30 samples and positioned in the sample sequence alternating with standards to result in a QA/QC

insertion rate of no less than 1 in 15 samples. Blanks were inserted at the start of every sample batch and

additionally after samples of anticipated high-grade or high sulphide content.

Assaying is performed at ALS Canada Ltd. ALS is an accredited laboratory; (SCC – CAN-P-1579 and CAN-P-

4E ISO/IEC 17025) and is independent of Fathom. All drill core samples are analyzed using a 4 -Acid

digestion followed by 33 element ICP-AES analyses (Code ME-ICP61). Over limit Ni, Cu results are further

analyzed by 4 -Acid ore grade elements ICP -AES process (Code ME- OG62). Analyses for Au, Pd and Pt

utilized the ore grade Pt, Pd and Au by ICP-AES (Code PGM-ICP27). Total sulphur is analysed by (S-IR08).

Qualified Person and Data Verification

Ian Fraser, P.Geo., CEO, VP Exploration, and a Director of the Company and the "qualified person" as such

term is defined by National Instrument 43 -101, has verified the data disclosed in this news release, and

has otherwise reviewed and approved the technical information in this news release on behalf of the

Company.

About Fathom Nickel Inc.

Fathom is an exploration company that is targeting magmatic nickel sulphide discoveries to support the

rapidly growing global electric vehicle market.

The Company now has a portfolio of two high-quality exploration projects located in the prolific Trans

Hudson Corridor in Saskatchewan : 1) the Albert Lake Project, a 90,000+ hectare project that was host

to the historic and past producing Rottenstone deposit (produced high -grade Ni-Cu+PGE, 1965 -1969),

and 2) the Gochager Lake Project , 22,000+ hectare project host to a historic, NI43 -101 non-compliant

open pit resource ; the Gochager Lake deposit (4.3M tons at 0. 295% Ni and 0.08 1% Cu defined 1967 -

1970), an analogous drill tested nickel occurrence of drill intersections >1.% Ni (Mal Lake last drilled in

19674), and the Borys Lake Zn -Cu-Pb+Ag occurrence.

4 – Saskatchewan Mineral Deposit Index #0836

ON BEHALF OF THE BOARD

Ian Fraser, Chief Executive Officer & Vice-President Exploration

1-403-650-9760

Email: [email protected]

or

Doug Porter, President & CFO

1-403-870-4349

Email: [email protected]

7

Figure 2

Fathom Nickel Inc. Properties Saskatchewan Location Map

8

Forward Looking Statements:

This news release contains "forward -looking statements" that are based on expectations, estimates, projections and

interpretations as at the date of this news release. Forward -looking statements are frequently characterized by words such as

"plan", "expect", "project", "seek", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or

statements that certain events or conditions "may" or "will" occur, and include, without limitation, statements regarding payment

of terms under the Option Agreement , permitting for the Property, receipt of an exploration permit, timing of the exploration

program on the Property and the Company achieving the earn-in thresholds under the Option Agreement . Forward-looking

statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of

amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives,

assumptions or future events or performance are not statements of historical fact and may be "forward -looking statements."

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ

from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate

financing on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulat ory

risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to

environmental regulation and liability; the potential for delays in exploration or development activities or the completion o f

feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology,

grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the

potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future

exploration, development or mining results will not be consistent with the Company's expectations; risks related to commodity

price fluctuations; and other risks and uncertainties related to the Company's prospects, properties and business detailed

elsewhere in the Company's disclosure record. Such forward looking statements involve known and unknown risks, uncertainties

and other factors which may cause the actual resul ts, performance or achievements of the Company to be materially different

from any future results, performance or achievements expressed or implied by such forward-looking statements. These forward-

looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them

to reflect new events or circumstances except in accordance with applicable securities laws. Actual events or results could differ

materially from the Company's expectations or projections.