Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

APM.TO ·

ANDEAN PRECIOUS METALS PROVIDES UPDATE ON 2025 EXPLORATION RESULTS AT GOLDEN QUEEN AND SAN BARTOLOME Golden Queen Exploration Program Expanded by 3,800 metres Following Positive Results

Exploration Programs

NEWS RELEASE

TSX: APM OTCQX: ANPMF

1

ANDEAN PRECIOUS METALS PROVIDES UPDATE ON 2025

EXPLORATION RESULTS AT GOLDEN QUEEN AND SAN BARTOLOME

Golden Queen Exploration Program Expanded by 3,800 metres Following Positive Results

TORONTO, ON – October 16, 2025 – Andean Precious Metals Corp. (“Andean” or the “Company”)

(TSX: APM) (OTCQX: ANPMF) is pleased to provide an update on its 2025 exploration activities at its

Golden Queen mine located in Kern County, California, and San Bartolome operation located in Potosi,

Bolivia.

2025 Exploration Program Highlights:

Golden Queen

• Phase 3 program advancing with 4,300 metres of core drilling.

• 3,903 metres drilled at Hilltop (“HT” holes) (Please refer to Figure 1 below showing the location

of each exploration site) to date; all holes intersected projected veins.

• Assays confirm mineralized intervals, including:

• HT25-01: 0.79 grams per tonne (g/t) Au and 3 g/t Ag over 8.0m (drill metres)

• HT25-03: 1.94 g/t Au and 27 g/t Ag over 4.4m

• HT25-06 : 1.26 g/t Au and 15 g/t Ag over 5.8m and 5.11 g/t Au and 11 g/t Ag over 1.5m

• Infill drilling at Starlight Vein planned to support mine-life extension at Main Pit 2.

• Following the positive results extending mineralization along strike during the Phase 3

exploration program, the Company has approved an additional 3,800 metres of drilling, bringing

the total planned drilling to 8,100 metres for 2025.

• Updated mineral resource and reserve statement, with supporting technical report prepared in

accordance with National Instrument 43- 101 – Disclosure for Mineral Projects ( “NI 43 -101”),

anticipated in the first half of 2026.

San Bartolome

• Secured environmental exploration permits and social licenses in partnership with COMIBOL.

• Long-term COMIBOL agreement in place for the purchase of up to 7. 0 million tonnes of oxide

ore.

• Exploration underway at Turqui, Tacobamba, Ánimas, Santa Isabel, and Trapiche. (Please refer

to Figure 5 – Bolivia Exploration Project Locations)

• 5,500 metres of shallow core drilling to begin in Q4 2025, targeting ~800,000 tonnes grading

150–250 g/t Ag.

• Program designed to extend mine life and fully utilize the 5,000 tonnes per working day (tpd) mill

nameplate capacity without major capital investment.

NEWS RELEASE

TSX: APM OTCQX: ANPMF

2

Yohann Bouchard, President, commented, “Our exploration teams have made strong progress this year

at both Golden Queen and San Bartolom e. At Golden Queen, Phase 3 drilling has intersected

encouraging mineralized intervals that confirm continuity and support potential mine- life extensions,

while upcoming infill work at the Starlight Vein is designed to further expand Main Pit 2. In Bolivia, our

partnership with COMIBOL is advancing multiple targets under a long- term ore supply agreement that

secures access to up to 7 million tonnes of oxide ore. This program is designed to extend San

Bartolome’s mine life and maximize throughput of the existing 5,000 tpd mill without major capital spend.

Collectively, these initiatives highlight the quality of our asset base, reinforce the growth potential across

our portfolio, and position Andean as a growing Americas -focused precious metals producer. We look

forward to providing an updated resource and reserve statement, along with a supporting NI 43- 101

technical report, in the first half of 2026.”

Golden Queen Overview

After acquiring Golden Queen in late 2023, the Company adopted a multiphase strategy to expand

mineral resources and mineral reserves within the existing mining zones and to evaluate nearby targets

for potential to add to the current mineral resources and mineral reserves (“GQ Exploration Program”).

In 2024, the Company completed Phase 1 and Phase 2 of the GQ Exploration Program , consisting of

29 shallow infill reverse circulation (“RC”) drill hole s and 23 diamond drill holes , respectively. The RC

drilling confirmed mineral continuity at the Silver Queen Vein, Main Pit 2 and Main Pit 3. The 23 diamond

drill holes in Silver Queen Southwest Extension, Alphason, and the new Hilltop target also returned

favourable analytical results and are expected to contribute to development of new mineral resources

and mineral reserves.

The main highlights of Phase 1 and Phase 2 are the following:

.

• Phase 1 consisted of 29 shallow infill RC drill holes that were completed in July 2024 totaling

4,617 metres of drilling,12 RC holes (1,360 metres) in Silver Queen Vein, in Main Pit 2 and Main

Pit 3, confirming the geological model and;

• 17 RC holes (3,257 metres) in Alphason Target, tested the continuity of historic gold

mineralization identified prior to the Company’s acquisition.

• Silver Queen Southeast extension, 12 core holes (2,553 metres) were drilled, extending

mineralization 100 metres longitudinally, intercepting mineralization up to 1.67 g/t gold and 8 g/t

silver across 5.49 metres (DDH SQ24-06);

• Alphason, 7 core holes (1,196 metres) intercepted gold and silver mineralization, including hole

AL24-02 with 0.88 g/t Au and 10 g/t Ag across 92.96 metres;and

• Hilltop, 4 core holes (581 metr es) were drilled in this new target, all of which intercepted gold

and silver mineralization, including hole SQ24- 12 which intersected mineralization starting at

18.14 metres downhole, grading 1.67 g/t Au and 20 g/t Ag across 5.89 metres.

The Company released the results of the Phase 2 exploration campaign in a press release dated May

1, 2025.

Phase 3 – 2025 Golden Queen Exploration Program

The 2025 Exploration Program at Golden Queen initiated Phase 3. This phase consists of 4,300 metres

NEWS RELEASE

TSX: APM OTCQX: ANPMF

3

of core drilling and is focused on extending the mine life by exploring the Hilltop area, which represents

the southeast extension of the Silver Queen vein, as well as expanding current mining zones into areas

of limited exploration data, primarily the Starlight Vein in the southeast trend of Main Pit 2.

The Company is pleased to provide an update on Phase 3 of the 2025 Exploration Program:

• 20 core holes (3,903 metres) have been drilled at Hilltop, all intersecting projected veins, which

consist of low sulfidation- cryptocrystalline quartz veins and veinlets which are outcropping in the

area.

• Assay results for 6 core holes have been received. All 6 core holes report mineralized intervals,

and the main highlights are the following:

• Core hole HT25- 01 intersected 0.85 g/t Au and 9 g/t Ag across 5.2 metres, as well as

0.79 g/t Au and 3 g/t Ag across 8.0 metres.

• Core hole HT25-02: intersected 1.14 g/t Au and 14 g/t Ag across 0.7 metres.

• Core hole HT25-03 intersected 1.94 g/t Au and 27 g/t Ag across 4.4 metres.

• Core hole HT25-06 intersected 1.26 g/t Au and 15 g/t Ag across 5.8 metres.

• Core hole HT25-06 intersected 5.11 g/t Au and 11 g/t Ag across 1.5 metres.

• Longitudinal continuity of veins is being proved up to 280 metres on strike.

• Mineralization continuity is open to the southwest and at depth in the Silver Queen Vein and

Main Pit 1 and Main Pit 3.

The Company also plans to conduct infill drilling at the Starlight Vein, located in the southeast trend of

Main Pit 2, which is currently in production. This work is expected to provide additional geological

information to support the development of mineral resources and ultimately expand Main Pit 2 in this

direction.

Based on the positive outcomes achieved in the Phase 3 exploration program to date, the Company

has approved an additional 3,800 metres of core drilling to further expand and infilled the current mining

zone along strike. This brings the total Phase 3 drilling to 8,100 metres, which is expected to be

completed by the end of 2025.

The Company consistently updates its Golden Queen block model, integrating new geological data as

it becomes available. Mineral resources and mineral reserves are currently under development, with an

updated statement and accompanying technical report anticipated in the first half of 2026.

NEWS RELEASE

TSX: APM OTCQX: ANPMF

4

Figure 1 - 2025 Core Drill Holes

NEWS RELEASE

TSX: APM OTCQX: ANPMF

5

Figure 2 - 2025 Core Drill Holes at Hilltop

NEWS RELEASE

TSX: APM OTCQX: ANPMF

6

Figure 3 - Cross Section 600 (DDH’s HT25-03 and HT25-04)

NEWS RELEASE

TSX: APM OTCQX: ANPMF

7

Figure 4 - Cross Section 800 (DDH’s HT25-05 and HT25-06)

NEWS RELEASE

TSX: APM OTCQX: ANPMF

8

Table 1 - Composited Analytical Results – Hilltop Target

Hole ID Total

Depth (m)

Azimuth

(degrees)

Inclination

(degrees)

Analytical Results

From (m) To (m) Width (m) Au (g/t) Ag (g/t)

HT25-01 213 223 -57 16.4 21.6 5.2 0.85 9

40.7 41.5 0.8 0.44 3

47.7 55.6 8.0 0.79 3

58.3 60.9 2.7 0.46 3

77.1 77.9 0.8 0.69 3

80.2 81.1 0.9 0.59 5

HT25-02A 218 222 -74 26.9 28.3 1.5 0.80 10

26.9 27.6 0.7 1.14 14

31.8 33.1 1.3 0.43 9

40.4 42.8 2.4 0.57 4

40.4 41.3 0.9 0.99 4

HT25-03 201 225 -52 23.5 27.9 4.4 1.94 27

32.5 33.3 0.9 0.43 8

50.0 51.8 1.8 0.61 8

HT25-04 219 212 -68 34.9 43.8 8.9 0.42 14

59.0 63.9 4.9 0.36 9

66.6 67.2 0.6 0.50 10

70.0 70.7 0.8 0.57 14

80.6 81.7 1.1 0.33 21

185.6 187.9 2.3 0.39 1

HT25-05 197 225 -45 7.9 8.7 0.7 1.05 14

20.4 23.0 2.7 0.40 4

73.5 74.9 1.4 0.49 3

HT25-06 254 222 -66 7.9 13.7 5.8 1.26 15

30.2 31.7 1.5 5.11 11

212.2 212.9 0.7 1.20 7

Table Notes:

1. All drill and assay data originally reported in imperial units converted to metric.

2. 1302 HQ-sized core (63.5 mm diameter) were sampled with variable sample lengths. Mineralization widths are down-hole

lengths, true widths are not yet known.

3. A total of 1275 core samples plus 117 samples for QAQC purposes were submitted for analyses performed by Paragon

Geochemical; an ISO 17025 accredited analytical services provider with sample preparation and analytical facilities in Sparks,

NV, USA.

4. Paragon’s analytical methods used for gold were Au-FA 30 for gold and 48MA-MS for silver.

5. A 0.27 gold g/t cutoff grade used in compositing. No more than 2 consecutive values less than the cutoff were use. Grades

were not capped.