Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

BOLT.CN ·

Test Pit Results Confirm Near Surface High‐Grade Nickel/Cobalt Mineralization

Exploration Programs

Test Pit Results Confirm Near Surface High‐Grade Nickel/Cobalt Mineralization 

Highlights: 

 Sample intervals include; 5 metres of 1.80% and 6 metres of 1.53% nickel equivalent (NiEQ) 

 All test pits from surface to maximum depth of 6 metres  

 Sampling consistently confirming elevated nickel and cobalt values 

Vancouver, B.C. – June 20, 2019  –  Pacific Rim Cobalt Corp. (the “Company” or “Pacific Rim Cobalt”) (CSE: 

BOLT) (OTCQB: PCRCF) (FRANKFURT: NXFE) is pleased to announce test pit results from ongoing exploration 

at its flagship Cyclops, nickel/cobalt development project, Indonesia. The test pits are part of a 2019 multi‐

faceted  program  aimed  at  confirming  historical  results  and  providing  mineralized  material  for  process 

testing studies. 

A total of 9 shallow test pits were completed coincident with a reas of recent drilling in order to provide 

bulk samples for metallurgical testing as well as, confirm intersections in the near surface zone, and clarify 

the distribution and profile of the of high‐grade source laterite zone. 

Test pits ranged in depth from 1.7m to 6m. 

Results confirm elevated nickel coincides with widespread devel opment of green colored hydrous nickel 

magnesium silicates  (garnierite) and is indicator of high‐grade mineralization. 

Significant  elevated  cobalt  values  are  present  from  surface  to shallow  depths  in  iron  rich  limonite  and 

transition zones and is developed as a continuous horizon between drill holes. 

Test Pit Assay Results: 

  From (m)  To (m)  Length (m)  Nic kel (%)  Cobalt (%)  NiEQ (%) 

TP 200  0  5  5  0.99  0.14  1.38 

And  5  6  1  2.40  0.10  2.70 

TP 219  0  4  4  0.82  0.14  1.21 

And  4  6  2  1.75  0.13  2.11 

TP 201  0  3  3  1.15  0.14  1.54 

And  3  6  3  1.81  0.01  1.81 

TP 466  0  2  2  1.39  0.20  1.94 

And  2  5  3  1.40  0.01  1.44 

Including  2  4  2  1.65  0.03  1.72 

TP 220  0  6  6  1.00  0.20  1.53 

TP 203  0  2  2  0.88  0.12  1.22 

And  2  3  1  1.20  0.10  1.44 

TP 203B  0  5  5  1.36  0.16  1.80 

TP 222  0  3  3  1.05  0.13  1.42 

And  3  6  3  1.61  0.05  1.74 

Including  3  5  2  1.67  0.05  1.79 

TP 202  0  1.7  1.7  0.60  0.10  0.80 

TP 221  0  1  1  0.60  0.10  0.82 

And  1  1.7  0.7  1.60  0.10  1.78 

NiEQ  

calculation basis: cobalt price per 3 months (LME data) $34.25/kg; nickel price per 3 months (LME data) $12.45/kgC = 

ratio between cobalt price/nickel price; C = $34.25/$12.45 = $2.75; NiEQ = (%Co x C) + % Ni. No metallurgical recoveries 

were applied to either metal as it is expected that the metallurgical recoveries will be similar for both metals 

The  Cyclops  Project  area  located  in  Papua  Province,  Indonesia, benefits  from  excellent  infrastructure, 

including proximity to a work force and supplies, sealed roads, ocean access, nearby port facility, and gentle 

topography. The road system enables year‐round access to the project and connects it with the large town 

of  Sentani,  located  about  15  kilometres  (km)  to  the  east,  and  with  Jayapura,  the  capital  city  of  Papua 

province, located about 40 kms to the east. 

Sample Processing 

All sample results discussed in the press release are JORC comp liant with all protocols in place. Assaying 

was completed at the Geo Assay Laboratory ‐ PT. Geoservices, Cikarang, Jakarta. The Geo Assay Laboratory 

analysed the samples using the XRF fusion method. PT Geoservice s Ltd ‐ Geo Assay Laboratory employed 

industry standard internal QA/QC methods that Pacific Rim Cobalt reviewed and found acceptable. 

National Instrument 43‐101 Disclosure  

The  technical  content  of  this  news  release  has  been  reviewed  and  approved  by  Mr.  Garry  Clark,  PGeo, 

independent director of Pacific Rim Cobalt and a Qualified Pers on as defined by National Instrument 43‐

101. 

About Pacific Rim Cobalt 

Pacific Rim Cobalt is a Canadian‐based exploration company focu sed on the acquisition and development 

of production grade nickel and cobalt deposits, key raw material inputs for the growing lithium‐ion battery 

industry. Visit https://pacificrimcobalt.com/ to find out more.  

Pacific Rim Cobalt Corp. 

Ranjeet Sundher – President and CEO 

(604) 922‐8272 

[email protected] 

Steve Vanry – CFO & Director 

(604) 922‐8272 

[email protected] 

Sean Bromley – Director & Investor Contact 

(778) 985‐8934 

[email protected] 

Reader Advisory 

This news release may contain statements which constitute “forward‐looking information” that are subject 

to  risks  and  uncertainties.  All  statements  herein,  other  than  s tatements  of  historical  fact,  are  to  be 

considered  forward‐looking,  including  statements  regarding  the  plans,  intentions,  beliefs  and  current 

expectations of the Company, its directors, or its officers with respect to the future business activities of the 

Company  and  with  respect  to  the  results  of  exploration  and  prospective  plans  in  regards  to  the  Cyclops 

project.  The  words  “may”,  “would”,  “could”,  “will”,  “intend”,  “plan”,  “anticipate”,  “believe”,  “estimate”, 

“expect” and similar expressions, as they relate to the Company, or its management, are intended to identify 

such  forward‐looking  statements.  Although  the  Company  believes  the  expectations  expressed  in  such 

forward‐looking information are based on reasonable assumptions, such information is not a guarantee of 

future  performance  and  actual  results  or  developments  may  differ  materially  from  those  contained  in 

forward‐looking information. Information provided in this document is necessarily summarized and may not 

contain all available material information. Although Pacific Rim Cobalt has attempted to identify important 

factors  that  could  cause  actual  results,  performance  or  achieve ments  to  differ  materially  from  those 

contained in the forward‐looking statements, there can be other factors that cause results, performance or 

achievements not to be as antici pated, estimated or intended. F actors that could cause actual results to 

differ materially from those in f orward‐looking information inc lude, but are not limited to, fluctuations in 

market prices, success of the operations of the Company, continued availability of capital and financing and 

general economic, market or business conditions.  There can be  no assurances that such information will 

prove accurate and, therefore, readers should not place undue reliance on forward‐looking statements. The 

forward‐looking  statements  in  this  news  release  are  made  as  of t h e  d a t e  o f  t h i s  n e w s  r e l e a s e ,  a n d  t h e  

Company does not assume any obligation to update any forward‐lo oking information except as required 

under the applicable securities laws. 

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the 

policies  of  the  Canadian  Securities  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this 

release.