Saturday, October 31, 2026
MiningNewsTerminal
Saturday, October 31, 2026 Admin

CCD.V ·

(“Cascadero” or the “Company”) provides the following update: As a result of a review by the British Columbia Securities commission, we are issuing the following news release to clarify our disclosure. The Company disclosed a “non‐compliant resource” for the Taron project on its website. This

Regulatory & Compliance Marketing Announcement

Vancouver, British Columbia ‐‐ (September 6th 2017) – CASCADERO CORPORATION (TSXV: CCD) (“Cascadero” or the “Company”) provides the following update:

As a result of a review by the British Columbia Securities commission, we are issuing the following news release to clarify our disclosure.

The Company disclosed a “non‐compliant resource” for the Taron project on its website.  This information is not supported by a technical report, contrary to National Instrument 43‐101, and should not be relied on.  Taron does not have a mineral resource.

Bill McWilliam  Chairman  Email: [email protected] Office: 604.924.5504 ‐ Cell: 604.999.0391

ABOUT CESIUM 

Cesium,  (chemical  symbol  Cs)  is  a  rare  metal  best  known  for  its  extreme  chemical  reactivity. Approximately ~75% of the global cesium demand  is used to create cesium  formate compound.  The initial  application  of  cesium  formate  was  in  1996  in  the  North  Sea  on  difficult  high‐pressure  high‐ temperature (HPHT) deep offshore oil wells. It has developed into the oil extraction industry’s premium drilling and completion fluid. Cesium formate the premium formate brine drilling fluid for which there is, to date, no acceptable replacement. Cesium formates high‐density and low‐viscosity is used to control formation pressures and temperatures in oil well drilling where its use illuminates the use of toxic high‐ density suspended solids in the drilling fluid—a significant technological, engineering and environmental advantage.  It is safer to handle and does not damage the producing formation or down hole drilling equipment replacing corrosive barite muds and zinc bromide brines. Unlike the components of many other heavy liquids, cesium formate is relatively environment‐friendly as it is biodegradable, and has reduced the cost of disposing drill cut material.

The  global  cesium  fine  chemical  and  pharmaceutical  market  represents  ~25%  of  global  cesium consumption with high‐margin Cs compounds. As a dense medium, cesium formate is used in genetic engineering to separate deoxyribonucleic acid (DNA), it is used in metallurgical testing and floatation separation  on  light  and  heavy  materials,  and  is  also  well  known  for  artificially  produced  radioactive isotopes  used  to  treat  various  types  of  cancer,  such  as  brain  and  prostate.    Cesium  compounds  and chemicals  are  used  in  photo‐emissive  devices,  experimental  magneto‐hydrodynamic  electricity generation,  atomic  clocks  for  telecommunications  and  GPS  navigation  systems,  catalysts  in  plastic manufacturing, specialty glasses, ion propulsion rocket motors, high‐density alkaline batteries, coatings for solar cells, cesium catalysts in petroleum refining, manufacturing plastic and in food preparation. Research continues to generate new applications for cesium compounds.

THE CESIUM SUPPLY CHAIN 

Cascadero believes there is the likelihood of a cesium supply shortage in the near future that would result in higher cesium prices. For over twenty years, the global market demand for cesium has been supplied almost exclusively by two companies: Cabot Corporation and Bikita Minerals (PVT) Ltd.

Cabot Corporation’s underground mine and is also under Bernic Lake in Manitoba, Canada.  Cabot mines and  processes  the  cesium  ore  into  final  products,  making  it  the  dominant  global  supplier  of  cesium products. Until recently the Tanco mine was one of two mines that provided cesium rich pollucite and Cs compounds for the past 20 years.

The world’s  only other significant source of cesium is (was) Bikita  Minerals Ltd. Bikita is a pegmatite deposit located in Zimbabwe. It is an open pit mine that produces lepidolite (lithium) and pollucite to the global market along with Cabot Corp.

Cascadero  understands  that  the  Tanco  and  Bikita  mines  are  now  mining  their  stock  piles  and  have limited commercially valuable resources.  Anecdotal information from industry sources suggests that the Bikita Mine has <3 years of reserves in stockpiles.  It is unknown if the Tanco Mine is mining its pollucite resource.  However, Tanco has cesium low‐grade stockpiles for processing and it has a large inventory of Cs Formate worldwide. No other large‐scale pegmatite with cesium enriched pollucite has been found. Over four hundred LCT (Lithium‐Cesium‐Tantalum) type pegmatites have been drilled in Canada alone with minor successes. The lack of new cesium resource is a concern for the industry. The Company is hoping to address this impending resource gap with cesium bearing material from Taron.

In its annual report of 2016, Cabot issued the following statement regarding the situation at the Tanco Mine:

“However, the structural stability may change at any time and there is a possibility of deterioration and  flooding  of  this  mine.  While  we  have  not  mined  at  our  mine  in  Manitoba  since  we  completed  a  development  project  at  that  site  in  November  2015,  we  may  resume  those  mining  operations  in  the  future. The failure to adequately manage these risks could result in significant personal injury, loss of life,  damage to mineral properties, production facilities or mining equipment, damage to the environment,  delays in or reduced production, and potential legal liabilities.” 

CESIUM PRICING 

Information on cesium prices is difficult to secure.  Cesium is mined and final products are made and sold in private companies, which are not obligated to report their operating results. Cabot stated that effective April 12, 2017, or as contracts allow, it was increasing prices by up to 18% for its fine chemical product portfolio. Demand for Cabot’s fine cesium chemicals products increased in late 2016 and has continued into 2017. This price adjustment is required to support ongoing investments in Cabot’s fine cesium chemicals manufacturing facility co‐located with its mining operations in Manitoba, Canada.

Cascadero is conducting further research to establish a range of costs for cesium hydroxide and cesium formate for the resource estimate. Albemarle does not process pollucite or make cesium formate. Most Chinese  companies  do  not  process  pollucite  and  or  produce  cesium  formate  but  they  market  as  a reseller  from  a  variety  of  small  producers.    Pricing  information  by  Cabot  to  its  formate  customers  is closely held as the formate is leased and after use, the product is returned to Cabot for cleaning and reconstituting. The client is charged a lease fee, the cost of lost fluid, and the cost of reconstituting and cleaning. The lease price appears to be based on a cesium formate base price of ~US$50,000 per tonne of solution with a ~40% cesium content.  Once reconstituted with additional new formate, Cabot is able to lease the same volume of cesium formate several times.

R. Simpson, P. Geo, of GeoSim Services Inc. was the independent Qualified Person (QP) for the Taron Project.

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies  of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

Bill McWilliam  Chairman  Email: [email protected] Office: 604.924.5504 ‐ Cell: 604.999.0391