CanAlaska Plans Large 2026 Exploration Program at West McArthur Joint Venture $15 Million Program and Budget to Advance High-Grade Pike Zone Discovery 2026 Program will be Co-Funded on a Pro-Rata Basis
CanAlaska Plans Large 2026 Exploration
Program at West McArthur Joint Venture
$15 Million Program and Budget to Advance High-Grade Pike Zone Discovery
2026 Program will be Co-Funded on a Pro-Rata Basis
Saskatoon, Saskatchewan--(Newsfile Corp. - January 6, 2026) -
CanAlaska Uranium Ltd. (TSXV:
CVV)
(OTCQX: CVVUF) (FSE:
DH7)
("
CanAlaska
" or the "
Company
") is preparing for the start of the
approved $15 million exploration program on the West McArthur Joint Venture project (the "Project") in
the southeastern Athabasca Basin (Figure 1). The 2026 West McArthur program will focus on continued
step outs from the Pike Zone high-grade mineralization to evaluate for additional zones of high-grade
uranium mineralization and continuation of the associated large hydrothermal alteration system. The
West McArthur project, a Joint Venture with Cameco Corporation, is operated by CanAlaska that holds
an estimated 88.86% ownership in the Project as a result of sole-funding exploration in 2025. The 2026
exploration program will be co-funded by Cameco and CanAlaska under the Joint Venture.
Figure 1 – West McArthur Project Location
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2864/279518_a5a1084814546bfc_002full.jpg
2026 West McArthur Exploration Program
During the 2025 exploration program on the West McArthur Project, the Company successfully
completed a winter and summer drilling program. During the winter drilling program, the Company
significantly expanded the high-grade footprint of the Pike Zone and geochemical assay results confirm
the best drillholes to date on the project, including composite intervals in WMA079-01 which intersected
8.6 metres at 34.59% U
3
O
8
, including 5.5 metres at 53.90% U
3
O
8
at the unconformity and WMA076-
01 which intersected
14.8 metres at 14.71% U
3
O
8
, including 5.4 metres at 39.67% U
3
O
8
at the
unconformity (see News Release dated July 17
th
, 2025). During the summer program, the Company
focused on continued step outs from the Pike Zone high-grade mineralization footprint to evaluate for
additional zones of uranium mineralization and continuation of the associated large hydrothermal
alteration system. Results from the summer drill program indicate the strong hydrothermal alteration,
intense structural disruption, and uranium mineralization appear to be increasing to the southwest along
the C10S trend approximately 250 metres away from the high-grade zone. These results highlight the
potential for additional zones of high-grade unconformity-associated uranium mineralization to exist (see
News Release dated November 6
th
, 2025). The mineralized footprint of the Pike Zone at the
unconformity has now been traced over 500 metres with a 140-metre-long high-grade pod outlined by
multiple drill fences.
Figure 2 – 2026 Winter Drill Target Areas on West McArthur Project
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2864/279518_a5a1084814546bfc_004full.jpg
Starting in early January of 2026, the Company will have three drills working on the West McArthur
Project as part of the $15 million exploration program. The drill rigs will be focused on continued step
outs from the Pike Zone high-grade mineralization to evaluate for additional zones of uranium
mineralization and continuation of the associated large hydrothermal alteration system. During the 2026
winter exploration program, the primary focus will be step outs to the immediate southwest and northeast
along the C10S trend (Figure 2).
To the southwest of the high-grade core, the unconformity target area along the C10S trend was only
sparsely tested over 250 metres strike length during the 2025 summer drill program and remains
completely untested for approximately 800 metres further southwest where alteration and fault structures
were intersected in a previous drill program. No drilling of the C10S corridor has occurred from this area
to the southwest property boundary providing approximately 9 kilometres of untested target corridor.
To the northeast of the Pike Zone along the C10S trend, the unconformity target area remains very
sparsely tested with one drillhole completed approximately 500 metres along strike to the northeast
where alteration and fault structures were intersected in a previous drill program. Beyond this drillhole,
the C10S corridor to the northeast remains poorly tested over approximately six kilometres to the
northeastern property boundary with anomalous alteration, structure, and geochemistry identified on
multiple drill fences between the Pike Zone and 42 Zone.
Outside of the Pike Zone and 42 Zone mineralization areas on the Project, the 16-kilometre-long
C10/C10S conductive corridor remains relatively untested. Based on the recent positive results and the
already proven uranium endowment of the C10 and C10S corridors, the Company believes there is
significant potential for discovery of additional unconformity-related high-grade zones of uranium
mineralization.
As part of the 2026 exploration program, the Company is also completing a ground-based
electromagnetic survey to investigate the extension of the Epp Lake conductor on to the West McArthur
Project. A modern Stepwise Moving Loop Time Domain Electromagnetics survey, using the same
survey design that led to the discovery of the Pike Zone, is planned to advance this part of the West
McArthur Project. The survey will be completed by Abitibi Geophysics.
The geochemical assay results from the summer portion of the 2025 exploration program are pending.
CanAlaska CEO, Cory Belyk, comments,
"It is nice to have our joint venture partner return to funding
the West McArthur program in 2026. The CanAlaska team believes the 2025 program delivered on
our mandates: 1) to delineate and expand the known footprint of the high-grade uranium
mineralization at Pike Zone; and 2) to evaluate the nearby C10S corridor for additional uranium
mineralization. Both mandates were successfully met as part of the 2025 program and the Pike Zone
unconformity uranium mineralization now has a strike length of 500 metres and remains open in both
directions for potential expansion. We look forward to advancing the West McArthur project to the next
level of understanding in 2026."
About CanAlaska Uranium
CanAlaska is a leading explorer of uranium in the Athabasca Basin of Saskatchewan, Canada. With a
project generator model, the Company has built a large portfolio of uranium projects in the Athabasca
Basin. CanAlaska owns numerous uranium properties, totaling approximately 500,000 hectares, with
clearly defined targets in the Athabasca Basin covering both basement and unconformity uranium
deposit potential. The Company has recently concentrated on the West McArthur high-grade uranium
expansion with targets in 2024 and 2025 leading to significant success at Pike Zone. Fully financed for
the upcoming 2026 drill season, CanAlaska is focused on uranium deposit discovery and delineation in
a safe and secure jurisdiction. The Company has the right team in place with a track record of discovery
and projects that are located next to critical mine and mill infrastructure.
The Company's head office is in Saskatoon, Saskatchewan, Canada with a satellite office in Vancouver,
BC, Canada.
The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for
this news release is Nathan Bridge, MSc., P. Geo., Vice-President Exploration for CanAlaska Uranium
Ltd., who has reviewed and approved its contents.
On behalf of the Board of Directors
"Cory Belyk"
Cory Belyk, P.Geo., FGC
CEO, President and Director
CanAlaska Uranium Ltd.
Contacts:
Cory Belyk, CEO and President
General Enquiry
Tel: +1.306.668.6900
Tel: +1.306.668.6915
Email:
Email:
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Forward-looking information
All statements included in this press release that address activities, events or developments that the
Company expects, believes or anticipates will or may occur in the future are forward-looking
statements.
Forward-looking statements are frequently identified by such words as "may", "will",
"plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and
results. Forward-looking statements are based on the current opinions and expectations of
management.
These forward-looking statements involve numerous assumptions made by the
Company based on its experience, perception of historical trends, current conditions, expected future
developments and other factors it believes are appropriate in the circumstances. In addition, these
statements involve substantial known and unknown risks and uncertainties that contribute to the
possibility that the predictions, forecasts, projections and other forward-looking statements will prove
inaccurate, certain of which are beyond the Company's control.
Actual events or results may differ
materially from those projected in the forward-looking statements and the Company cautions against
placing undue reliance thereon.
The Company assumes no obligation to revise or update these
forward-looking statements except as required by applicable law.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/279518