Bam Bam Starts drilling at Majuba Hill Porphyry Copper Project
1
*Press Release October 5, 2021
Bam Bam Starts drilling at Majuba Hill
Porphyry Copper Project
VANCOUVER, BC — October 5, 2021 — Bam Bam Resources Corp. (CSE: BBR / OTC:
NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) is pleased to announce that the
2021 Reverse Circulation (RC) drilling is underway at the Majuba Hill Porphyry Copper
Project in Pershing County Nevada . Boart Longyear has m obilized a track to the
Copper Oxide Mineralized Zone and Majuba. Drill plans call for 2468 to 3353 meters
(8000 to 11,000 feet) in 11 to 15 reverse-circulation holes.
The drilling is focused on in-fill and expansion of the known oxide copper
mineralization identified in previous drilling and mined from the historic underground
Majuba Hill Mine.
Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody
The Company has implemented a QA/QC program using best industry practices at
the Majuba Hill Project. The samples are transported directly to the ALS Sample Prep
2
Facility in Reno or Elko, Nevada. ALS then transport s the prepared pulps to their
analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are
transported by the company directly to Elko or Reno, Nevada.
All samples are analyzed for copper, gold, silver, and 3 3 other elements. Gold is
determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30
gram split. Copper, silver and the remaining 31 elements are determined by ALS
method ME-ICP61 which is a four acid digestion and ICP -AES assay. Approximately
5% of the submitted samples are drill duplicates and copper-gold-porphyry
commercial standard reference material pulps . The sample rejects and remaining
pulps will be retrieved from ALS.
Marketing Agreement
Further, the Company has engaged TD Media, LLC, dba Life Water Media, to provide
digital marketing services to the Company for a term of 30 days, commencing on
October 4, 2021, in consideration of USD $200,000. Life Water Media will utilize its
online programs to generate a greater following, increase investor awareness and
attract new investors through many different online platforms and methods of
engagement.
Qualified Person
The scientific and technical information contained in this news release has been
reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non -independent consulting
geologist who is a "Qualified Person" as such term is defined under National
Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").
About Bam Bam Resources Corp.
Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the
identification, review and acquisition of latter stage copper and copper/ silver/gold
assets. This is in direct response to the growing worldwide demand and lack of supply
for precious metals fueled by the Green New Deal in the US and most other developed
nations with similar program s aimed at addressing climate change. Such programs
are heavily reliant on silver, gold and especially copper to produce Electric Vehicles
and other renewable power sources, as well as building infrastructure to provide clean
and affordable electricity.
The flagship project is the Majuba Hill copper , silver and gold District located 156
miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,
mining friendly jurisdictions where government regulations are supportive of mining
operations.
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is
3
defined in the policies of the Canadian Securities Exchange) accepts responsibility for
the adequacy or accuracy of this release.
On Behalf of the Board of Bam Bam Resources Corp.
“David Greenway”
David C. Greenway
President & CEO
For further information, please contact:
Joel Warawa
VP of Corporate Communications
P: 1 (855) 475-0745
Forward-Looking Statements
This news release contains certain statements that may be deemed "forward -looking" statements. Forward looking
statements are statements that are not historical facts and are generally, but not always, identified by the words
"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or
that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes
the expectation s expressed in such forward -looking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results may differ materially from those in forward
looking statements. Forward looking statements are b ased on the beliefs, estimates and opinions of Bam Bam
Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources
Corp. undertakes no obligation to update these forward -looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change.
###