Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

NTH.V ·

Nord Precious Metals Prepares 3D Geological and Structural Model for Follow-Up Drill Program

Exploration Programs

Nord Precious Metals Prepares 3D Geological and Structural Model

for Follow-Up Drill Program

February 24, 2025 - Nord Precious Metals Mining Inc. (TSX.V: NTH) (OTCQB: CCWOF)

(FRANKFURT: 4T9B) (the "Company" or "Nord") has prepared a scope of work for tender for

geological consultants to develop a geological model for the Castle East Project. Having completed

over 60,000 meters of drilling and identified over five main vein structures including the Robinson

vein, Big Silver vein, Archean silver vein and All Stars veins in the recent drill programs, the Company

will proceed to integrate the data to optimize follow-up drill holes for resource expansion. Nord has

identified potentially over 10 veins, but a systematic review is required to potentially group these veins

into larger structures using key findings from structural measurements, past and current geophysical

surveys as well as mine plans from existing and past-producing mines.

Data to be Integrated into Revised 3D Model:

- Historic Mine Plans from both the Castle and Capitol Mines

- Drill hole data

o Develop a comprehensive lithological and alteration model incorporating Nord

drilling and historical drilling of the broader area

o Improving the structural model

- Historic IP/Resistivity

- Recent IP/Resistivity

- UAV magnetic survey

- Borehole EM

- MPASS survey

Results will be compiled into a 3D model and will include recommendations for follow-up drill holes.

Matthew Halliday, P.Geo. Director, commented, “There is a wealth of knowledge on the project that

can now be incorporated into a comprehensive model improving the understanding of both the Silver

deposit model and the Gold mineralization model. Much of the data has already been incorporated but

there is still work to do to ensure that all the data is compiled and interpreted into a single model before

the start of drilling program.”

Nord Precious Metals Mining Inc.

3028 Quadra Court

Coquitlam, B.C., V3B 5X6

www.nordpreciousmetals.com.

Page 2 of 3

Qualified person

The technical information in this news release was approved and prepared under the supervision of Mr.

Matthew Halliday, P.Geo., (PGO), Director of Nord Precious Metals, a qualified person in accordance with

National Instrument 43-101.

About Nord Precious Metals Mining Inc.

Nord Precious Metals Mining Inc. operates the only permitted high-grade milling facility in the historic

Cobalt Camp of Ontario, where the Company has established a unique position integrating high-grade

silver discovery with strategic metals recovery operations. The Company's flagship Castle property

encompasses 63 sq. km of exploration ground and the past-producing Castle Mine, complemented by

the Castle East discovery where drilling has delineated 7.56 million ounces of silver in Inferred

resources grading an average of 8,582 g/t Ag (250.2 oz/ton).

Nord's integrated processing strategy leverages the synergistic value of multiple metals. High-grade

silver recovery supports the economics of extracting critical minerals including cobalt, nickel, and

other battery metals, while the company's proprietary Re-2Ox hydrometallurgical process enables

production of technical-grade cobalt sulphate and nickel-manganese-cobalt (NMC) formulations. This

multi-metal approach, combined with established infrastructure including TTL Laboratories and

underground mine access, positions Nord to capitalize on both precious metals markets and the

growing demand for battery materials.

The Company maintains a strategic portfolio of battery metals properties in Northern Quebec including

its 35% ownership in Coniagas Battery Metals Inc. (TSXV: COS) as well as the St. Denis-Sangster

lithium project comprising 260 square kilometers of prospective ground near Cochrane, Ontario.

More information is available at www.nordpreciousmetals.com.

“Frank J. Basa”

Frank J. Basa, P. Eng.

Chief Executive Officer

For further information, contact:

Frank J. Basa, P.Eng.

Chief Executive Officer

416-625-2342

or:

Wayne Cheveldayoff,

Corporate Communications

P: 416-710-2410

E: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Page 3 of 3

Caution Regarding Forward-Looking Statements

This news release may contain forward-looking statements which include, but are not limited to, comments that involve future

events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts,

comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of

mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees

of future performance and actual results may vary materially from those statements. General business conditions are factors

that could cause actual results to vary materially from forward-looking statements. The Company does not undertake to

update any forward-looking information in this news release or other communications unless required by law.