Monday, September 21, 2026
MiningNewsTerminal
Monday, September 21, 2026 Admin

NEWD.CN ·

Great Thunder Gold Contemplates Spinout of Lithium Projects

Mergers & Acquisitions

Great Thunder Gold Contemplates Spinout of Lithium Projects  

October  21st,  2020,  Vancouver,  British  Columbia – Great  Thunder  Gold  Corp. ( CSE:  GTG  OTC: 

GTGFF  FSE:  M4KQ-FF) ( “ G r e a t  T h u n d e r”  o r  t h e  “ C o m p a n y” )  i s  c o n t e m p l a t i n g  t h e  t r a n s fer  of  its 

Canadian lithium exploration projects to a new subsidiary (a “SpinCo”) that would be spun out to 

the shareholders of Great Thunder . The Company’s Board of Directors will evaluate the merits of 

this transaction. 

Highlights: 

‐ Great Thunder can focus on the exploration and development of its gold projects situated 

in the Fenelon Gold Camp and to pursue greater assets for potential acquisition. 

‐ The  lithium  projects,  currently 100%‐owned  by  Great  Thunder  Gold ,  c a n  m o v e  f o r w a r d ,  

potentially garnering the value they deserve, as a lithium‐focused SpinCo with exploration 

and development. 

‐ Increase in positive demand from the Electric Vehicle/Battery manufacturers for lithium. 

Great Thunder can make no assurance that a spinout will take place as it would be subject to several 

conditions  that  include  Board  approval,  satisfying  the  Canadian  Securities  Exchange  (the  “CSE”) 

listing requirements, the assessment of legal and tax ramifications, determining final details of the 

transaction, receipt of all regulatory approvals, any required shareholder approval, the availability 

of financing for the new subsidiary, and market conditions. The Company will provide further details 

if and when available in accordance with the policies of the CSE. 

About the Lithium Projects 

The Chubb and Bouvier lithium properties are located in the Preissac‐Lacorne plutonic complex of 

the Abitibi Greenstone Belt near Val d’Or, Quebec. The Chubb Lithium Project is situated within 

the Preissac‐Lacorne plutonic complex of the Abitibi Greenstone  Belt, the complex forming one 

of  the  best  prospective  areas  for  lithium  mineralization.  The  plutonic  complex  generated  the 

Quebec Lithium Project – located 60 kilometres north of Val d’O r, Quebec – for which Canada 

Lithium Corp. reported proven and probable reserves of 17.1 mil lion tonnes grading 0.94% Li 2O 

according to a feasibility study update by Canada Lithium Corp. dated October 12, 2012. 

The  Chubb  Lithium  Project  lies  32  kilometres  north  of  Val  d’Or and  consists  of  35  contiguous 

recorded mineral claims with a total area of 1,509 hectares. The property’s geology is dominated 

by quartz monzodiorite and metasomatized quartz diorite (tonalite). A swarm of spodumene‐rich 

g r a n i t i c  p e g m a t i t e  d y k e s  i n t r u d e  f r a c t u r e s  a n d  s m a l l  f a u l t s  w i thin  the  plutonic  rocks.  The 

pegmatite dykes are 1 to 6 metres thick, oriented 345° – 350° and vary in length from 25 to 250 

metres. They are crudely zoned, some having quartz cores and border zones of aplite. The granitic 

pegmatites are composed of quartz, albite and/or cleavelandite, K‐feldspar, muscovite, with 5 to 

25%  spodumene.  There  are  three  important  granitic  pegmatite  dykes  containing  spodumene 

mineralization (Dyke #1, #2 and Main Dyke). 

Exploration of the Chubb Lithium Project persists since the early 1950s and has consisted mainly 

of  mapping,  trenching,  geophysical  surveys,  and  diamond  drilling.  The  best  historical  drilling 

intersections were obtained in 1994 by Abitibi Lithium Corp., producing intervals of 3.72 m @1.78 

wt. % Li2O, 2.75 m @1.00 wt. % Li2O and 2.38 m @1.25 wt. % Li2O. In 2010, Mineral Hill Industries 

Ltd.  carried  out  magnetic  and  IP  geophysical  surveys,  mapping,  channel  sampling  and  grab 

sampling in the area surrounding t he three principal spodumene‐ bearing dykes. The main dyke 

– which is 300 m long – was shown to have Li2O concentration of 1.00 wt. % (n=41). 

In December 2017, Great Thunder dr illed 3 holes for a total of  306 m.  Hole C‐17‐01 returned 

1.33% Li2O over 5.3 m from 55 to 60,3 m and 1,15% Li 2O over 2.1 m from 64 to 66.1 m and hole 

C‐17‐02 gave 0.9% Li2O over 3.6 m from 32.8 to 36.4 m. 

The  Bouvier  property  is  located within  the  Preissac‐Lacorne  plutonic  complex  of  the  Abitibi 

Greenstone  Belt,  in  the  Saint‐Mathieu  municipality  of  Figuery  To w n s h i p  ( N T S  m a p  s h e e t  ‐  2  ‐  

32D08). The geological setting and structure of the volcano‐sed imentary assemblages form an 

ideal  host  for  lithium‐rich  pegmatites  being  located  between  th e  Northern  Manneville 

Deformation Zone and the northern edge of the fertile Lacorne monzogranite pluton. The Bouvier 

property consists of 16 contiguous recorded mineral claims for  a total area of 692 hectares or 

6.92  square  kilometres.  Spodumene‐bearing  granitic  pegmatite  dykes  occur  only  south  of  the 

Manneville  Fault  and  were  emplaced  principally  in  metasediments.  The  dykes  are  oriented 

parallel to the Manneville Fault  and can reach 100 m in length  and 10 m in apparent thickness. 

In 2010, Mineral Hill Industries Ltd. carried out an exploratio n program involving line cutting, a 

magnetic and IP survey, trenching and panel and grab rock sampl ing. The work unearthed EW‐

oriented spodumene‐bearing granit ic pegmatites parallel to the  Manneville Deformation Zone. 

The main dyke displayed an average lithium concentration of 1.51 Li2O wt. % (n=20).  

Qualified Person 

Donald Théberge, P .Eng., M.B.A. an independent qualified person as defined in National Instrument 

43‐101, has reviewed and approved the technical contents of this news release on behalf of the 

Company. 

About Great Thunder Gold 

Great Thunder Gold is a junior Canadian mining exploration company focused on exploration and 

development along the Detour Gold trend in Quebec. The Company is one of the largest mineral 

claim  holders  next  to  the  leading  Wallbridge  Mining  (post‐comple t e d  m e r g e r  w i t h  B a l m o r a l  

Resources). 

On Behalf of the Board of Directors, 

GREAT THUNDER GOLD CORP . 

“Blair Naughty” 

President & CEO 

Investor Relations 

Email: [email protected] 

Direct Line: (236) 513‐4653 

www.greatthundergold.com 

Forward-Looking Statement 

This  news  release  contains  forward‐looking  statements  and  forward‐looking  information  (collectively,  "forward‐

looking statements") within the  meaning of applicable Canadian  securities legislation. All statements, other than 

statements of historical fact, included herein including, without limitation, statements regarding the planned spinout 

of the Company’s lithium exploration projects to a new subsidiary, the listing of the shares of the new subsidiary on 

a stock exchange, the future value of such shares and the acquisition of additional exploration projects, are forward‐

looking  statements.  Often,  but  no t  a l w a y s ,  f o r w a r d  l o o k i n g  i n f ormation  can  be  identified  by  words  such  as  "pro 

forma",  "plans",  "expects",  "will",  "may",  "should",  "budget",  "scheduled",  "estimates",  "forecasts",  "intends", 

"anticipates", "believes", "potential" or variations of such words including negative variations thereof, and phrases 

that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved.  

In  making  the  forward‐looking  statements  in  this  news  release,  the  Company  has  made  certain  assumptions, 

including without limitation, the receipt of all necessary perm issions and regulatory approvals in connection with 

the  planned  spinout  and  exploration  project  acquisitions,  that the  COVID‐19  global  pandemic  will  not  affect  the 

ability of the Company to carry out its plans, and the availability of financing on suitable terms. 

Forward‐looking statements involve known and unknown risks, uncertainties and other factors which may cause the 

actual  results,  performance  or  achievements  of  the  Company  to  d iffer  materially  from  any  future  results, 

performance or achievements expressed or implied by the forward‐looking statements. Such risks and other factors 

include, among others, the abilit y of the Company’s proposed su bsidiary to obtain suffici ent financing to fund its 

operations and planned exploration and to meet stock exchange listing requirements, delays in obtaining regulatory 

and other approvals, changes in laws, regulations and policies  affecting mining operations and public companies, 

title disputes or claims, and environmental issues and liabilities.  

Readers are cautioned not  to  place  undue  reliance  on  forward‐looking statements.  The  Company undertakes  no 

obligation to update any of the forward‐looking statements in t his news release except as otherwise required by 

law.