Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

LOD.V ·

Lode Gold Evaluates Underground Mining Potential at Dingman Gold Project (Ontario) & Initiates New Geological Model (MRE: 376,000 Oz Au M&I + 47,000 Oz Au Inferred)

Exploration Programs

Lode Gold Evaluates Underground Mining

Potential at Dingman Gold Project (Ontario) &

Initiates New Geological Model (MRE: 376,000

Oz Au M&I + 47,000 Oz Au Inferred)

Vancouver, British Columbia--(Newsfile Corp. - February 2, 2026) -

Lode Gold Resources Inc (TSXV:

LOD) (OTCQB: LODFF)

(the "Company" or "Lode Gold") is pleased to announce the initiation of a

new

geological model

, including

lithological and structural

interpretations, for its wholly owned Dingman

Gold Project located in Ontario, Canada, currently with a NI 43-101 resource of 376,000 Oz Au using

0.94 g/t Au cutoff in measured and indicated categories and 47,000 Oz Au in inferred category with a

cutoff of 0.71 g/t Au. Lode Gold is evaluating options to advance Dingman project and unlock value for

shareholders. Options being explored include seeking a joint venture partner or a spin out.

Dingman Property Location

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4064/282387_858ec6a834af6a8a_001full.jpg

This is a centrally located project in Hastings county, Ontario, 175 km northeast of Toronto. The project is

road accessible with regional infrastructure in the prolific Timmins Ontario gold camp which has

produced over 70 million ounces

[1]

gold historically and with projects in operations for 110 years.

Timmins is known globally with worldclass mines deep mining heritage, strong government incentives,

streamlined permitting, and strong local support and mining services sector and community nearby.

The Dingman Project has historically been evaluated using an

open-pit mining concept

, including a

Preliminary Economic Assessment ("PEA") completed in 2013

, which demonstrated positive

project economics at a gold price of

US$1,800/oz

.

This is a brownfields project with an excess of 22,000 m of diamond drilling a previously completed

NI

43-101 Technical Report

and Mineral Resource Estimate completed in 2022.

The project is road

accessible, approximately 100 km from Belleville and 150 km from Kingston.

Based on a recent technical review, the Company believes that the geological framework of the deposit

supports a re-evaluation focused on

structurally controlled, higher-grade gold mineralization

with

potential application for

underground mining methods

.

Geological Modelling Approach

The new geological model will focus on defining

shear-hosted gold structures

that exhibit strong

structural controls within the Dingman granite and associated alteration zones. These structures are

interpreted to form

continuous mineralized bands approximately 5 to 10 metres in width

, which

may be amenable to

underground extraction

.

This approach differs from previous interpretations that applied broader grade envelopes optimized for

open-pit scenarios. The updated geological model aims to improve the understanding of mineralization

controls, continuity, and geometry, and to better align the project with

current gold prices

and modern

underground mining concepts.

The Company notes that this shift in geological focus at Dingman is conceptually similar to the

evolution

of its Fremont Gold Project

in California. At Fremont, early evaluations emphasized open-pit concepts,

while subsequent work demonstrated that structurally controlled, higher-grade mineralization was more

appropriately assessed within an underground mining framework. Lode Gold believes that a comparable

re-interpretation at Dingman may provide a more accurate representation of the deposit's geometry,

grade distribution and development potential under current gold market conditions.

Future Mineral Resource Estimation

Upon completion of the new geological model, the Company intends to proceed with a

new Mineral

Resource Estimate ("MRE")

, which will be completed in accordance with

NI 43-101

standards and

reviewed by independent Qualified Persons.

The forthcoming MRE will incorporate the updated geological interpretation and will form the technical

foundation for future project evaluation and development studies at Dingman.

Technical Commentary

Jonathan Hill, Director and Chair of the Technical Committee of Lode Gold, commented:

"The geological model is the critical first step in re-evaluating Dingman. By focusing on the structural

controls and higher-grade mineralization, we are building a framework that more accurately reflects

the geometry and continuity of mineralization. This work will directly inform a future Mineral Resource

Estimate aligned with underground mining concepts."

Next Steps

Work on the geological model is currently underway. Lode Gold will provide further updates as the

interpretation advances and upon the completion of the revised Mineral Resource Estimate.

Dingman Gold Project (Ontario)

The Dingman Gold Project is an advanced exploration-stage brownfield gold project located in Ontario,

Canada, with a history of technical evaluation and economic studies. The project was the subject of a

Preliminary Economic Assessment completed in 2013

, which demonstrated economic viability

under an open-pit mining scenario at a gold price of

US$1,800/oz

. A

subsequent mineral resource

update completed in

2022

outlined a total resource of

376,000 Oz Au using a 0.94 g/t cutoff grade

(COG) in the Measured and Indicated categories and 47,000 Oz Au in the Inferred category

using a 0.71 g/t COG

. To date, the project remains largely undeveloped and has not progressed

beyond the study stage.

Dingman is hosted within a large intrusive system and exhibits strong structural controls on gold

mineralization. While historical work focused on broad grade envelopes suitable for open-pit mining,

Lode Gold believes that, similar to its Fremont Gold Project, a modern geological reinterpretation

emphasizing

structurally controlled, higher-grade shear zones

may better reflect the geometry and

continuity of mineralization and support the evaluation of

underground mining potential

under current

gold price conditions. The project benefits from a favorable tenure structure, with

no land or option

payments, and no required assessment work filings until 2031

, providing flexibility as technical

work advances.

Qualified Person

The technical information contained in this press release was reviewed and approved by Gary Wong,

P.Eng., Vice President Exploration of Lode Gold Resources Inc., designated as a Qualified Person

under National Instrument 43-101.

About Lode Gold

Lode Gold has key assets in Canada and United States.

Fremont Gold Project (Fremont Gold Mining LLC)

is a brownfield project in Mariposa, California

with 43,000 m drilled, 8,000 channel samples, 14 adits and 2 shafts.

Mining halted in 1942 due to the

gold mining prohibition during WW II.

It was mined at 10.7 g/t when price was gold was $35 per oz.

PEA

was completed (

link

) in 2023.

The PEA was based on 1M oz (M&I) and 2M (Inferred).

MRE (

link

) was

updated in 2025; 92% of the ounces were left unmined. Average true widths at 1g/t cut off is 53m.

Project sits on > 3,000 acres of 100% owned private and patented land which is designated as OZ,

Trump Administration Opportunity Zone (Special Tax Incentives).

Gold Orogen (1475039 B.C. Ltd)

is an early-stage exploration pure play with quality assets in the

Yukon and New Brunswick, Canada. Optionality exists as assets are diversified on two mineral belts that

are known to have prolific gold endowment.

A 19.9% strategic partner was brought in and a joint venture was formed to create one of the largest land

packages in New Brunswick with mineral rights spanning 445km

2

.

The New Brunswick assets, McIntyre Brook and Riley Brook

sit on a highly prospective belt that

has seen many exciting discoveries including Dalradian, New Found Gold and Calibre Mining. Kinross-

Puma surrounds McIntyre Brook.

In the Yukon, Golden Culvert/WIN

sits on the southern end of the Tombstone Belt which in recent

years has seen extensive exploration success. It has Reduced Intrusion (RIRGS) targets and

sedimentary hosted orogenic mineralization. Over 4,500 m has been drilled with 50 gram meter

intercepts.

The completion of Gold Orogen's spin out into a public company via an RTO is imminent, presenting a

unique and compelling opportunity to unlock shareholder value as two standalone public companies with

clear trajectory for growth will be created.

Dingman Property

is an orogenic deposit in Ontario, Canada with over 22,000 m drilled, with a 2013

PEA, MRE (

link to report

): 376,000 oz (M&I) and 47,000 oz (Inferred).

ON BEHALF OF THE COMPANY

Wendy T. Chan

CEO & Director

[email protected]

+1-(604)-977-GOLD (4653)

Kevin Shum

Investor Relations

[email protected]

+1 (604) -977-GOLD (4653)

Cautionary Statement Regarding Forward-Looking Information

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release includes "forward-looking statements" and "forward-looking information" within the

meaning of Canadian securities legislation. All statements included in this news release, other than

statements of historical fact, are forward-looking statements including, without limitation, statements with

respect to the use of proceeds, advancement and completion of resource calculation, feasibility studies,

and exploration plans and targets. Forward-looking statements include predictions, projections and

forecasts and are often, but not always, identified by the use of words such as "anticipate", "believe",

"plan", "estimate", "expect", "potential", "target", "budget" and "intend" and statements that an event or

result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and

includes the negatives thereof.

Forward-looking statements are based on a number of assumptions and estimates that, while

considered reasonable by management based on the business and markets in which the Company

operates, are inherently subject to significant operational, economic, and competitive uncertainties, risks

and contingencies. These include assumptions regarding, among other things: the status of community

relations and the security situation on site; general business and economic conditions; the availability of

additional exploration and mineral project financing; the supply and demand for, inventories of, and the

level and volatility of the prices of metals; relationships with strategic partners; the timing and receipt of

governmental permits and approvals; the timing and receipt of community and landowner approvals;

changes in regulations; political factors; the accuracy of the Company's interpretation of drill results; the

geology, grade and continuity of the Company's mineral deposits; the availability of equipment, skilled

labour and services needed for the exploration and development of mineral properties; and currency

fluctuations.

There can be no assurance that forward-looking statements will prove to be accurate and actual results,

and future events could differ materially from those anticipated in such statements. Important factors that

could cause actual results to differ materially from the Company's expectations include a deterioration of

security on site or actions by the local community that inhibits access and/or the ability to productively

work on site, actual exploration results, interpretation of metallurgical characteristics of the

mineralization, changes in project parameters as plans continue to be refined, future metal prices,

availability of capital and financing on acceptable terms, general economic, market or business

conditions, uninsured risks, regulatory changes, delays or inability to receive required approvals,

business disruptions, and other exploration or other risks detailed herein and from time to time in the

filings made by the Company with securities regulators, including those described under the heading

"Risks and Uncertainties" in the Company's most recently filed MD&A. The Company does not

undertake to update or revise any forward-looking statements, except in accordance with applicable law.

[1]

https://files.ontario.ca/ndmnrf-geotours-3/ndmnrf-geotours-timmins-en-2021-12-13.pdf

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/282387